ML24121A100
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Letter Sequence Response to RAI | |
---|---|
EPID:L-2023-LLR-0068, Inservice Testing Program for Pumps and Valves Fifth Interval Update and Associated Relief and Alternative Requests (Open) | |
Initiation Administration | |
MONTHYEARML23361A1042023-12-21021 December 2023
[Table View]Inservice Testing Program for Pumps and Valves Fifth Interval Update and Associated Relief and Alternative Requests Project stage: Request ML24026A2802024-01-25025 January 2024 Acceptance Review for Virgil C. Summer Relief Requests RR-5-V1, RR-5-V2, and RR-5-V3 (EPIDs L-2023-LLR-0067, L-2023-LLR-0068, and L-2023-LLR-0069) (Email) Project stage: Acceptance Review ML24075A1872024-03-15015 March 2024 NRR E-mail Capture - Draft RAIs for Alternative Request RR-5-V2 (L-2023-LLR-0068) Project stage: Draft RAI ML24255A3152024-10-22022 October 2024 Relief Request RR-5-V2 Regarding Pressure Isolation Valves Project stage: Approval 2024-01-25 |
ML24121A100 | |
Person / Time | |
---|---|
Site: | Summer |
Issue date: | 04/29/2024 |
From: | James Holloway Dominion Energy South Carolina |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
References | |
24-133 | |
Download: ML24121A100 (1) | |
Similar Documents at Summer | |
---|---|
Category:Letter
MONTHYEARML24256A2322024-10-22022 October 2024
[Table view]Relief Request RR-5-P1 Charging/Safety Injection Pumps ML24255A3152024-10-22022 October 2024 Relief Request RR-5-V2 Regarding Pressure Isolation Valves ML24250A0782024-10-22022 October 2024 Relief Request RR-5-V1 Regarding Service Water Return Header Check Valves 05000395/LER-2024-002, Loss of Control Room Emergency Filtration System2024-10-15015 October 2024 Loss of Control Room Emergency Filtration System ML24290A1052024-10-0707 October 2024 Core Operating Limits Report VCSNS Unit 1 Cycle 29, Revision 0 ML24274A1942024-09-26026 September 2024 (Vcsns), Unit 1 Subsequent License Renewal Application (SLRA) First 10 CFR 54.21(b) Annual Amendment IR 05000395/20244042024-09-26026 September 2024 Cyber Security Inspection Report 05000395-2024404 - Public ML24267A0552024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24221A2112024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0592024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0642024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) ML24267A0542024-09-23023 September 2024 Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395) IR 05000395/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000395/2024402 IR 05000395/20240052024-08-22022 August 2024 Updated Inspection Plan for Virgil C. Summer Nuclear Station - Report 05000395/2024005 ML24190A4012024-08-19019 August 2024 Request for Withholding Information from Public Disclosure Regarding the Subsequent License Renewal Application - Dominion Energy Letter Dated May 30, 2024 IR 05000395/20240022024-08-12012 August 2024 Integrated Inspection Report 05000395/2024002 ML24180A0062024-08-0505 August 2024 Issuance of Amendment No. 227 to Modify Technical Specification 3.8.3.1 to Increase Completion Time for 120-Volt A.C. Vital Busses ML24218A3002024-08-0101 August 2024 Environmental Review Response to NRC Requests for Additional Information and Response to NRC Requests for Confirmation of Information Set 1 ML24158A3882024-07-31031 July 2024 Issuance of Amendment No. 226 to Change Emergency Plan Staff Augmentation Times and Relocate Emergency Operations Facility ML24162A3292024-07-0505 July 2024 Letter to E Carr - V.C. Summer Unit 1 - Summary of the May 2024 Audit Regarding the Environmental Review of the Subsequent License Renewal Application IR 05000395/20240112024-06-26026 June 2024 – Comprehensive Engineering Team Inspection Report 05000395/2024011 ML24178A1192024-06-25025 June 2024 Update to License Amendment Request- Inverter Allowed Outage Time (AOT) Extension ML24177A1382024-06-25025 June 2024 Aging Management Audit Report- VC Summer, Unit 1 - Subsequent License Renewal Application ML24185A1902024-06-25025 June 2024 Submittal of Updated Final Safety Analysis Report, Revision 24 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24171A0152024-06-17017 June 2024 Update to Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Set 2 Safety Review ML24157A3352024-06-0606 June 2024 – Notification of an