|
---|
Category:Letter
MONTHYEARML24156A1052024-06-0606 June 2024 Transmittal Letter - Certificate of Compliance No. 9372, Rev. 5, for the Model No. TN-B1 Package ML24082A1872024-03-22022 March 2024 Framatome TN-B1 Shipping Container, Request for Additional Information Response ML23348A1782023-12-14014 December 2023 Framatome Inc. Request for Five Year Renewal of Certificate of Compliance No. 9372 for the Model No. TN-B1 Packaging ML23282A0052023-10-0909 October 2023 Framatome, Inc., Submittal of 71-9372, TN-81 License Drawing Correction ML23282A0082023-10-0909 October 2023 Framatome, Inc. - 10 CFR 71.95 - 60 Day Report - TN-B1 Certificate Not Followed ML23031A2142023-01-31031 January 2023 Framatome, Inc., TN-B1 Shipping Container, Amendment Request for Increased Enrichment Values ML22305A5412022-10-31031 October 2022 Framatome, Inc. - 10 CFR 71.95 - 60 Day Report - TN-B1 Certificate Not Followed ML22175A1232022-06-24024 June 2022 Framatome, Inc., Intent to Request License Amendment ML22034A9672022-02-11011 February 2022 Letter Authorization TN-B1-2022 ML22028A1852022-01-28028 January 2022 Framatome, Inc., Submittal of Model No. TN-B1 Transport Package, License Amendment Request ML21302A1382021-11-29029 November 2021 Framatome, Inc., Intent to Request an Amendment ML21319A3892021-11-15015 November 2021 Framatome Intends to Request a Letter Authorization Utilizing Docket No. 71 -9372, Framatome TN-B1 Shipping Container ML20315A2692020-11-10010 November 2020 Cover Letter: Revised Authorization for Shipment of Framatome BWR Atrium 10XM Fresh Fuel Assemblies Equipped with Inert Test Rods ML20315A2702020-11-10010 November 2020 Enclosusafety Evaluation Report - Authorization for Limited Shipments ML20309A4242020-11-0404 November 2020 Submittal of Authorization for Shipment of Framatome Boiling Water Reactor Atrium 10XM Fresh Fuel Assemblies Equipped with Inert Test Rods ML20309A4252020-10-0909 October 2020 Authorization for Shipment of Framatome Boiling Water Reactor Atrium 10XM Fresh Fuel Assemblies Equipped with Inert Test Rods ML20283A3592020-10-0909 October 2020 Encl 1: Safety Evaluation Report - Authorization for Limited Shiments ML20283A3582020-10-0909 October 2020 Letter Authorization for Shipment of Atrium 10XM Assemblies Equipped with Eatf Test Rods ML20167A1872020-06-15015 June 2020 Letter Authorization Application Utilizing Certificate USA 9372/B(U)F-96 for Model No. TN-B1 Transport Package ML20115E5912020-04-24024 April 2020 Framatome, Inc., Intends to Request a Letter Authorization Utilizing Docket No. 71-9372, TN-B1 Shipping Container ML19070A0202019-03-0606 March 2019 Letter to T. Tate Certificate of Compliance No. 9372, Revision No. 2, for the Model No. TN-B1 Package ML18283B3172018-10-0909 October 2018 Letter to T.J. Tate Certificate of Compliance No. 9372, Revision No. 2, for the Model No. TN-B1 Package ML18173A0332018-06-21021 June 2018 Letter to T. Tate Certificate of Compliance No. 9372, Revision No. 1, for the Model No. TN-B1 Package 2024-06-06
[Table view] |
Text
framat o me
October 9, 2023 T JT:23:023
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards Washington, D.C. 20555-0001
Subject:
71 -9372, TN-81 License Drawing Correction
References : (1) NRC Certificate of Compliance (CoC) USA/9372/B(U)F-96, Docket Number 71-9372.
Dear Sir or Madam,
Framatome Inc. (Framatome) submits a corrected licensing drawing for Certificate of Compliance (CoC) USA/9372/B(U)F-96, Docket Number 71-9372. Framatome is the certificate holder for this packaging.
Framatome self-identified an error between the TN - B 1 licensing drawing FS 1-0042705 Rev. 1 approved in the Certificate of Compliance (CoC) USA/9372/B(U)F -96 Rev. 3 and the previous licensing drawing, 105E3745 Rev. 8. The error increased the number of plug welds required on the inner container which is more than the number of plug welds made on all as built TN-B1 packaging's. This error puts the entire fleet of TN-B1 packaging 's into a state of non-compliance for which a 71.95 report is also being submitted separately.
Framatome requests the NRC staff's review of the corrected drawing and the issuance of a revised CoC no later than October 31 st, 2023 to ensure continuity of our scheduled shipments. The revised drawing and list of changes is attached.
Please feel free to contact me at (509) 375 -8550 or Bryan Flanagan of my staff at (509) 375 -8537 if you have questions or need additional information.
Fra rn a to m e In c.
2101 Ho m Ra pids Roa d Ric h la nd, WA 993 54 Tel: (509 ) 375 - 8 100
www.fra m at om e.co m framat o me T JT:23:023 Page 2 of 2
Sincerely,
Timothy J. Tate, Manager Environmental, Health, Safety and Licensing
TJT/sm
Attachments:
- 1. Drawing FS1-0042705, Rev. 2 (4 sheets), TN-B1 Inner Container Main Body Assembly Licensing Drawing
- 2. List of Changes for FS1-0042705, Rev. 2
cc:
Pierre Saverot, Project Manager NRC Bernard White, Senior Project Manager NRC
Fra m a to m e Inc.
210 1 Ho rn Ra pids Road Ric h la n d, WA 99354 Tel: (509 ) 375 - 8 10 0
www.fra m a tom e.com