|
---|
Category:Letter
MONTHYEARIR 05000298/20240032024-11-0505 November 2024 Integrated Inspection Report 05000298/2024003 ML24250A2052024-10-0808 October 2024 Issuance of Amendment No. 278 Regarding Revision to Technical Specification Table 3.3.2.1-1 and Transfer of Minimum Critical Power Ratio Values to Core Operating Limit Report ML24227A0822024-09-0303 September 2024 Summary of Regulatory Audit in Support of License Amendment Request to Modify the High Pressure Coolant Injection Low Flow Value IR 05000298/20240052024-08-22022 August 2024 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2024005) IR 05000298/20240022024-07-25025 July 2024 Integrated Inspection Report 05000298/2024002 ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24197A1462024-07-15015 July 2024 NRC Region IV Ltr to Cooper Nuclear Station Re FEMA Level 1 Finding ML24134A1782024-07-0303 July 2024 Issuance of Amendment No. 276 Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil and Starting Air, to Allow for Cleaning, Inspection and Any Needed Repairs During Refuel Outage 33 ML24197A0682024-06-24024 June 2024 FEMA Ltr to Missouri State Emergency Management Agency - Level 1 Finding, 24 June 2024 ML24192A0112024-06-13013 June 2024 2024-06-Post Exam Comments 05000298/LER-2023-002-01, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2024-06-0606 June 2024 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications IR 05000298/20244012024-06-0404 June 2024 Security Baseline Inspection Report 05000298/2024401 ML24151A1082024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24137A0942024-05-17017 May 2024 Regulatory Audit Plan in Support of License Amendment Request to Modify Allowable Value Regarding Technical Specification for High Pressure Coolant Injection Pump Discharge Low Flow 05000298/LER-2024-005, High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical2024-05-13013 May 2024 High Pressure Coolant Injection Pressure Switch Installation Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited B Technical. 05000298/LER-2024-004, Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications2024-05-0909 May 2024 Main Turbine Stop Valve Position Switches Do Not Meet Channel Independence Criteria Results in Two Channels Being Declared Inoperable and a Condition Prohibited by Technical Specifications IR 05000298/20240012024-05-0303 May 2024 Integrated Inspection Report 05000298/2024001 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20240102024-04-24024 April 2024 Comprehensive Engineering Team Inspection Report 05000298/2024010 05000298/LER-2024-003, High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications2024-04-22022 April 2024 High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML24093A2282024-04-0202 April 2024 Notice of Enforcement Discretion for Cooper Nuclear Station IR 05000298/20240902024-04-0101 April 2024 – Notice of Violation, NRC Inspection Report 05000298/2024090 05000298/LER-2024-001, Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications2024-03-0404 March 2024 Inoperable Turbine Stop Valve Limit Switch Causes Condition Prohibited by Technical Specifications 05000298/LER-2024-002, Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump2024-03-0404 March 2024 Technical Specifications Prohibited Condition for Inoperable Service Water Booster Pump IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 IR 05000298/20230042024-02-12012 February 2024 Integrated Inspection Report 05000298/2023004 ML24033A3092024-02-12012 February 2024 Summary of Regulatory Audit Regarding the Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20230122024-02-12012 February 2024 NRC Inspection Report 05000298/2023012 ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements 05000298/LER-2023-002, Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications2023-12-20020 December 2023 Secondary Containment Differential Pressure Perturbation Exceeds Technical Specifications ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23311A1122023-11-0909 November 2023 Project Manager Assignment IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20243012023-09-0101 September 2023 Notification of NRC Initial Operator Licensing Examination 05000298/2024301 IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 05000298/LER-2022-002-01, Manual Core Spray Injection to Restore Skimmer Surge Tank Level2023-06-29029 June 2023 Manual Core Spray Injection to Restore Skimmer Surge Tank Level ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 05000298/LER-2022-004-01, 1 for Cooper Nuclear Station, Manual Reactor Scram and Group I Isolation Due to Main Turbine Bypass Valve Failing Open2023-05-11011 May 2023 1 for Cooper Nuclear Station, Manual Reactor Scram and Group I Isolation Due to Main Turbine Bypass Valve Failing Open 05000298/LER-2023-001, Valve Test Failures Result in Condition Prohibited by Technical Specifications2023-05-0808 May 2023 Valve Test Failures Result in Condition Prohibited by Technical Specifications IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report 2024-09-03
[Table view] |
Text
ADAMS Accession # ML24197A068 U.S. Department of Homeland Security FEMA Region 7 11224 Holmes Road Kansas City, MO 64131
June 24, 2024
James W. Remillard, Director Department of Public Safety State Emergency Management Agency 2302 Militia Drive Jefferson City, Missouri 65102
Subject:
Notification of Level 1 Finding (Corrected), 2024 Cooper Nuclear Station Medical Services Drill
Director Remillard:
In accordance with the REP Program Manual (RPM) dated December 2023, this letter serves as formal notification of a Level 1 Finding that was observed during the Medical Services Drill conducted on May 9, 2024. This drill was conducted Out Of Sequence in support of the 2024 Cooper Nuclear Station Biennial Plume Phase/Hostile Action Based Exercise conducted on May 21, 2024.
