Letter Sequence Other |
---|
EPID:L-2023-LLR-0004, Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspections (Relief Request RR-ENG-4-06) (Approved, Closed) |
|
MONTHYEARML23032A4842023-02-0101 February 2023 Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspections (Relief Request RR-ENG-4-06) Project stage: Request ML23065A0912023-03-0303 March 2023 NRR E-mail Capture - South Texas Project - Draft Supplemental Information Request - Proposed Alternative to the Requirements of the ASME Code Project stage: Draft Other ML23068A3642023-03-0909 March 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) Project stage: Supplement ML23096A1592023-04-0606 April 2023 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code Project stage: Acceptance Review ML23115A0702023-04-24024 April 2023 NRR E-mail Capture - South Texas Project Units 1 and 2 - Audit Plan - Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections Project stage: Other ML23229A4992023-08-17017 August 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) Project stage: Supplement ML23319A4442023-11-15015 November 2023 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements Project stage: Draft RAI ML23334A0062023-11-29029 November 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements Project stage: RAI ML23339A1902023-12-0505 December 2023 Update Foreign Ownership, Control, or Influence (FOCI) Project stage: Request NOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) Project stage: Supplement ML24033A3002024-02-0707 February 2024 Summary of Regulatory Audit Regarding a Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections Project stage: Other ML24040A1962024-02-13013 February 2024 Authorization and Safety Evaluation for Alternative Request No. RR-ENG-4-06 Project stage: Approval 2023-03-03
[Table View] |
|
---|
Category:Audit Report
MONTHYEARML24033A3002024-02-0707 February 2024 Summary of Regulatory Audit Regarding a Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ML21236A3082021-09-10010 September 2021 Regulatory Audit Summary Regarding License Amendment Request to Revise Moderator Temperature Coefficient Surveillance Requirements ML20142A2792020-05-27027 May 2020 Regulatory Audit Summary Regarding Exigent License Amendment Request to Revise the Safety Injection Accumulators Pressures ML17107A3192017-05-16016 May 2017 Aluminum Bronze Selective Leaching Aging Management Program Audit Report Regarding the South Texas Project, Units 1 and 2, License Renewal Application (CAC Nos. ME4936 and ME4937) ML16218A2562016-08-30030 August 2016 Aluminum Bronze Selective Leaching Aging Management Program and PWR Reactor Internals Program Inspection Plan Audit Report Regarding the South Texas Project, Units 1 and 2 ML16214A2912016-08-26026 August 2016 Summary of June 28-30, 2016, Regulatory Audit at Westinghouse in Rockville, MD, License Amendment Request to Revise Technical Specification 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies ML16141B0812016-05-31031 May 2016 Audit Summary, Risk Audit on April 12-13, 2016, at Alumni Center at the University of Texas, Austin, Tx; Pilot Generic Safety Issue 191 Submittal and Exemption Request, and Draft Request for Additional Information ML16127A4002016-05-11011 May 2016 Audit Summary, Thermal-Hydraulic Review on February 23-25, 2016 at Texas A&M University; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue 191 (CAC MF2400-MF2409) ML16103A3442016-04-26026 April 2016 Summary of February 24-26, 2016 Audit, Debris Transport Review at Alion Science and Technology Corporation, Albuquerque, Nm; Pilot Submittal and Exemption Request, Risk-Informed Approach to Resolve GSI 191 ML16095A0102016-04-13013 April 2016 Summary of November 17-19, 2015 Thermal-Hydraulic Review at Texas A&M University; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC MF2400-MF2409) ML16096A0652016-04-13013 April 2016 Summary of February 4 and 16, 2016, Regulatory Audit at Westinghouse in Rockville, MD, Boric Acid Precipitation, Exemption and License Amendment Request, Risk-Informed Approach to Resolve Generic Safety Issue 191 