|
---|
Category:Letter
MONTHYEARML24156A1052024-06-0606 June 2024 Transmittal Letter - Certificate of Compliance No. 9372, Rev. 5, for the Model No. TN-B1 Package ML24082A1872024-03-22022 March 2024 Framatome TN-B1 Shipping Container, Request for Additional Information Response ML23348A1782023-12-14014 December 2023 Framatome Inc. Request for Five Year Renewal of Certificate of Compliance No. 9372 for the Model No. TN-B1 Packaging ML23282A0052023-10-0909 October 2023 Framatome, Inc., Submittal of 71-9372, TN-81 License Drawing Correction ML23282A0082023-10-0909 October 2023 Framatome, Inc. - 10 CFR 71.95 - 60 Day Report - TN-B1 Certificate Not Followed ML23031A2142023-01-31031 January 2023 Framatome, Inc., TN-B1 Shipping Container, Amendment Request for Increased Enrichment Values ML22305A5412022-10-31031 October 2022 Framatome, Inc. - 10 CFR 71.95 - 60 Day Report - TN-B1 Certificate Not Followed ML22175A1232022-06-24024 June 2022 Framatome, Inc., Intent to Request License Amendment ML22034A9672022-02-11011 February 2022 Letter Authorization TN-B1-2022 ML22028A1852022-01-28028 January 2022 Framatome, Inc., Submittal of Model No. TN-B1 Transport Package, License Amendment Request ML21302A1382021-11-29029 November 2021 Framatome, Inc., Intent to Request an Amendment ML21319A3892021-11-15015 November 2021 Framatome Intends to Request a Letter Authorization Utilizing Docket No. 71 -9372, Framatome TN-B1 Shipping Container ML20315A2692020-11-10010 November 2020 Cover Letter: Revised Authorization for Shipment of Framatome BWR Atrium 10XM Fresh Fuel Assemblies Equipped with Inert Test Rods ML20315A2702020-11-10010 November 2020 Enclosusafety Evaluation Report - Authorization for Limited Shipments ML20309A4242020-11-0404 November 2020 Submittal of Authorization for Shipment of Framatome Boiling Water Reactor Atrium 10XM Fresh Fuel Assemblies Equipped with Inert Test Rods ML20309A4252020-10-0909 October 2020 Authorization for Shipment of Framatome Boiling Water Reactor Atrium 10XM Fresh Fuel Assemblies Equipped with Inert Test Rods ML20283A3592020-10-0909 October 2020 Encl 1: Safety Evaluation Report - Authorization for Limited Shiments ML20283A3582020-10-0909 October 2020 Letter Authorization for Shipment of Atrium 10XM Assemblies Equipped with Eatf Test Rods ML20167A1872020-06-15015 June 2020 Letter Authorization Application Utilizing Certificate USA 9372/B(U)F-96 for Model No. TN-B1 Transport Package ML20115E5912020-04-24024 April 2020 Framatome, Inc., Intends to Request a Letter Authorization Utilizing Docket No. 71-9372, TN-B1 Shipping Container ML19070A0202019-03-0606 March 2019 Letter to T. Tate Certificate of Compliance No. 9372, Revision No. 2, for the Model No. TN-B1 Package ML18283B3172018-10-0909 October 2018 Letter to T.J. Tate Certificate of Compliance No. 9372, Revision No. 2, for the Model No. TN-B1 Package ML18173A0332018-06-21021 June 2018 Letter to T. Tate Certificate of Compliance No. 9372, Revision No. 1, for the Model No. TN-B1 Package 2024-06-06
[Table view] |
Text
framat o me
November 15, 2021 T JT:21 :024
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards 11555 Rockville Pike One White Flint North Rockville, MD 20852
Subject:
Framatome intends to Request a Letter Authorization utilizing Docket No. 71 -9372, Framatome TN-81 Shipping Container.
References:
(1) NRG Certificate of Compliance (CoC) USA/9372/B(U)F-96, Revision 2, Docket Number 71-9372.
Framatome Inc. (Framatome) wishes to inform the NRG that we intend to formally request a letter authorization utilizing Certificate of Compliance 9372 for the TN-B1 packaging for up to two shipments between mid-March 2022 and ending no later than July 2022. This request is to support data gathering during road tests and provide for the safe transport of a small number of Framatome channeled BWR fresh fuel assemblies with a few changes to the TN-B1 packaging requirements. The changes are directed to support improved vibration performance and a thicker fuel channel side thickness.
This request for a Letter Authorization will be submitted mid-December 2021.
Please feel free to contact me at (509) 375 - 8550 or Bryan Flanagan of my staff at (509) 375-8537 if you have questions or need additional information.
Sincerely,
Timothy J. Tate, Manager Environmental, Health, Safety and Licensing
Frama tome Inc.
2 10 1 Horn Rapids Roa d Ric h land, WA 99354 Tel: (509) 375-8 100
www.fra matome.com
22709WA _ P-1 (01111/2018)
US NRC T JT:21 :024 November 15, 2021 Page 2
cc:
Pierre Saverot US Nuclear Regulatory Commission