Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22353A546 | 19 December 2022 | (Vcsns), Unit 1 - Alternative Request to Defer ASME Code Section XI Inservice Inspection Examinations for Pressurizer and Steam Generator Pressure-Retaining Welds and Full Penetration Welded Nozzles Response to Request | Incorporated by reference |
ML22300A220 | 27 October 2022 | (VCSNS) Unit 1, Alternative Request Rr-4-26 Application for Alternative Request - Extension of Steam Generator Primary Inlet Nozzle Dissimilar Metal Weld Inspection Interval (Volumetric Examination) RAI | Boric Acid VT-2 Dissimilar Metal Weld |
ML22020A226 | 20 January 2022 | Response to Request for Additional Information to License Amendment Request LAR-20-203 Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency | High winds Ultimate heat sink Internal Flooding Probabilistic Risk Assessment FLEX Surveillance Frequency Control Program Large early release frequency Flooding Focused Evaluation Earthquake |
ML21180A405 | 29 June 2021 | (Vcsns), Unit 1 - Supplement to Request for Additional Information Regarding RF-25 Stem Generator Tube Inspection Report | |
ML21168A261 | 17 June 2021 | (Vcsns), Unit 1 - NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-water Reactors - Final Supplemental Response | Coatings |
ML21154A180 | 3 June 2021 | Response to NRC Request for Additional Information Regarding RGF-25 Steam Generator Tube Inspection Report | |
ML21007A323 | 7 January 2021 | License Amendment Request LAR-20-142 Request for Technical Specification Change Technical Specification 3.6.4, Containment Isolation Valves Response to Request for Additional Information (RAI) | |
ML21007A340 | 7 January 2021 | (Vcsns), Unit 1 - License Amendment Request LAR-20-176 Update of Analytical Method to the Core Operating Limits Report with the Full Spectrum Loss of Coolant Accident Approach - Response to Request for Additional Info | |
ML20349A326 | 14 December 2020 | (Vcsns), Unit 1 - Response to NRC Request for Additional Information Regarding RF-24 Steam Generator Tube Inspection Report | |
ML19282E261 | 9 October 2019 | Response to Follow-Up Question to PRA RAI 03, License Amendment Request - LAR-16-01490 NFPA 805 Program Revisions | Internal Flooding Probabilistic Risk Assessment Fire Protection Program |
ML19224B115 | 12 August 2019 | Response to NRC Follow-Up Question PRA RAI 03, License Amendment Request - LAR-16-01490 NFPA 805 Program Revisions | Internal Flooding Fire Protection Program |
ML19119A365 | 29 April 2019 | (Vcsns), Unit 1 - License Amendment Request - LAR-16-01490, NFPA 805 Program Revisions: Response to Request for Additional Information | Probabilistic Risk Assessment Fire Protection Program |
ML19071A357 | 11 March 2019 | Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2., D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.b.2 and 4.8.2.1.c.3 - Request for Additional Information | Battery sizing |
RC-18-0116, (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information | 11 September 2018 | (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information | |
RC-18-0100, (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information | 22 August 2018 | (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information | |
RC-18-0090, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request... | 12 July 2018 | (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request... | Through-Wall Leak |
RC-18-0084, Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Requ | 3 July 2018 | Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Reques | |
RC-18-0046, License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information | 19 April 2018 | License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information | |
RC-18-0036, (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information | 2 April 2018 | (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information | Weld Overlay Internal Flooding Probabilistic Risk Assessment Large early release frequency Dissimilar Metal Weld DM weld |
RC-17-0134, Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1 | 27 September 2017 | Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1 | |
RC-17-0093, License Amendment Request - LAR-15-01424 Implementation of WCAP-15376-P-A, Revision 1 - Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times, Response To. | 6 July 2017 | License Amendment Request - LAR-15-01424 Implementation of WCAP-15376-P-A, Revision 1 - Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times, Response To. | Probabilistic Risk Assessment Large early release frequency |
RC-17-0088, Implementation of WCAP-15376-P-A, Revision 1 - Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times - Response to Request for Additional Information | 22 June 2017 | Implementation of WCAP-15376-P-A, Revision 1 - Risk-Informed Assessment of the RTS and ESFAS Surveillance Test Intervals and Reactor Trip Breaker Test and Completion Times - Response to Request for Additional Information | Internal Flooding Probabilistic Risk Assessment |
RC-17-0032, Spent Fuel Evaluation Supplemental Report, Response to NRC for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident | 30 March 2017 | Spent Fuel Evaluation Supplemental Report, Response to NRC for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi |
