ML24005A022

From kanterella
Revision as of 20:11, 5 October 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Steam Generator Tube Inspection Reports
ML24005A022
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/05/2024
From: Laura Smith
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML24005A021 List:
References
TS 5.6.9
Download: ML24005A022 (1)


Text

Larry D. Smith Exelon Generation (~ Manager -Regulatory Assurance

Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 410 495 5219 Office

larry.smith2@constellat1on.com

TS 5.6.9 January 5, 2024

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Calvert Cliffs Nuclear Power Plant, Units No. 1 & No. 2 Renewed Facility Operating License Nos. DPR-53 & DPR-69 NRC Docket Nos. 50-317 & 50-318

Subject:

Revised Steam Generator Tube Inspection Reports

Reference:

1. Calvert Cliffs Nuclear Power Plant Units 1 and 2 Technical Specification 5.6.9

The NRC approved a License Amendment Request to implement TSTF-577 for Calvert Cliffs Nuclear Power Plant. In accordance with that amendment request, Calvert Cliffs was required to submit revised Steam Generator Tube Inspection Reports within 60 days of implementation for Units 1 and 2. The amendment was implemented on November 15, 2023. In accordance with the revised Reference 1, Attachments ( 1) and (2) provide the 180-day report with the revised TS 5.6.9 reporting requirements for Unit 1 and Unit 2 respectively.

There are no regulatory commitments contained in this correspondence.

Should you have questions regarding this matter, please contact Mr. Larry D. Smith at (410) 495-5219.

Respectfully, A~~

Larry D. Smith Regulatory Assurance Manager

LDS/MJF/aj

Attachment:

(1) Calvert Cliffs CC1 R25 Revised Steam Generator Tube Inspection Report (2) Calvert Cliffs CC2R23 Revised Steam Generator Tube Inspection Report

cc:

NRC Project Manager, Calvert Cliffs NRC Resident Inspector, Calvert Cliffs NRC Regional Administrator, Region I S. Seaman, MD-DNR