ML23349A147

From kanterella
Revision as of 02:26, 19 September 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 2
Date released: 12/19/2023 Download: ML23349A147



Kairos Power LLC, Changes to Preliminary Safety Analysis Report (PSAR) Chapter 2
ML23349A149
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 12/15/2023
From:
Kairos Power
To:
Office of Nuclear Reactor Regulation
References
KP-NRC-2312-001
Download: ML23349A149
Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 2
ML23349A148
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 12/15/2023
From: Hastings P
Kairos Power
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
KP-NRC-2312-001
Download: ML23349A148