MONTHYEARML20209H5051999-07-14014 July 1999 Proposed Tech Specs Pages 3.1-15 & 3.1-17 of Table 3.1.1 ML20209E0951999-07-0707 July 1999 Proposed Tech Specs,Changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20212H5441999-06-18018 June 1999 Proposed Tech Specs Reflecting Installation of Addl SFP Storage Racks That Will Accommodate Increase in Spent Fuel Assemblies Beyond Existing Storage Capacity of SFP as Described in Licensing Rept ML20195D0761999-06-0303 June 1999 Proposed Tech Specs,Permitting Plant Operation with Three Operable Recirculation Loops ML20205P8531999-04-15015 April 1999 Proposed Tech Specs,Modifying Number of Items in Sections 2 & 3 of Tss,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4 ML20198K0671998-12-23023 December 1998 Proposed Tech Specs Pages 3.8-2 & 4.8-1,changed to Specify Surveillance Frequency of Once Per Three Months ML20195C6561998-11-10010 November 1998 Proposed Tech Specs Section 5.1.A,removing Restriction on Sale or Lease of Property within Exclusion Area ML20155J7501998-11-0505 November 1998 Proposed Tech Specs,Modifying Safety Limits & Surveillances of LPRM & APRM Sys & Related Bases to Ensure APRM Channels Respond within Necessary Range & Accuracy & to Verify Channel Operability ML20151V5091998-09-0303 September 1998 Proposed Tech Specs 3.4.A.10.e & 3.5.A.2.e Re Condensate Storage Tank Level ML20237D9591998-08-21021 August 1998 Proposed Tech Specs Removing Requirement for ADS Function of EMRV to Be Operable During Rv Pressure Testing & Correcting Note H of Table 3.1.1 ML20237B2221998-08-0606 August 1998 Proposed Revised Tech Specs Pages for Change Request 205,dtd 961031,correcting Minor & Inadvertent Editorial Changes in Locations Where Changes Have Not Been Proposed ML20236T1211998-07-23023 July 1998 Proposed Tech Specs Pages for Amend to License DPR-16,to Establish That Existing SLMCPR Contained in TS 2.1.A Is Applicable for Next Operating Cycle (Cycle 17) ML20236T4981998-07-21021 July 1998 Proposed Tech Specs Re Reactivity Control ML20236T4811998-07-21021 July 1998 Proposed Tech Specs Re Changes to Administrative Controls ML20236J1431998-06-30030 June 1998 Proposed Tech Specs,Consisting of Revised Page 3-5 Re RPV Pressure/Temp Limits ML20236H2181998-06-29029 June 1998 Proposed Tech Specs,Modifying EDG Insp Requirement Previously Submitted in Entirety ML20248K2851998-05-28028 May 1998 Proposed Tech Specs Re That Such First Type a Test Required by Primary Containment Leakage Rate Testing Program Be Performed During Refueling Outage 18R ML20197G2771997-12-23023 December 1997 Proposed Tech Specs Reflecting Change in Trade Name of Owner & Operator of Oyster Creek Nuclear Generating Station ML20197J2561997-12-10010 December 1997 Proposed Tech Specs Changing Pages 2.3-6,2.3-7,3.1-11, 3.1-14,3.1-16,3.4-8,3.8-2,3.8-3,4.3-1,4.5-13 & 6-1 ML20210L3311997-08-15015 August 1997 Proposed Tech Specs,Incorporating Note Which Indicates That Proposed Change to SL Mcrp Applicable for Current Operating Cycle (Cycle 16) Only ML20135C2001996-11-27027 November 1996 Proposed Tech Specs Pages 4.7-1,4.7-2,4.7-3 & 4.7-4 Re Surveillances for Station Batteries ML20129K3401996-11-12012 November 1996 Proposed Tech Specs,Consisting of Change Request 224, Implementing Revised 10CFR20, Stds for Protection Against Radiation Effective 910620 ML20134H0541996-10-31031 October 1996 Proposed Tech Spec,Requesting Deletion of Table 3.5.2 ML20129C0691996-10-10010 October 1996 Proposed Tech Specs,Clarifying Functional Requirement to Provide Interlock Permissive Which Ensures Source of Cooling Water Available Via Core Spray Sys Prior to Depressurization ML20129A5731996-10-10010 October 1996 Proposed Tech Specs,Revising Addl Group of Surveillances Where