ENS 47312
From kanterella
Jump to navigation
Jump to search
ENS Event | |
---|---|
05:00 Oct 2, 2011 | |
Title | Shutdown Required by Technical Specifications Due to Transformer Fault |
Event Description | This event is being reported in accordance with 10CFR50.72(b)(2)(i). On October 2, 2011, at approximately 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> [EDT], the Perry Nuclear Power Plant commenced a controlled plant shutdown. The shutdown was due to the anticipated investigation and expected repair time of the Unit 1 startup transformer exceeding the Technical Specification (TS) Required Action completion time.
On September 29, 2011, at 0529 hours0.00612 days <br />0.147 hours <br />8.746693e-4 weeks <br />2.012845e-4 months <br /> [EDT] the Unit 1 startup transformer failed due to an internal fault, which required entry into TS 3.8.1 Action A.2 for one required offsite circuit inoperable. The determination has been made that the required action, which is to restore the required offsite circuit to OPERABLE status, cannot be met by the required completion time and a plant shutdown is being initiated. The NRC Resident Inspector has been notified. The licensee expects to have the Unit offline between 1300-1400 hours [EDT] and plans to issue a press release. |
Where | |
---|---|
Perry Ohio (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
LER: | 05000440/LER-2011-002 |
Time - Person (Reporting Time:+-3.9 h-0.163 days <br />-0.0232 weeks <br />-0.00534 months <br />) | |
Opened: | James Pry 01:06 Oct 2, 2011 |
NRC Officer: | Steve Sandin |
Last Updated: | Oct 2, 2011 |
47312 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 47312\u003C/a\u003E - \u003Ca href=\"/Perry\" title=\"Perry\"\u003EPerry\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EShutdown Required by Technical Specifications Due to Transformer Fault\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 47312 - Perry\n","link":"","lat":41.79572777777778,"lon":-81.145375,"icon":"/w/images/a/ad/FirstEnergy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (98 %) |
WEEKMONTHYEARENS 571362024-05-23T08:00:00023 May 2024 08:00:00
[Table view]10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown ENS 530002017-10-04T06:50:0004 October 2017 06:50:00 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown, 10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material Perry Commenced Technical Specification Required Shutdown ENS 516792016-01-24T02:22:00024 January 2016 02:22:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Ts Required Shutdown Due to Unidentified Leakage in Drywell ENS 498042014-02-07T11:00:0007 February 2014 11:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Plant Shutdown Required by Technical Specifications Due to Containment Isolation Valve Over Leak Rate Limit ENS 491212013-06-16T04:00:00016 June 2013 04:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown, 10 CFR 50.72(b)(3)(ii)(A), Seriously Degraded Technical Specification Shutdown Due to Small Reactor Coolant Leak on a Recirculation Flow Control Valve Vent Line ENS 473122011-10-02T05:00:0002 October 2011 05:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Shutdown Required by Technical Specifications Due to Transformer Fault ENS 459182010-05-12T03:18:00012 May 2010 03:18:00 10 CFR 50.72(b)(2)(iv)(B), RPS System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Manual Reactor Scram Due to Loss of Control Rod Drive Charging Water Header Pumps ENS 454342009-10-15T16:25:00015 October 2009 16:25:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Unit Commenced Shutdown Due to Inoperable Division 2 Emergency Service Water System ENS 416572005-05-02T10:11:0002 May 2005 10:11:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown - Reactor Vessel Level Instrumentation ENS 410852004-10-02T19:00:0002 October 2004 19:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Reactor Power Being Reduced Due to Entering Ts 3.0.3 Because of Inopeable Recirc Vent System ENS 407672004-05-21T20:00:00021 May 2004 20:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Shutdown 2024-05-23T08:00:00 | |