ML16029A2722016-03-15015 March 2016 12/7-8/2015 Audit Summary, Audit Conducted to Support License Amendment Request to Revise TS 5.3.2 to Allow Operation with 56 Full-Length Control Rod Assemblies for Unit 1 Cycle 20 (Emergency Circumstances) ML15175A0242015-07-29029 July 2015 Audit Summary for May 12-14, 2015 Audit of Roverd Methodology Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (TAC Nos. MF2400 Through MF2409) ML15183A0072015-07-15015 July 2015 Audit Summary, 3/31 to 4/2/15 Audit of Systems, Structures and Equipment at STP Facility; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 ML15131A1452015-06-0404 June 2015 Audit Report for the 2015 Supplemental Audit STP License Renewal ML15111A4652015-05-0606 May 2015 Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 ML15183A0092015-04-0202 April 2015 Photos, Audit Summary, 3/31 to 4/2/15 Audit of Systems, Structures and Equipment at STP Facility; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 ML14321A6772015-01-15015 January 2015 Audit Report for 9/16-17/2014 Audit at University of New Mexico Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (TAC MF2400 Through and MF2409) ML13339A7362014-01-29029 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML12165A2392012-06-15015 June 2012 Report Regarding the Follow-up Audit of the Selective Leaching of Aluminum Bronze Aging Management Program for the South Texas Project, Units 1 and 2, License Renewal Application (TAC ME4936 and ME4937) ML11224A2652011-09-22022 September 2011 Aging Management Programs Audit Report Regarding the South Texas Project, Units 1 and 2, Station License Renewal Application (TAC Nos. ME4936 and ME4937) ML1122106582011-09-0707 September 2011 Audit of the Licensee Regulatory Commitment Management Program, Audit Performed July 19-20, 2011 ML11230A0032011-09-0606 September 2011 Scoping and Screening Audit Report Regarding the South Texas Project, Units 1 and 2 (TAC Nos. ME4936 and ME4937) ML11173A3042011-07-18018 July 2011 Audit Report Regarding South Texas Project License Renewal Application - Cultural Resource ML11145A0642011-06-21021 June 2011 Plan for the Environmental Related Regulatory Audit Regarding the South Texas Project, Units 1 and 2, License Renewal Application Review (TAC Nos. ME4938 and ME4939) ML0834501622008-12-24024 December 2008 Audit Report of Licensee Regulatory Commitment Management Program for Audit Performed August 19, 2008 ML0721101192007-08-16016 August 2007 Us NRC Audit Report for South Texas Project Combined License Application Review ML0426702502004-09-22022 September 2004 Audit of the Licensees Management of Regulatory Commitments NOC-AE-04001712, Appendix a Cameco Corporation 2003 Consolidated Audited Financial Statements2004-02-27027 February 2004 Appendix a Cameco Corporation 2003 Consolidated Audited Financial Statements 2024-02-07
[Table view] Category:Letter
MONTHYEARML24304B0512024-10-30030 October 2024 Cycle 26 Core Operating Limits Report IR 05000498/20244022024-10-23023 October 2024 Security Baseline Inspection Report 05000498/2024402 and 05000499/2024402 05000499/LER-2024-003, Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function2024-10-22022 October 2024 Containment Isolation Valve Inoperable Resulting in Condition Prohibited by Technical Specification and Prevention of Fulfillment of Safety Function ML24295A0772024-10-21021 October 2024 Licensed Operator Positive Fitness-for-Duty Test 05000499/LER-2024-002, Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-10-17017 October 2024 Two Control Room Envelope HVAC Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24290A1162024-10-16016 October 2024 Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan ML24255A0322024-09-30030 September 2024 The Associated Independent Spent Fuel Storage Installation - Notice of Consideration of Approval of Direct Transfer of Licenses and Opportunity to Request a Hearing (EPID L-2024-LLM-0002) - Letter ML24269A1762024-09-25025 September 2024 Tpdes Permit Renewal Application WQ0001 908000 05000498/LER-2024-004, Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps2024-09-19019 September 