Justification Completed Following Receipt of Amend 144 ML20134F4101996-10-0404 October 1996 Proposed Tech Specs 2.1.A & 3.10.C to Reflect Change in SLMCPR & Revise Operating CPR Limit for Stability, Respectively ML20117E7061996-08-23023 August 1996 Proposed Tech Specs,Proposing New pressure-temp Limits Up to 22,27 & 32 EFPY Based on Predicted Nilductility Adjusted Ref Temp for Corrresponding EFPY of Operation ML20115G2101996-07-17017 July 1996 Proposed Tech Specs,Allowing Implementation of 10CFR,App J, Option B ML20113A8641996-06-19019 June 1996 Proposed Tech Specs Table of Contents,1.24 Re Footnote to definition,1.25 Re Definition,Section 3.5.A.3b Re Containment,Section 4.5 Re Containment,Bases for Section 4.5 & Section 6.9.3.b Re Reporting Requirements ML20111A3841996-05-0707 May 1996 Proposed Tech Specs,Adopting Provisions of STS NUREG-1433, Rev 1,dtd 950407,Sections SR 3.0.1,3.0.3 & Associated Bases ML20107E7751996-04-15015 April 1996 Proposed Tech Specs 5.3.1 Re Handling Heavy Loads Over Irradiated Fuel ML20101J7681996-03-28028 March 1996 Proposed Tech Specs,Modifying Statements in TS & Bases to Correctly Reflect Ref Parameter for Anticipatory Scram Signal Bypass ML20101J6091996-03-25025 March 1996 Proposed Tech Specs,Deleting Spec Which Requires Thorough Insp of EDG Every 24 Months During Shutdown ML20100J9151996-02-23023 February 1996 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B ML20100H9971996-02-22022 February 1996 Proposed Tech Specs 3.7-1,3.7-2,4.7-1 & 4.7-2 Re Deletion of TS Requirement to bi-annually Inspect EDG & Mod of Spec Re AOT ML20095C1031995-12-0505 December 1995 Proposed Tech Specs Re Rev of Submittal Date for Annual Exposure Data Rept Bringing Plant Into Conformance w/10CFR20.2206 & Relaxing Overly Restrictive Administrative Requirement ML20086A7161995-06-26026 June 1995 Proposed Tech Specs Re Performance of Reactor Shutdown & Drywell to Inspect Snubbers in Svc for Only 12 Months ML20080P6501995-02-28028 February 1995 Proposed Tech Specs Change Request 225 Re Change to Page 6-4 of Tech Spec Section 6.5.1.12.Change Consistent w/NUREG-1433,STSs General Electric Plants,BWR/4,Rev 0,dtd 920928 ML20078N3791995-02-0808 February 1995 Proposed Tech Specs Re Oyster Creek Spent Fuel Pool Expansion ML20078Q6481994-12-15015 December 1994 Revised TS & Bases Pages to Section 3.1 of TS Change Request 191 ML20078M1431994-11-25025 November 1994 Proposed TS 5.3.1.E,allowing 2,645 Fuel Assemblies to Be Stored in Fuel Pool ML20072S2921994-09-0202 September 1994 Proposed Tech Specs Supporting Rev of APRM Channel Calibr Interval from Weekly to Quarterly ML20072L4741994-08-19019 August 1994 Proposed Tech Specs Control Rod Exercising & Standby Liquid Control Pump Operability Testing ML20070E3411994-07-0808 July 1994 Proposed Tech Specs Re Improved Protection to Safety Related Electrical Equipment from Loss of Capability ML20078A7731994-06-24024 June 1994 Proposed Tech Specs Reflecting Removal of Recirculation Flow Scram ML20069M8231994-06-15015 June 1994 Proposed Tech Spec 2.3.D, Reactor High Pressure,Relief Valve Initiation ML20070R5261994-05-12012 May 1994 Proposed TS Sections 3.1 & 4.1 for Protective Instrumentation ML20029E0451994-05-0606 May 1994 Proposed Tech Specs Clarifying Requirements for Demonstrating Shutdown Margin ML20065M9991994-04-19019 April 1994 Proposed Tech Specs Updating & Clarifying TS 3.4.B.1 to Be Consistent W/Existing TS 1.39 & 4.3.D Re Five Electromatic Relief Valves Pressure Relief Function Inoperable or Bypassed During Sys Pressure Testing ML20029C7571994-04-15015 April 1994 Proposed TS Change Request 215,deleting Audit Program Frequency Requirements from TS 6.5.3 & Utilize Operational QA Plan as Controlling Document 1999-07-07
