MONTHYEARIR 05000155/20240012024-10-31031 October 2024 NRC Inspection Report No. 07200043/2024001; 05000155/2024001 Big Rock Point Independent Spent Fuel Storage Installation PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 PNP 2024-019, Updated Final Hazards Summary Report, Revision 192024-06-0404 June 2024 Updated Final Hazards Summary Report, Revision 19 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 07200043/20234012024-02-0505 February 2024 Public-Big Rock Point (BRP) Independent Spent Fuel Storage Installation (ISFSI) - NRC Security Inspection Report 07200043/2023401 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point PNP 2023-015, License Termination Plan, Revision 42023-05-16016 May 2023 License Termination Plan, Revision 4 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, And Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 And Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-013, 2022 Radiological Environmental Operating Report2023-04-12012 April 2023 2022 Radiological Environmental Operating Report 05000155/LER-1923-001, Human Performance Error Resulted in Compensatory Measures Not Properly Employed2023-04-11011 April 2023 Human Performance Error Resulted in Compensatory Measures Not Properly Employed L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-009, Report of Changes, Tests and Experiments and Summary of Commitment Changes2023-03-28028 March 2023 Report of Changes, Tests and Experiments and Summary of Commitment Changes PNP 2023-003, Independent Spent Fuel Storage Installation Radioactive Effluent Release Report2023-02-15015 February 2023 Independent Spent Fuel Storage Installation Radioactive Effluent Release Report L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22215A1472022-08-0303 August 2022 & Big Rock Point Plant - Update Report for Holtec Decommissioning International (HDI) Fleet Decommissioning Quality Assurance Program (DQAP) Revision 2 ML22213A0092022-07-27027 July 2022 2022 Holtec Palisades, LLC and Holtec Decommissioning International, LLC ANI Certified Copy Endorsements for Palisades Nuclear Plant and Big Rock Point Nuclear Generating Plant ML22182A4982022-07-0101 July 2022 And Big Rock Point Plant, Indemnity Agreements ML22173A1732022-06-28028 June 2022 And Big Rock Point Plant - Issuance of Amendment Nos. 129 and 273 Order Approving Transfer of Licenses and Conforming License Amendments (EPIDs L-2022-LLM-0002 and L-2020-LLM-0003) ML22178A0772022-06-24024 June 2022 (HDI) Satisfactory Documentary Evidence Required Before the Planned Closing Date of the Purchase and Sale Transaction of Palisades Nuclear Plant and Big Rock Point Plant PNP 2022-019, & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals2022-06-24024 June 2022 & Big Rock Point - Notification of Expected Date of Transfer of Ownership of Nuclear Plants to Holtec Palisades, LLC; and Notification of Receipt of All Required Regulatory Approvals ML22096A3042022-05-0909 May 2022 And Big Rock Point Plant - New Information Regarding Order Approving Transfer of Licenses (EPIDs L-2022-LLM-0002 and L-2020-LLM-0003) PNP 2022-003, And Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report2022-04-25025 April 2022 And Big Pock Point Plant - 2021 Annual Radioactive Effluent Release and Waste Disposal Report ML22104A0782022-04-14014 April 2022 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML22088A2552022-03-29029 March 2022 Change for NRC Distribution Lists Re Entergys Vice President, Regulatory Assurance ML22087A5002022-03-28028 March 2022 And Palisades Nuclear Power Plant - Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) -- Entergy Nuclear Operations, Inc ML22081A2992022-03-21021 March 2022 Entergy Operations, Inc - Summary of Property Damage Insurance Coverage ML22073A1892022-03-14014 March 2022 River Bend Nuclear Station; and Waterford Steam Electric Station, Unit 3 - Proof of Financial Protection (10 CFR 140.15) PNP 2022-001, 2021 ISFSI Annual Radioactive Effluent Release Report2022-02-24024 