2024 Loss of Offsite Power Resulting in Unit 1 Automatic Reactor Trip and Actuation of Emergency Diesel Generators and Auxiliary Feedwater Pumps ML24271A3022024-09-18018 September 2024 STP-2024-09 Post-Exam Comments - Redacted ML24274A0902024-09-16016 September 2024 Written Response - EA-24-026 STP Operator - Redacted ML24250A1882024-09-11011 September 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal 05000499/LER-2024-001-01, Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-08-29029 August 2024 Supplement to Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators IR 05000498/20240052024-08-22022 August 2024 Updated Inspection Plan for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2024005 and 05000499/2024005) IR 05000498/20240022024-08-0909 August 2024 Integrated Inspection Report 05000498/2024002 and 05000499/2024002 IR 05000498/20240102024-08-0808 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000498/2024010 and 05000499/2024010 ML24218A1462024-07-26026 July 2024 2. EPA Comments on South Texas Project Exemption Ea/Fonsi ML24207A1782024-07-25025 July 2024 Licensed Operator Positive Fitness-For-Duty Test 05000499/LER-2024-001, Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators2024-07-0202 July 2024 Automatic Reactor Trip and Actuation of Two of Three Emergency Diesel Generators 05000498/LER-2024-003, Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump2024-07-0101 July 2024 Condition Prohibited by Technical Specifications and Potential Loss of Safety Function Due to Inoperable Low Head Safety Injection Pump 05000498/LER-2024-002-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-27027 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function 05000498/LER-2023-003-01, Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-06-19019 June 2024 Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24137A0882024-05-15015 May 2024 Operator Licensinq Examination Schedule Revision 3 ML24136A2872024-05-15015 May 2024 Submittal of 2024 Nrc/Fema Evaluated Exercise Scenario Manual ML24136A2842024-05-15015 May 2024 Independent Spent Fuel Storage Installation Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance ML24130A2712024-05-0909 May 2024 Re Two Essential Chilled Water Trains Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24128A1572024-05-0707 May 2024 Independent Spent Fuel Storage Installation Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance IR 05000498/20240012024-05-0606 May 2024 Integrated Inspection Report 05000498/2024001 & 05000499/2024001 ML24120A3762024-04-29029 April 2024 Annual Dose Report for 2023 ML24116A3032024-04-25025 April 2024 Operations Quality Assurance Plan Condition Adverse to Quality Definition Change Resulting in a Reduction in Commitment ML24116A2282024-04-25025 April 2024 Annual Environmental Operating Report 05000498/LER-2023-004-01, Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water2024-04-25025 April 2024 Condition Prohibited by Technical Specifications Due to Inoperable Train of Essential Chilled Water ML24117A1602024-04-24024 April 2024 2023 Radioactive Effluent Release Report ML24102A2452024-04-23023 April 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0046 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24113A3122024-04-22022 April 2024 Cycle 24 Core Operating Limits Report ML24097A0072024-04-0606 April 2024 Relief Request Number RR-ENG-4-07 – Request for an Alternative to ASME Code Case N-729-6 for Reactor Vessel Head Penetration 75 05000498/LER-2024-001, Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function2024-04-0101 April 2024 Re Two Steam Generator Power Operated Relief Valves (Porvs) Inoperable Resulting in a Condition That Could Have Prevented Fulfillment of a Safety Function ML24088A3022024-03-28028 March 2024 Financial Assurance for Decommissioning - 2024 Update ML24081A3972024-03-21021 March 2024 Response to Request for Additional Information for Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24080A2902024-03-19019 March 2024 Nuclear Liability Certificates of Insurance NOC-AE-240040, Nuclear Liability Certificates of