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212B5741999-09-0505 September 1999 Rev 11 to 2000-ADM-4532.04, Oyster Creek Emergency Offsite Dose Calculation Manual ML20209H5051999-07-14014 July 1999 Proposed Tech Specs Pages 3.1-15 & 3.1-17 of Table 3.1.1 ML20209E0951999-07-0707 July 1999 Proposed Tech Specs,Changing Component Surveillance Frequencies to Indicate Frequency of Once Per Three Months ML20212H5441999-06-18018 June 1999 Proposed Tech Specs Reflecting Installation of Addl SFP Storage Racks That Will Accommodate Increase in Spent Fuel Assemblies Beyond Existing Storage Capacity of SFP as Described in Licensing Rept ML20195D0761999-06-0303 June 1999 Proposed Tech Specs,Permitting Plant Operation with Three Operable Recirculation Loops ML20205P8531999-04-15015 April 1999 Proposed Tech Specs,Modifying Number of Items in Sections 2 & 3 of Tss,Expanding Two Definitions in Section 1 & Modifying Bases Statements in Sections 2,3 & 4 ML20198K0671998-12-23023 December 1998 Proposed Tech Specs Pages 3.8-2 & 4.8-1,changed to Specify Surveillance Frequency of Once Per Three Months ML20195C6561998-11-10010 November 1998 Proposed Tech Specs Section 5.1.A,removing Restriction on Sale or Lease of Property within Exclusion Area ML20155J7501998-11-0505 November 1998 Proposed Tech Specs,Modifying Safety Limits & Surveillances of LPRM & APRM Sys & Related Bases to Ensure APRM Channels Respond within Necessary Range & Accuracy & to Verify Channel Operability ML20151V5091998-09-0303 September 1998 Proposed Tech Specs 3.4.A.10.e & 3.5.A.2.e Re Condensate Storage Tank Level ML20237D9591998-08-21021 August 1998 Proposed Tech Specs Removing Requirement for ADS Function of EMRV to Be Operable During Rv Pressure Testing & Correcting Note H of Table 3.1.1 ML20198H4831998-08-13013 August 1998 Rev 1 to Procedure 5000-ADM-7350.06 (EMP-002), Modifications ML20237B2221998-08-0606 August 1998 Proposed Revised Tech Specs Pages for Change Request 205,dtd 961031,correcting Minor & Inadvertent Editorial Changes in Locations Where Changes Have Not Been Proposed ML20236T1211998-07-23023 July 1998 Proposed Tech Specs Pages for Amend to License DPR-16,to Establish That Existing SLMCPR Contained in TS 2.1.A Is Applicable for Next Operating Cycle (Cycle 17) ML20236T4811998-07-21021 July 1998 Proposed Tech Specs Re Changes to Administrative Controls ML20236T4981998-07-21021 July 1998 Proposed Tech Specs Re Reactivity Control ML20236J1431998-06-30030 June 1998 Proposed Tech Specs,Consisting of Revised Page 3-5 Re RPV Pressure/Temp Limits ML20236H2181998-06-29029 June 1998 Proposed Tech Specs,Modifying EDG Insp Requirement Previously Submitted in Entirety ML20248K2851998-05-28028 May 1998 Proposed Tech Specs Re That Such First Type a Test Required by Primary Containment Leakage Rate Testing Program Be Performed During Refueling Outage 18R ML20197G2771997-12-23023 December 1997 Proposed Tech Specs Reflecting Change in Trade Name of Owner & Operator of Oyster Creek Nuclear Generating Station ML20197J2561997-12-10010 December 1997 Proposed Tech Specs Changing Pages 2.3-6,2.3-7,3.1-11, 3.1-14,3.1-16,3.4-8,3.8-2,3.8-3,4.3-1,4.5-13 & 6-1 ML20198J8831997-09-10010 September 1997 Rev 8 to Procedure 5000-ADM-7311.02 (EP-009), Design Verification ML20210L3311997-08-15015 August 1997 Proposed Tech Specs,Incorporating Note Which Indicates That Proposed Change to SL Mcrp Applicable for Current Operating Cycle (Cycle 16) Only ML20135C2001996-11-27027 November 1996 Proposed Tech Specs Pages 4.7-1,4.7-2,4.7-3 & 4.7-4 Re Surveillances for Station Batteries ML20129K3401996-11-12012 November 1996 Proposed Tech Specs,Consisting of Change Request 224, Implementing Revised 10CFR20, Stds for Protection Against Radiation