Drill participants included the Community Hospital-Fairfax, located in Fairfax, MO, and the Nodaway County Ambulance Service, located in Ma ryville, MO.
The RPM defines a Level 1 Finding as an observed or identified inadequacy of organizational performance in an assessment activity that could cause a finding that offsite emergency preparedness is not adequate to provide reasonable assurance that appropriate protective measures can be taken in the event of a radiological emergency to protect the health and safety of the public living in the vicinity of a nuclear power plant. The Level 1 Finding was observed for both participants in the Medical Services Drill and is summarized below.
Capability Target 5.3: Transportation and Treatment of Contaminated, Injured Individuals
Condition: The Ludlum Model 26 monitoring instruments provided in the Community Hospital-Fairfax and Nodaway County Ambulance Service equipment kits did not have range of reading stickers affixed to document the acceptable range of readings when conducting a response check with the instruments. In addition, the accompanying certification of calibration documents in each kit did not match the instruments provided.
Possible Cause: The Missouri State Emergency Management Agency (SEMA) did not ensure proper calibration of the instruments, including accurate documentation, and did not ensure range of reading stickers were affixed to the instruments.
Effect: The hospital staff and ambulance crew did not have a calibrated meter to detect the presence of possible radiological contamination and were unable to operationally check the instrument against the provided test source. Without a proper instrument they could not adequately detect possible contamination on a patient, themselves, or their equipment. This could jeopardize the safety of the patient and the emergency workers.
www.fema.gov Per applicable plans and procedures, SEMA is responsible for calibration of the instruments and therefore is responsible to correct the Finding for both drill participants.
Following the drill, SEMA took immediate actions to begin correcting the observed issues. On June 17, 2024, SEMA presented the monitoring instruments for both locations to FEMA Region 7.
Regional staff verified that all the instruments had been calibrated, with appropriate documentation, and that range of reading stickers had been affixed to each. FEMA has determined that the Level 1 Finding has been corrected and is closed. A remedial exercise or demonstration is not required.
The 2024 Cooper Nuclear Station Biennial Exercise After Action Report will reflect the correction.
Please acknowledge receipt of this letter no later than July 15, 2024.
Your timely actions to correct this matter are sincerely appreciated. Please contact Thomas Morgan at Thomas.Morgan5@fema.dhs.gov or (816) 808-2756 for any additional information.
Sincerely, ANDREA K Digitally signed by ANDREA K SPILLARS SPILLARS Date: 2024.06.24 11:29:26 -05'00' Andrea Spillars Regional Administrator FEMA Region 7
cc: Tom Warnock, FEMA HQ Darren Bates, FEMA HQ Melissa Friel, SEMA Jeff Childs, SEMA Ryan Alexander, NRC Region IV Matthew Nee, NPPD Kim Tanner, NPPD
www.fema.gov