NRC Cybersecurity Baseline Inspection (NRC Inspection Report 05000395-2024404 and Request for Information ML24155A2042024-05-31031 May 2024 Proposed Alternative Request RR-24-123, Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML24155A1462024-05-30030 May 2024 Update to Subsequent License Renewal Application (SLRA) -Response to NRC Request for Additional Information Set 1 Response to NRC Request for Confirmation of Information Set 1 and Supplement 3 ML24143A1792024-05-22022 May 2024 Special Report 2024-001-01 for Virgil C. Summer Nuclear Station (Vcsns), Unit 1, Waste Gas System Inoperability ML24141A2822024-05-20020 May 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes IR 05000395/20240012024-05-10010 May 2024 Integrated Inspection Report 05000395/2024001 ML24129A2002024-05-0606 May 2024 Update to Subsequent License Renewal Application, Supplement 2 IR 05000395/20240402024-05-0101 May 2024 95001 Supplemental Inspection Report 05000395/2024040 and Follow-Up Assessment Letter ML24121A1002024-04-29029 April 2024 Response to Request for Additional Information Regarding Alternative Request RR-5-V2 ML24120A2072024-04-29029 April 2024 Submittal of Annual Radiological Environmental Operating Report ML24116A2052024-04-23023 April 2024 Annual Radioactive Effluent Release Report ML24109A1792024-04-19019 April 2024 Aging Management Audit Plan Regarding the Subsequent License Renewal Application Review ML24108A0392024-04-18018 April 2024 Letter to E Carr-V.C. Summer Unit 1- Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application 05000395/LER-2024-001, (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator2024-04-17017 April 2024 (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator ML24108A0672024-04-17017 April 2024 Submittal of Summary for Condition of the Service Water Intake Structure Provided in Accordance with License Condition 2.C.5.d ML24100A7312024-04-0909 April 2024 Personnel Exposure and Monitoring Annual Report ML24095A2072024-04-0101 April 2024 Update to Subsequent License Renewal Application (SLRA) Supplement 1 ML24087A2182024-03-26026 March 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes - Response to Request. ML24087A2262024-03-26026 March 2024 License Amendment Request - Inverter Allowed Outage Time Extension Response to Request for Additional Information ML24088A2062024-03-26026 March 2024 Annual Operating Report 2024-09-26 Category:Response to Request for Additional Information (RAI) MONTHYEARML24218A3002024-08-0101 August 2024
[Table view]Environmental Review Response to NRC Requests for Additional Information and Response to NRC Requests for Confirmation of Information Set 1 ML24171A0152024-06-17017 June 2024 Update to Subsequent License Renewal Application (SLRA) Response to NRC Request for Additional Information Set 2 Safety Review ML24155A1462024-05-30030 May 2024 Update to Subsequent License Renewal Application (SLRA) -Response to NRC Request for Additional Information Set 1 Response to NRC Request for Confirmation of Information Set 1 and Supplement 3 ML24141A2822024-05-20020 May 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes ML24121A1002024-04-29029 April 2024 Response to Request for Additional Information Regarding Alternative Request RR-5-V2 ML24087A2262024-03-26026 March 2024 License Amendment Request - Inverter Allowed Outage Time Extension Response to Request for Additional Information ML24087A2182024-03-26026 March 2024 (Vcsns), Unit 1 - License Amendment Request - Emergency Response Organization (ERO) Augmentation Time Change, Emergency Operations Facility Relocation and Other Emergency Plan Changes - Response to Request. ML22353A5462022-12-19019 December 2022 (Vcsns), Unit 1 - Alternative Request to Defer ASME Code Section XI Inservice Inspection Examinations for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles Response to Request ML22300A2202022-10-27027 October 2022 (VCSNS) Unit 1, Alternative Request Rr-4-26 Application for Alternative Request - Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval (Volumetric Examination) RAI ML22020A2262022-01-20020 January 2022 Response to Request for Additional Information to License Amendment Request LAR-20-203 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency ML21180A4052021-06-29029 June 2021 (Vcsns), Unit 1 - Supplement