Effective 910620 ML20134H0541996-10-31031 October 1996 Proposed Tech Spec,Requesting Deletion of Table 3.5.2 ML20129C0691996-10-10010 October 1996 Proposed Tech Specs,Clarifying Functional Requirement to Provide Interlock Permissive Which Ensures Source of Cooling Water Available Via Core Spray Sys Prior to Depressurization ML20129A5731996-10-10010 October 1996 Proposed Tech Specs,Revising Addl Group of Surveillances Where Justification Completed Following Receipt of Amend 144 ML20134F4101996-10-0404 October 1996 Proposed Tech Specs 2.1.A & 3.10.C to Reflect Change in SLMCPR & Revise Operating CPR Limit for Stability, Respectively ML20117E7061996-08-23023 August 1996 Proposed Tech Specs,Proposing New pressure-temp Limits Up to 22,27 & 32 EFPY Based on Predicted Nilductility Adjusted Ref Temp for Corrresponding EFPY of Operation ML20115G2101996-07-17017 July 1996 Proposed Tech Specs,Allowing Implementation of 10CFR,App J, Option B ML20113A8641996-06-19019 June 1996 Proposed Tech Specs Table of Contents,1.24 Re Footnote to definition,1.25 Re Definition,Section 3.5.A.3b Re Containment,Section 4.5 Re Containment,Bases for Section 4.5 & Section 6.9.3.b Re Reporting Requirements ML20111A3841996-05-0707 May 1996 Proposed Tech Specs,Adopting Provisions of STS NUREG-1433, Rev 1,dtd 950407,Sections SR 3.0.1,3.0.3 & Associated Bases ML20107E7751996-04-15015 April 1996 Proposed Tech Specs 5.3.1 Re Handling Heavy Loads Over Irradiated Fuel ML20101P1561996-03-31031 March 1996 Rev 9 to Oyster Creek Nuclear Generating Station Pump & Valve IST Program ML20101J7681996-03-28028 March 1996 Proposed Tech Specs,Modifying Statements in TS & Bases to Correctly Reflect Ref Parameter for Anticipatory Scram Signal Bypass ML20101J6091996-03-25025 March 1996 Proposed Tech Specs,Deleting Spec Which Requires Thorough Insp of EDG Every 24 Months During Shutdown ML20100J9151996-02-23023 February 1996 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B ML20100H9971996-02-22022 February 1996 Proposed Tech Specs 3.7-1,3.7-2,4.7-1 & 4.7-2 Re Deletion of TS Requirement to bi-annually Inspect EDG & Mod of Spec Re AOT ML20095C1031995-12-0505 December 1995 Proposed Tech Specs Re Rev of Submittal Date for Annual Exposure Data Rept Bringing Plant Into Conformance w/10CFR20.2206 & Relaxing Overly Restrictive Administrative Requirement ML20086A7161995-06-26026 June 1995 Proposed Tech Specs Re Performance of Reactor Shutdown & Drywell to Inspect Snubbers in Svc for Only 12 Months ML20080P6501995-02-28028 February 1995 Proposed Tech Specs Change Request 225 Re Change to Page 6-4 of Tech Spec Section 6.5.1.12.Change Consistent w/NUREG-1433,STSs General Electric Plants,BWR/4,Rev 0,dtd 920928 ML20078N3791995-02-0808 February 1995 Proposed Tech Specs Re Oyster Creek Spent Fuel Pool Expansion ML20078Q6481994-12-15015 December 1994 Revised TS & Bases Pages to Section 3.1 of TS Change Request 191 ML20078M1431994-11-25025 November 1994 Proposed TS 5.3.1.E,allowing 2,645 Fuel Assemblies to Be Stored in Fuel Pool ML20073F9501994-09-26026 September 1994 Revised Plan for Long Range Planning Program for Oyster Creek Nuclear Generating Station ML20073F9411994-09-26026 September 1994 Revised Plan for Long Range Planning Program for TMI Nuclear Station Unit 1 ML20072S2921994-09-0202 September 1994 Proposed Tech Specs Supporting Rev of APRM Channel Calibr Interval from Weekly to Quarterly ML20072Q4251994-08-20020 August 1994 Rev 0 to Oyster Creek Nuclear Generating Station Sea Turtle Surveillance,Handling & Reporting Instructions for Operations Personnel ML20072L4741994-08-19019 August 1994 Proposed Tech Specs Control Rod Exercising & Standby Liquid Control Pump Operability Testing 1999-09-05
[Table view] |
Text
- .