Insurance2024-03-19019 March 2024 Nuclear Liability Certificates of Insurance ML24066A2002024-03-0606 March 2024 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes ML24079A1312024-03-0505 March 2024 Nuclear Insurance Protection ML24060A1742024-02-28028 February 2024 Submittal of Annual Fitness for Duty Performance Report for 2023 IR 05000498/20230062024-02-28028 February 2024 Annual Assessment Letter for South Texas Project Electric Generating Station, Units 1 and 2 (Report 05000498/2023006 and 05000499/2023006) IR 05000498/20240132024-02-27027 February 2024 Design Basis Assurance Inspection (Programs) Commercial Grade Dedication IR 05000498/2024013 and 05000499/2024013 ML24022A2252024-02-20020 February 2024 Issuance of Amendment Nos. 227 and 212 to Authorize the Revision of the Alternative Source Term Dose Calculation ML24050A0082024-02-19019 February 2024 Evidence of Financial Protection ML24045A0922024-02-16016 February 2024 Response to STP FOF Move Letter (2024) 2024-09-30
[Table view] |
Text
February 7, 2024
Mr. G. T. Powell President and Chief Executive Officer STP Nuclear Operating Company P.O. Box 289 Wadsworth, TX 77483
SUBJECT:
SOUTH TEXAS PROJECT, UNITS 1 AND 2 -
SUMMARY
OF REGULATORY AUDIT REGARDING A PROPOSED ALTERNATIVE TO ASME CODE, SECTION XI REQUIREMENTS FOR CONTAINMENT BUILDING INSPECTIONS (EPID L-2023-LLR-0004)
Dear Mr. Powell:
By letter dated February 1, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23032A484), as sup plemented by letters dated March 9, 2023 (ML23068A364), August 17, 2023 (ML23229A499), and December 14, 2023 (ML23348A375),
STP Nuclear Operating Company (STPNOC, the licensee) submitted a proposed alternative to subsection IWL of the American Society of Mechanical Engineer Boiler and Pressure Vessel Code (ASME Code),Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, regarding the frequency of certain containment unbonded post-tensioning system inservice inspections at South Texas Project Units 1 and 2.
To support its review, the U.S. Nuclear Regulatory Commission (NRC) staff conducted a regulatory audit via the use of an online reference portal set up by the licensee, and a webinar.
The NRC staff reviewed documents and held discuss ions with the licensees staff concerning the proposed alternative. The audit summary is enclosed with this letter.
G. Powell
If you have any questions, please contact me at 301-415-6256 or via email at Dennis.Galvin@nrc.gov .
Sincerely,
/RA/
Dennis J. Galvin, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Docket Nos. 50-498 and 50-499
Enclosure:
Audit Summary
cc: Listserv OFFICE OF NUCLEAR REACTOR REGULATION
REGULATORY AUDIT
SUMMARY
IN SUPPORT OF PROPOSED ALTERNATIVE TO ASME CODE, SECTION XI
REQUIREMENTS FOR CONTAINMENT BUILDING INSPECTIONS
STP NUCLEAR OPERATING COMPANY
SOUTH TEXAS PROJECT, UNITS 1 AND 2
DOCKET NOS. 50-498 AND 50-499
1.0 BACKGROUND
By letter dated February 1, 2023 (Agencywide Documents Access and Management (ADAMS)
Accession No. ML23032A484), as supplemented by letters dated March 9, 2023 (ML23068A364), August 17, 2023 (ML23229A499), and December 14, 2023 (ML23348A375),
STP Nuclear Operating Company (STPNOC, the licensee) submitted a proposed alternative to subsection IWL of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, Rules for Inservice Inspection of Nuclear Power Plant Components, regarding the frequency of certain containment unbonded post-tensioning system inservice inspections at South Texas Project Units 1 and 2 (STP).
The U.S. Nuclear Regulatory Commission (NRC) staff reviewed the licensees submittal and determined that a regulatory audit would support its review of the proposed alternative. The audit was conducted in accordance with the audit plan dated April 24, 2023 (ML23115A070).
The purpose of the audit was to review the documentation related to the subject of its application (e.g., calculations and reports) that were not submitted on the STP docket, to acquire additional understanding about the proposed alternative, and to determine whether additional information is needed to be docketed to complete the NRC staffs safety evaluation.
