ML22055A521

From kanterella
Revision as of 15:54, 18 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Commission Memorandum and Order (CLI-22-03)
ML22055A521
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 02/24/2022
From: Annette Vietti-Cook
NRC/SECY
To:
Duke Energy Carolinas, NRC/OGC
SECY RAS
References
50-269-SLR, 50-270-SLR, 50-287-SLR, ASLBP 22-973-01-SLR-BD01, CLI-22-03, RAS 56347
Download: ML22055A521 (7)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

COMMISSIONERS:

Christopher T. Hanson, Chairman Jeff Baran David A. Wright

In the Matter of

DUKE ENERGY CAROLINAS, LLC Docket Nos. - -SLR (Oconee Nuclear Station, Units,, and ) --SLR

--SLR

EXELON GENERATION COMPANY, LLC Docket Nos. - -SLR (Peach Bottom Atomic Power Station, Units --SLR and )

FLORIDA POWER & LIGHT CO. Docket Nos. - -SLR (Turkey Point Nuclear Generating Units and ) --SLR

NEXTERA ENERGY POINT BEACH, LLC Docket Nos. - -SLR (Point Beach Nuclear Plant, Units and ) - -SLR

VIRGINIA ELECTRIC AND POWER COMPANY Docket Nos. - -SLR (North Anna Power Station, Units and ) - -SLR

CLI-22-03

MEMORANDUM AND ORDER We issued CLI-22-2 today, 1 which set forth the rationale for our conclusion that

10 C.F.R. § 51.53(c)(3) only applies to an initial license renewal applicants preparation of an

environmental report and that the Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GEIS)2 did not address subsequent license renewal. In this order,

we provide direction for open subsequent license renewal proceedings.

In recognition of the need to correct this National Environmental Policy Act (NEPA)

deficiency, we will not issue any further licenses for subsequent renewal terms until the NRC

staff (Staff) has completed an adequate NEPA review for each application. Licensing reviews

should continue to move forward, and in adjudicatory matters, any contentions that do not

challenge the contents of the GEIS or site-specific environmental impact statement should proceed.3 With respect to Turkey Point and Peach Bottom, where the Staff has already issued

subsequently renewed licenses, we issued orders today to address the status of the licenses.

Separately, we are directing the Staff to review and update the 2013 GEIS so that it covers operation during the subsequent license renewal period. 4 We believe the most efficient

1 Florida Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), CLI-22-2, 95 NRC

__ (Feb. 24, 2022) (slip op.).

2 Generic Environmental Impact Statement for License Renewal of Nuclear Plants (Final Report), NUREG-1437, rev. 1, vols. 1-3 (June 2013) (ADAMS accession nos. ML13106A241, ML13106A242, ML13106A244) (2013 GEIS).

3 We will issue a separate order ruling on two of the three contentions on appeal in the Point Beach proceeding. We will address Contention 2, which asserts a violation of a safety regulation. We will also address Contention 1, which is a NEPA-based contention but raises a legal issue separate from the adequacy of the contents of the GEIS or site-specific environmental impact statement.

4 Staff RequirementsSECY-21-0066Rulemaking Plan for Renewing Nuclear Power Plant Operating Licenses Environmental Review (RIN 3150-AK32; NRC-2018-0296) (Feb. 24, 2022) (ML22053A308).

way to proceed is to direct the Staff to review and update the 2013 GEIS, then take appropriate

action with respect to the pending subsequent license renewal applications to ensure that the

environmental impacts for the period of subsequent license renewal are considered.

Nevertheless, we understand that an applicant may not wish to wait for the completion of the

generic analysis and associated rulemaking. In that case, the applicant may submit a revised

environmental report providing information on environmental impacts during the subsequent

license renewal period. In such a case, petitioners or intervenors will be given an opportunity to

submit new or amended contentions based on new information in the revised site-specific

environmental impact statement.

As a general matter, in CLI-22-2 the Commission found that the 2013 GEIS did not

consider the impacts from operations during the subsequent license renewal period and

applicants for subsequent license renewal must evaluate Category 1 impacts in their

environmental reports. Accordingly, these impacts must be addressed on a site-specific basis

in the Staffs site-specific environmental impact statements. Because the applicants in the

above-captioned proceedings have all submitted environmental reports, and the Staff can

request additional information if needed during the environmental review process, we do not find

it necessary for these applicants to submit revised environmental reports.