l l
l Revised Technical Specification Pages 1
i i
M A
KO 9
I
s a
4.4 Eh1ERGENCY COOL ING Apolicability: Applies to surveillance requirements for the emergency cooling systems.
Objective:
To verify the operability of the emergency cooling systems.
Specification: Surveillance of the emergency cooling systems shall be performed as foibws:
Item Freauency A. Core Sorav System
- 1. Pump Operability Once/3 months. Also afler major maintenance and prior to startup following a refueling outage.
- 2. Motor operated valve Once/3 months operability
- 3. Automatic actuation test Every three months
- 4. Pump ompartment water-Once/ week and after each entry tight wrs closed
- 5. Cere s, ay header 4P ins., nentation Check Once/ day Calibrate Once/3 months Test Once/3 months B. Automatic Depressurization
- 1. Valve operability Once every 24 months *
)
- 2. Automatic actuation test Every refueling outage b
C. Containment Gooline Smtem
- 1. PumpOperability Once/3 months. Also after major maintenance and prior to startup following a refueling outage.
- Ve!"e operability shall be demonstrated at system operating pressure i
prior te exceeding 5 percent power, following a refueling outage.
OYSTER CREEK 4.4-1 Amendment No. 109,144,193 i
4 Item Freauency C. Containment Cooline System
- 2. Motor-operated valve operability Every 3 months
- 3. Pump compartment water-Once/ week and after each entry tight doors closed D. Emercency Service Water System
- 1. Pump Operability Once/3 months. Also after major maintenance and prior to startup following a refueling outage.
E. Control Rod Drive Hydraulic System
- 1. PumpOperability Once/ month. Also after major maintenance and prior to startup following a refueling outage.
F. Fire Protection System
- 1. Pump Operability Once/ month. Also after major maintenance and prior to startup following a refueling outage.
- 2. Isolation valve operability Once/3 months. Also after major maintenance and prior to startup following a refueling outage.
Bases:
It is during major maintenance or repair that a system's design intent may be violated accidentally.
Therefore, a functional test is required after every major maintenance operation. During an extended outage, such as a refueling outage, major repair and maintenance may be performed on many systems. To be sure that these repairs on other systems do not encroach unintentionally on critical standby cooling systems, they should be given a functional test prior to startup.
Motor operated pumps, valves and other active devices that are normally on standby should be exercised periodically to make sure that they are free to operate. Motors on pumps should operate long enough to approach equilibrium temperature to ensure there is no overheat problem.
Whenever practical, valves should be stroked full length to ensure that nothing impedes their motion. Testing of components per OC Inservice Testing Program in accordance with ASME i
Section XI once every 3 months provides assurances of the availability of the system. The Control Rod Ilydraulic pumps and Fire Protection System pumps are not part of the Inservice Test Program per ASME Section XI and will continue to be tested for operability once per month.
Engineeringjudgment based on experience and availability analyses of the type presented in Appendix L of the FDSAR indicates that testing these components more often than once a month over a long period of time does not significantly improve the system reliability. Also, at this frequency of testing wearout should not be a problem through the life of the plant.
OYSTER CREEK 4.4-2 Amendment No.: 109,160
I)uring tests of the electromatic relief valves, steam from the reactor vessel will be discharged directly to l
the absorption chamber pool. Scheduling the tests in conjunction with the refueling outage permits the tests to be run at low power, prior to 5 percent power, enhancing the safety of the plant by assuring EMRV operability before higher power levels are reached.