February 2022 2021 ISFSI Annual Radioactive Effluent Release Report ML22025A3422022-01-25025 January 2022 And Big Rock Point - Changes to Site Organization ML22021B6702022-01-21021 January 2022 And Big Rock Point - Supplement to Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments ML21354A7452021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination ML21349A3742021-12-15015 December 2021 ISFSI, Decommissioning Funding Plans (10 CFR 72.30) ML21292A1452021-12-13013 December 2021 And Big Rock Point Plant - Order Approving Transfer of Licenses and Draft Conforming Administrative License Amendments (EPID L-2020-LLM-0003) (Letter) ML21302A0642021-10-29029 October 2021 And Big Rock Point - Supplement to Application for Order Consenting to Transfers of Control of Licenses and Approving Conforming License Amendments IR 07200043/20214012021-07-29029 July 2021 Independent Spent Fuel Storage Installation Security Inspection Report 07200043/2021401 PNP 2021-023, Biennial Update License Termination Plan2021-05-19019 May 2021 Biennial Update License Termination Plan ML21111A1782021-04-21021 April 2021 And Big Rock Point, Submittal of 2020 Annual Radioactive Effluent Release and Waste Disposal Report ML21054A1322021-04-14014 April 2021 U.S. NRC Analysis of Entergy Nuclear Operations, Incs Initial and Updated Decommissioning Funding Plans for the Big Rock Point, Indian Point, Pilgrim, Palisades, Fitzpatrick, and Vermont Yankee Independent Spent Fuel Storage Installations ML21091A1472021-04-0101 April 2021 Annual Report for Entergy Quality Assurance Program Manual and Indian Point Energy Center Quality Assurance Program Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d) Notification of Application of Approved Appendix B to ML21089A3222021-03-30030 March 2021 Entergy Operations, Inc and Entergy Nuclear Operations, Inc. - Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML21084A8112021-03-25025 March 2021 Indian Point Nuclear Generating, Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) and 10 CFR 50.82(a)(8)(v) ML21084A7892021-03-25025 March 2021 Entergy Nuclear Operations, Inc. Status of Funding for Managing Irradiated Fuel for Year Ending December 31, 2020 - 10 CFR 50.82(a)(8)(vii) PNP 2021-009, 2020 ISFSI Annual Radioactive Effluent Release Report2021-02-25025 February 2021 2020 ISFSI Annual Radioactive Effluent Release Report 2024-08-02
[Table view] |
Text
SUBJECT:
BIG ROCK POINT (BRP) INDEPENDENT SPENT FUEL STORAGE INSTALLATION - NRC SECURITY INSPECTION REPORT 07200043/2023401
Dear Mike Mlynarek:
On January 8, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Big Rock Point (BRP) Independent Spent Fuel Storage Installation (ISFSI) and discussed the results of this inspection with Thomas LaCroix and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
February 5, 2024 The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely, Michael E. Ziolkowski, Chief Security, Emergency Preparedness, and Incident Response Branch Division of Radiological Safety and Security Docket No. 07200043 Enclosure:
As stated cc w/encl: Thomas LaCroix, BRP Site Project Manager Signed by Ziolkowski, Michael on 02/05/24 Letter to from M. Ziolkowski dated February 05, 2024.
SUBJECT:
BIG ROCK POINT (BRP) - INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 07200043/2023401 DISTRIBUTION w/encl:
Douglas Garner Christian Jacobs Matthew Learn David Hills SOSBInspRptDistro@usnrc.onmicrosoft.com DISTRIBUTION w/o encl:
John Giessner Mohammed Shuaibi David Curtis Jared Heck Shelbie Lewman Diana Betancourt-Roldan Allan Barker Aaron McCraw Viktoria Mitlyng Prema Chandrathil Carmen Olteanu Non-Public Designation Category: MD 3.4 Non-Public A.3 ADAMS ACCESSION NUMBER: ML24036A083(Cover letter w/ enclosure(s))
ADAMS ACCESSION NUMBER: ML24036A085(Cover letter)
Entire Report:
SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter Only:
SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RIII/DRSS RIII/DRSS NAME EBonano:gmp MZiolkowski DATE 02/05/2024 02/05/2024