2.0 AUDIT ACTIVITIES
The audit was conducted via the use of an online reference portal set up by the licensee and webinars. Through the online reference portal, the NRC staff reviewed the licensees documents made available from April 27, 2023, through December 31, 2023. The August 17, 2023, supplement to the proposed alternative reflected the outcome of the audit discussions.
The NRC staff, contractors, and the licensee conducted a webinar on June 26, 2023. of this audit summary lists the individuals that took part in, or attended the audit.
The webinar discussions were focused on the following major technical areas: Clarification of apparent proposed future alternatives beyond the scope of the 35 th year proposed alternative, and methodology used for post tensioned tendon liftoff force regression analysis. At the end of the webinar on June 26, 2023, the NRC staff presented a brief conclusion of the audit discussions, including audit objectives that were met and details on the path forward. There were no open items from the audit discussions and no deviations from the audit plan.
Non-docketed information provided by the lic ensee and reviewed by the NRC staff is listed in attachment 2 of this audit summary. The licensee committed to issuing a supplement to the
Enclosure
proposed alternative to provide documentation of certain audit discussion points on the docket, which was completed with the August 17, 2023, supplement. The NRC staff reviewed the August 17, 2023, supplement and noted that th e proposed alternative discusses future proposed alternatives to ASME Code Section XI, IWL-2421(b) for the 40 th year and beyond in addition to the subject alternative request at the 35 th year. A request for additional information (RAI) was issued on November 29, 2023 ( ML23334A006), to seek clarification on the additional proposed alternatives, and the RAI was addressed in the December 14, 2023, supplement.
Since there were no remaining audit issues, the audit was closed on December 31, 2023.
3.0 RESULTS OF THE AUDIT
The audit identified information to be provided on the docket, which the licensee agreed to provide through supplements to the proposed alternative. The licensee provided the last supplement on December 14, 2023. As discussed during the audit, the supplement replaces the proposed alternative and the previous supplements in its entirety and included change bars.
Thus, those details are not included in this audit summary.
Attachments:
- 1. Audit Participants
- 2. List of Documents Reviewed During Audit Audit Participants
U.S. Nuclear Regulatory Commission Dennis Galvin Shao Lai George Wang
STP Nuclear Operating Company Wendy Brost Zachary Dibbern
Attachment 1 List of Documents Reviewed During Audit
STP Nuclear Operating Company (the licensee) provided an extensive list of supporting documents (e.g., analyses, calculations, reports, drawings, and procedures) on the South Texas Project, Units 1 and 2 (STP), document portal available during the audit period. Below lists the documents available on the portal that the U.S. Nuclear Regulatory Commission audit team reviewed during the audit.
10th Year Inservice Tendon Surveillance for Unit 1 Containment Post Tensioning System, dated November 5, 1998.
10th Year Inservice Tendon Surveillance for Unit 2 Containment Post Tensioning System, dated November 5, 1998.
Final Report for the 15th Year Post-Tensioning Surveillance, dated June 10, 2004.
Final Report South Texas Project Unit 1 Physical & Unit 2 Visual 20 th Year Containment Building Tendon Surveillance, dated April 15, 2009.
Unit 2 Containment External Concrete Inspection, dated January 5, 2011.
Final Report for the 25th Year Tendon Surveillance at STP Nuclear Generating Station, August 4, 2014.
Final Report for the Containment Structure Tendon Surveillance at South Texas Project Nuclear Power Plant Unit 1 and Unit 2 [30th year surveillance report],
dated April 19, 2018.
Regression Analysis for the Unit 1 30 th Year Tendon Surveillance at South Texas Nuclear Power Plant, dated April 19, 2018.
Attachment 2
ML24033A300 *concurrence by email OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA* NRR/DEX/ESEB/BC*
NAME DGalvin PBlechman ITseng DATE 2/6/2024 2/6/2024 1/30/2024 OFFICE NRR/DORL/LPL4/BC* NRR/DORL/LPL4/PM*
NAME JRankin DGalvin DATE 2/7/2024 2/7/2024