to Request for Additional Information Regarding RF-25 Stem Generator Tube Inspection Report ML21168A2612021-06-17017 June 2021 (Vcsns), Unit 1 - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors - Final Supplemental Response ML21154A1802021-06-0303 June 2021 Response to NRC Request for Additional Information Regarding RGF-25 Steam Generator Tube Inspection Report ML21007A3232021-01-0707 January 2021 License Amendment Request LAR-20-142 Request for Technical Specification Change Technical Specification 3.6.4, Containment Isolation Valves Response to Request for Additional Information (RAI) ML21007A3402021-01-0707 January 2021 (Vcsns), Unit 1 - License Amendment Request LAR-20-176 Update of Analytical Method to the Core Operating Limits Report with the Full Spectrum Loss of Coolant Accident Approach - Response to Request for Additional Info ML20349A3262020-12-14014 December 2020 (Vcsns), Unit 1 - Response to NRC Request for Additional Information Regarding RF-24 Steam Generator Tube Inspection Report ML19282E2612019-10-0909 October 2019 Response to Follow-Up Question to PRA RAI 03, License Amendment Request - LAR-16-01490 NFPA 805 Program Revisions ML19224B1152019-08-12012 August 2019 Response to NRC Follow-Up Question PRA RAI 03, License Amendment Request - LAR-16-01490 NFPA 805 Program Revisions ML19119A3652019-04-29029 April 2019 (Vcsns), Unit 1 - License Amendment Request - LAR-16-01490, NFPA 805 Program Revisions: Response to Request for Additional Information ML19071A3572019-03-11011 March 2019 Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2., D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.b.2 and 4.8.2.1.c.3 - Request for Additional Information RC-18-0116, (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information2018-09-11011 September 2018 (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information RC-18-0100, (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information2018-08-22022 August 2018 (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information RC-18-0090, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request...2018-07-12012 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request... RC-18-0084, Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Requ2018-07-0303 July 2018 Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Reques RC-18-0046, License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information2018-04-19019 April 2018 License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information RC-18-0036, (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information2018-04-0202 April 2018 (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information RC-17-0134, Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 12017-09-27027 September 2017 Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1 RC-17-0093, License Amendment Request - LAR-15-01424 Implementation of WCAP-15376-P-A, Revision 1 - Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times, Response To.2017-07-0606 July 2017 License Amendment Request - LAR-15-01424 Implementation of WCAP-15376-P-A, Revision 1 - Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times, Response To. RC-17-0088, Implementation of WCAP-15376-P-A, Revision 1 - Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times - Response to Request for Additional Information2017-06-22022 June 2017 Implementation of WCAP-15376-P-A, Revision 1 - Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times - Response to Request for Additional Information RC-17-0032, Spent Fuel Evaluation Supplemental Report, Response to NRC for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident2017-03-30030 March 2017 Spent Fuel Evaluation Supplemental Report, Response to NRC for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident ML17087A1512017-03-28028 March 2017 Response to Request for Additional Information on VC Summer Sfpli RC-17-0019, Response to Request for Additional Information Regarding License Amendment Request LAR-15-01424, Implementation of WCAP-15376-P-A, Revision 12017-02-0606 February 2017 Response to Request for Additional Information Regarding License Amendment Request LAR-15-01424, Implementation of WCAP-15376-P-A, Revision 1 RC-16-0147, VC Summer Nuclear Station, Unit 1, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Pursuant