The control rod drive hydraulic system is normally in operation, thereby providing continuous indication of system operability. A check of flow rate and operability can be made during normal operation.
i i
m 1
OYSTER CREEK 4.4-3 1
r-l the valve or its associated actuator by cycling the valve through at least one complete cycle of full travel and verifying the isolation j
time limit is met. Following maintenance, repair or replacement work on the control or power circuit for tne valves, the affected component shall be tested to assure it will perform its intended function in the circuit.
3.
Quarterly, during periods of sustained POWER OPERATION, each main steam isolation valve shall be closed (one at a time) and its closure time verified to be within the limits of Specification 4.5.F.1 above. Such testing shall be conducted with reactor power not greater than 50% of rated power.
1 4.
Reactor Building to Suppression Chamber Vacuum Breakers j
The reactor building to suppression chamber vacuum breakers a.
and associated irstrumentation, including setpoint, shall bc checked for proper operation every three months.
l b.
During each REFUELING OUTAGE, each vacuum breaker shall be tested to determine that the force required to open the vacuum breaker from closed to fully open does not exceed the f
force specified in Specification 3.5.A.4.a. The air-operated vacuum breaker instrumentation shall be calibrated during each REFUELING OUTAGE.
I 5.
Pressure Suppression Chamber-Drywell Vacuum Breakers a.
Periodic OPERABILITY Tests Once every 3 months and following any release of energy which would tend to increase pressure to the suppression chamber, each OPERABLE suppression chamber - drywell vacuum breaker shall l'e exercised. Operation of position switches, indicators and alarms shall be verified every 3 months by operation of each OPERABLE vacuum breaker.
b.
REFUELING OUTAGE Tests (1)
All suppression chamber - drywell va.:uum breakers shall be tested to determine the force required to open each valve from fully closed to fully open.
(2)
The suppression chamber - drywell vacuum breaker position indication and alarm systems shall be calibrated and functionally tested.
OYSTER CREEK 4.5-3 Amendment No.: 144,186,196 i
L.
1 l
i Surveillance of the suppression chamber-reactor building vacuum breakers consists of OPERABILITY checks and leakage tests (conducted as part of the containment leak-tightness tests). These vacuum breakers are normally in the closed position and open only during tests or an accident condition. As a result, a testing frequency of three months for OPERABILITY is considered justined for this equipment.
l Inspections and calibrations are performed during the REFUELING OUTAGES, this frequency being based on equipment quality, experience, and engineering judgement.
j The 14 suppression chamber-drywell vacuum relief valves are designed to open to the i
full open position (the position that curtain area is equivalent to valve bore) with a j
force equivalent to a 0.5 psi differential acting on the suppression chamber face of the valve disk. This opening specification assures that the design limit of 2.0 psid j
between the drywell and external environment is not exceeded. Once each REFUELING OUTAGE, each valve is tested to assure that it will open fully in response to a force less than that speciGed. Also, it is inspected to assure that it closes freely and operates properly.
The containment design has been examined to establish the allowable bypass area z
between the drywell and suppression chamber as 10.5 in (expressed as vacuum breaker open area). This is equivalent to one vacuum breaker disk offits seat 0.371 inch; this length corresponds to an angular displacement of 1.25. A conservative allowance of 0.10 inch has been selected as the maximum pennissible valve opening.
Valve closure within this limit may be determined by light indication from two independent position detection and indication systems. Either system provides a control room alarm for a non-seated valve.
At the end of each refueling cycle, a leak rate test shall be performed to verify that signiGcant leakage flow paths do not exist between the drywell and suppression chamber. The drywell pressure will be increased by at least 1 psi with respect to the suppression chamber pressure. The pressure transient (if any) will be monitored with 1
a sensitive pressure gauge. If the drywell pressure cannot be increased by 1 psi over the suppression chamber pressure it would be because a signincant leakage path exists; in this event, the leakage source will be identined and eliminated before POWER OPERATION is resumed. If the drywell pressure can be increased by 1 psi over the suppression chamber, the rate of change of the suppression chamber pressure must not exceed a rate equivalent to the rate of air How from the drywell to the suppression chamber through a 2-inch orifice. In the event the rate of change of pressure exceeds this value, then the source ofleakage will be identined and eliminated before POWER OPERATION is resumed.
The drywell suppression chamber vacuum breakers are exercised every 3 months and immediately following termination of discharge of steam into the suppression chamber. This monitoring OYSTER CREEK 4.5-12 Amendment No.: 128,186,196