ML17087A151 | 28 March 2017 | Response to Request for Additional Information on VC Summer Sfpli | |
RC-17-0019, Response to Request for Additional Information Regarding License Amendment Request LAR-15-01424, Implementation of WCAP-15376-P-A, Revision 1 | 6 February 2017 | Response to Request for Additional Information Regarding License Amendment Request LAR-15-01424, Implementation of WCAP-15376-P-A, Revision 1 | High winds Mission time Internal Flooding Probabilistic Risk Assessment Operator Manual Action Large early release frequency Severe Accident Management Guideline Maintenance Rule Program Weak link |
RC-16-0147, VC Summer Nuclear Station, Unit 1, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Pursuant to Title 10 9f the Code of Federal Regulations 05.54(f) | 3 November 2016 | VC Summer Nuclear Station, Unit 1, Response to Generic Letter 2016-01, Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools Pursuant to Title 10 9f the Code of Federal Regulations 05.54(f) | |
ML16235A242 | 18 August 2016 | Response to Request for Information for Triennial Fire Protection Baseline Inspection | |
RC-16-0091, Response to Request for Additional Information on Relief Request RR-III-12 Proposed Alternative Inspection Requirements for Piping Welds | 2 June 2016 | Response to Request for Additional Information on Relief Request RR-III-12 Proposed Alternative Inspection Requirements for Piping Welds | |
RC-16-0077, Relief Request RR-III-12, Proposed Alternative Inspection Requirements for Piping Welds - Response to Request for Additional Information | 6 May 2016 | Relief Request RR-III-12, Proposed Alternative Inspection Requirements for Piping Welds - Response to Request for Additional Information | Weld Overlay |
RC-16-0046, Response to Request for Additional Information on Relief Request RR-III-2, Proposed Alternative Inspection Requirements for Piping Welds | 18 March 2016 | Response to Request for Additional Information on Relief Request RR-III-2, Proposed Alternative Inspection Requirements for Piping Welds | |
RC-16-0036, License Amendment Request - LAR-15-01424 - Implementation of WCAP-15376-P-A, Revision 1, Response to Request for Supplemental Information | 7 March 2016 | License Amendment Request - LAR-15-01424 - Implementation of WCAP-15376-P-A, Revision 1, Response to Request for Supplemental Information | Probabilistic Risk Assessment |
RC-16-0031, License Amendment Request - LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis Supplement Response | 4 March 2016 | License Amendment Request - LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis Supplement Response | |
RC-16-0039, Exigent License Amendment Request - LAR (16-00848), Technical Specification Change Request for Emergency Feedwater System Limiting Condition for Operation 3.7.1.2 Action B - Response to Request for Additional.. | 3 March 2016 | Exigent License Amendment Request - LAR (16-00848), Technical Specification Change Request for Emergency Feedwater System Limiting Condition for Operation 3.7.1.2 Action B - Response to Request for Additional.. | |
RC-16-0001, V.C. Summer, Report of Full Compliance with March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) and Responses to Requests for Additional Information | 22 January 2016 | V.C. Summer, Report of Full Compliance with March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) and Responses to Requests for Additional Information | High winds Safe Shutdown Earthquake Operating Basis Earthquake FLEX Spent Fuel Pool Instrumentation |
RC-16-0006, Response to Request for Additional Information to License Amendment Request - LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis | 14 January 2016 | Response to Request for Additional Information to License Amendment Request - LAR-12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis | Offsite Dose Calculation Manual Met Tower |
RC-15-0186, Response to Request for Information (NRC Inspection Report No. 05000395/2015404) | 11 November 2015 | Response to Request for Information (NRC Inspection Report No. 05000395/2015404) | Cyber Security |
IR 05000395/2015404 | 11 November 2015 | V.C. Summer, Unit 1 - Response to Request for Information (NRC Inspection Report No. 05000395/2015404) | Cyber Security |
RC-15-0160, Response to Request for Information (NRC Inspection Report No. 05000395/2015404) | 25 September 2015 | Response to Request for Information (NRC Inspection Report No. 05000395/2015404) | Cyber Security |
ML15310A076 | 21 September 2015 | Response to Request for Information to Support the Cyber Security Inspection | Cyber Security |
RC-15-0142, License Amendment Request, LAR 12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis, Response to Request for Additional Information | 10 September 2015 | License Amendment Request, LAR 12-04269, License Basis Changes in Steam Generator Tube Rupture Analysis, Response to Request for Additional Information | |
RC-15-0116, Response to NRC Request for Information Baseline Radiation Safety Inspection | 13 July 2015 | Response to NRC Request for Information Baseline Radiation Safety Inspection | High Radiation Area Offsite Dose Calculation Manual Locked High Radiation Area Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report |