We dismiss the environmental contentions and motions pending in the above-captioned

proceedings and take sua sponte review under 10 C.F.R. § 2.341(a)(2) of the Boards decision, LBP-22-1,5 in Oconee and dismiss all three proposed environmental contentions. We will

provide an opportunity to file contentions after the NRC (1) updates the GEIS to address

environmental impacts during the subsequent license renewal term and (2) completes the site-

5 Duke Energy Carolinas, LLC (Oconee Nuclear Station, Units 1, 2, and 3), LBP-22-1, 95 NRC

__ (Feb. 11, 2022) (slip op.).

specific environmental impact statements. 6 All of the pending matters include a challenge to the

sufficiency of the Staffs environmental review. Through the orders we issue today, we

acknowledge that the environmental review is incomplete in these cases and are separately

directing the Staff to cure the NEPA deficiencies. The public, including the intervenors and

petitioners in the above-captioned proceedings, and applicants will be afforded an opportunity to

comment on the upcoming revision to the GEIS and the associated rulemaking through the

normal agency processes. 7 The public will also have an opportunity to comment during the

development of the site-specific environmental impact statements. After each site-specific

review is complete, a new notice of opportunity for hearinglimited to contentions based on

new information in the site-specific environmental impact statementwill be issued. This

approach will not require intervenors to meet heightened pleading standards in 10 C.F.R.

§ 2.309(c) for newly filed or refiled contentions.8

Accordingly, we dismiss without prejudice the motions, petitions, and appeals pending

before us in the Peach Bottom, Turkey Point, and North Anna proceedings. We take sua

sponte review of the Boards decision, LBP-22-1, in Oconee and dismiss without prejudice the

three environmental proposed contentions. We terminate the North Anna and Oconee

proceedings and leave open the Peach Bottom and Turkey Point proceedings so that we may

determine the status of the licenses. We dismiss Contention 3 in Point Beach without prejudice

and will issue a separate order ruling on the appeal of Contentions 1 and 2 in that proceeding.

6 While not all of the pending contentions directly challenge the scope of the 2013 GEIS, because the NRC will be updating the GEIS and site-specific environmental analyses, it would be inefficient to continue litigating any of the pending environmental contentions based on environmental information that may change.

7 See generally 10 C.F.R. § 51.73 (requiring a comment period for draft EISs and supplemental EISs).

8 Petitioners will be subject to the general requirements set out in 10 C.F.R. § 2.309(a) for intervention. We expect that petitioners would update references, as appropriate, in any refiled contentions.

IT IS SO ORDERED.

For the Commission

Annette L. Vietti-Cook Secretary of the Commission

Dated at Rockville, Maryland, this 24th day of February 2022.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

In the Matter of )

)

DUKE ENERGY CAROLINAS, LLC, ) Docket Nos. 50-269, 50-270 & 50-287-SLR DUKE ENERY )

)

(Oconee Nuclear Station )

Units 1, 2 and 3) )

CERTIFICATE OF SERVICE

I hereby certify that copies of the Commission Memorandum and Order (CLI-22-03) have been served upon the following persons by Electronic Information Exchange.

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Office of Commission Appellate Adjudication Office of the Secretary of the Commission Mail Stop: O-16B33 Mail Stop: O-16B33 Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: ocaamail@nrc.gov E-mail: hearingdocket@nrc.gov

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Panel Office of the General Counsel Mail Stop: T-3F23 Mail Stop - O-14A44 Washington, DC 20555-0001 Washington, DC 20555-0001 Susan Vrahoretis, Esq.

G. Paul Bollwerk, III, Chairman David E. Roth, Esq.

Administrative Judge Megan A. Wright, Esq.

Mary F. Woods, Esq.

Nicholas G. Trikouros Joseph M. Azeizat, Esq.

Administrative Judge Brian Newell, Senior Paralegal Georgiann E. Hampton, Paralegal Dr. Gary S. Arnold Amanda Black, Paralegal Administrative Judge E-mail: susan.vrahoretis@nrc.gov david.roth@nrc.gov Brooke Taylor, Law Clerk megan.wright@nrc.gov mary.woods@nrc.gov Allison Wood, Law Clerk joseph.azeizat@nrc.gov brian.newell@nrc.gov E-mail: paul.bollwerk@nrc.gov georgiann.hampton@nrc.gov nicholas.trikouros@nrc.gov amanda.black@nrc.gov gary.arnold@nrc.gov brooke.taylor@nrc.gov allison.wood@nrc.gov

Oconee Power Station (Units 1, 2 and 3)

Docket Nos. 50-269, 50-270 and 50-287-SLR Commission Memorandum and Order (CLI-22-03)

Duke Energy

Tracey LeRoy, Esq.

550 South Tryon Street, 45A Charlotte, NC 28202 tracey.leroy@duke-energy.com

Counsel for Duke Energy

Morgan, Lewis & Bockius LLP Paul Bessette, Esq.

Ryan Lighty, Esq.

1111 Pennsylvania Avenue, NW Washington, DC 20004 E-mail: paul.bessette@morganlewis.com ryan.lighty@morganlewis.com

Beyond Nuclear

Paul Vernon Gunter, Esq.

7304 Carroll Avenue #182 Takoma Park, MD 20912 paul@beyondnuclear.org

Counsel for Beyond Nuclear

Diane Curran, Esq.

Harmon, Curran, Spielberg and Eisenberg 1725 DeSales Street NW, Suite 500 Washington, DC 20036 dcurran@harmoncurran.com

Office of the Secretary of the Commission Dated at Rockville, Maryland, This 24th day of February 2022.

2