to Title 10 9f the Code of Federal Regulations 05.54(f)2016-11-0303 November 2016 VC Summer Nuclear Station, Unit 1, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Pursuant to Title 10 9f the Code of Federal Regulations 05.54(f) ML16235A2422016-08-18018 August 2016 Response to Request for Information for Triennial Fire Protection Baseline Inspection RC-16-0091, Response to Request for Additional Information on Relief Request RR-III-12 Proposed Alternative Inspection Requirements for Piping Welds2016-06-0202 June 2016 Response to Request for Additional Information on Relief Request RR-III-12 Proposed Alternative Inspection Requirements for Piping Welds RC-16-0077, Relief Request RR-III-12, Proposed Alternative Inspection Requirements for Piping Welds - Response to Request for Additional Information2016-05-0606 May 2016 Relief Request RR-III-12, Proposed Alternative Inspection Requirements for Piping Welds - Response to Request for Additional Information RC-16-0046, Response to Request for Additional Information on Relief Request RR-III-2, Proposed Alternative Inspection Requirements for Piping Welds2016-03-18018 March 2016 Response to Request for Additional Information on Relief Request RR-III-2, Proposed Alternative Inspection Requirements for Piping Welds RC-16-0036, License Amendment Request - LAR-15-01424 - Implementation of WCAP-15376-P-A, Revision 1, Response to Request for Supplemental Information2016-03-0707 March 2016 License Amendment Request - LAR-15-01424 - Implementation of WCAP-15376-P-A, Revision 1, Response to Request for Supplemental Information RC-16-0031, License Amendment Request - LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis Supplement Response2016-03-0404 March 2016 License Amendment Request - LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis Supplement Response RC-16-0039, Exigent License Amendment Request - LAR (16-00848), Technical Specification Change Request for Emergency Feedwater System Limiting Condition for Operation 3.7.1.2 Action B - Response to Request for Additional..2016-03-0303 March 2016 Exigent License Amendment Request - LAR (16-00848), Technical Specification Change Request for Emergency Feedwater System Limiting Condition for Operation 3.7.1.2 Action B - Response to Request for Additional.. RC-16-0001, V.C. Summer, Report of Full Compliance with March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) and Responses to Requests for Additional Information2016-01-22022 January 2016 V.C. Summer, Report of Full Compliance with March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) and Responses to Requests for Additional Information RC-16-0006, Response to Request for Additional Information to License Amendment Request - LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis2016-01-14014 January 2016 Response to Request for Additional Information to License Amendment Request - LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis RC-15-0186, Response to Request for Information (NRC Inspection Report No. 05000395/2015404)2015-11-11011 November 2015 Response to Request for Information (NRC Inspection Report No. 05000395/2015404) IR 05000395/20154042015-11-11011 November 2015 V.C. Summer, Unit 1 - Response to Request for Information (NRC Inspection Report No. 05000395/2015404) RC-15-0160, Response to Request for Information (NRC Inspection Report No. 05000395/2015404)2015-09-25025 September 2015 Response to Request for Information (NRC Inspection Report No. 05000395/2015404) ML15310A0762015-09-21021 September 2015 Response to Request for Information to Support the Cyber Security Inspection RC-15-0142, License Amendment Request, LAR 12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis, Response to Request for Additional Information2015-09-10010 September 2015 License Amendment Request, LAR 12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis, Response to Request for Additional Information RC-15-0116, Response to NRC Request for Information Baseline Radiation Safety Inspection2015-07-13013 July 2015 Response to NRC Request for Information Baseline Radiation Safety Inspection 2024-08-01 |
Text
cc:
Moncks 1 Riverwood Santee Mr. ( continued)
G.
Corner, Cooper J.
Lindamood Drive SC -
Nuclear 29461
Coordinator
Docket Serial
Page No. No.
3 of 50-395 24-133
3