ML21309A515

From kanterella
Revision as of 12:17, 19 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

NRR E-mail Capture - Palisades Nuclear Plant - Preparation for Issuance of Final Environmental Assessment and Finding of No Significant Impact Holtec Exemption Request to Use Dtf
ML21309A515
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/05/2021
From: Scott Wall
NRC/NRR/DORL/LPL3
To: Wentworth T
State of MI, Dept of Environment, Great Lakes, & Energy
Wall S
References
L-2020-LLE-0240
Download: ML21309A515 (2)


Text

From: Wall, Scott Sent: Friday, November 5, 2021 10:47 AM To: Wentworth, Theodore R. (EGLE)

Subject:

Palisades Nuclear Plant - Preparation for Issuance of final Environmental Assessment and Finding of No Significant Impact re: Holtec Exemption Request to Use DTF (EPID L-2020-LLE-0240)

Dear Mr. Wentworth,

The NRC staff is preparing the final Environmental Assessment (EA) and final Finding of No Significant Impact (FONSI) associated with the subject exemption request from Holtec Decommissioning International, LLC (HDI) related to the Palisades Nuclear Plant (Palisades). A summary of the proposed action is provided below. Additional information can be found in the applicants submittal, which is also referenced below by ADAMS accession number. Please let me know if you have any comments or questions on this proposed action. The date of this e-mail communication will be documented in the applicable section of the Federal Register (FR) notice. Im currently projecting the 3rd week of November for the associated EA/FONSI notice to be published in the FR.

Palisades - Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) (EPID L-2020-LLE-0240)

Application Date:

December 23, 2020 (ADAMS Accession No. ML20358A239).

Summary:

The NRC is considering issuance of an exemption in response to the December 23, 2020, request from HDI related to Palisades. The exemption would permit HDI to use funds from the Palisades nuclear decommissioning trust for spent fuel management and site restoration activities. The exemption would also allow such withdrawals without prior notification to the NRC.

The NRC staff plans to issue the final EA and final FONSI associated with the proposed exemption in November 2021.

Thanks, Scott P. Wall, LSS BB, BSP Senior Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301.415.2855 Scott.Wall@nrc.gov

Hearing Identifier: NRR_DRMA Email Number: 1414

Mail Envelope Properties (SA0PR09MB6058898360803067BB426C6D928E9)

Subject:

Palisades Nuclear Plant - Preparation for Issuance of final Environmental Assessment and Finding of No Significant Impact re: Holtec Exemption Request to Use DTF (EPID L-2020-LLE-0240)

Sent Date: 11/5/2021 10:46:31 AM Received Date: 11/5/2021 10:46:32 AM From: Wall, Scott

Created By: Scott.Wall@nrc.gov

Recipients:

"Wentworth, Theodore R. (EGLE)" <WentworthT@michigan.gov>

Tracking Status: None

Post Office: SA0PR09MB6058.namprd09.prod.outlook.com

Files Size Date & Time MESSAGE 1743 11/5/2021 10:46:32 AM

Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: