ML24197A055

From kanterella
Revision as of 01:14, 28 August 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Requalification Program Inspection
ML24197A055
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 07/15/2024
From: Diane Jackson
NRC/RGN-I/DORS/OB
To: Mcfeaters C
Public Service Enterprise Group
References
Download: ML24197A055 (1)


Text

B. Berryman

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE RD, STE 102 KING OF PRUSSIA, PENNSYLVANIA 19406- 1415

July 15, 2024

Charles McFeaters President and Chief Nuclear Officer PSEG Nuclear, LLC - N09 P.O. Box 236 Hancocks Bridge, NJ 08038

SUBJECT:

HOPE CREEK GENERATING STATION - R EQUALIFICATION PROGRAM INSPECTION

Dear Charles McFeaters:

In a telephone conversation on July 8 , 2024, Todd Fish, Senior Operations Engineer, and Steven Hamler, Licensed Operator Requalification Program Lead, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Hope Creek facility. The inspection is planned for the week of October 21, 2024, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with Title 10 of the Code of Federal Regulations ( 10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: ( 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; ( 2) an index or summary of condition reports written in the past two years on simulator performance problems; ( 3) an index or summary of simulator performance test results in the past two years; and ( 4) the examination schedule, sample plan, written examinations, and operating test scheduled for the week of the inspection to the NRC by the week of October 14, 2024 . Steven Hamler has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget (OMB), approval number 3150-0018.

The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions C. McFeaters 2

for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52),

U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV  ; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB- 10202, (3150- 0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC s document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading- rm/adams.html (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Todd Fish at (610) 337-5369.

Sincerely,

Donald E. Jackson, Chief Operations Branch Division of Operating Reactor Safety

Docket No. 05000354 License No. NPF-57

cc: Distribution via ListServ

C. McFeaters 3

SUBJECT:

HOPE CREEK GENERATING STATION - REQUALIFICATION PROGRAM INSPECTION D AT E D J U LY 15, 2024

DISTRIBUTION:

TFish, DORS DJackson, DORS LPinkham, DORS, OLA BBickett, DORS RClagg, DORS SQuiroga, DORS PFinney, DORS, SRI JBresson, DORS, RI CFragman, DORS, AA MSimmons, RI OEDO RidsNrrPMHopeCreek Resource RidsNrrDorlLpl1 Resource

DOCUMENT NAME: G:\\DRS\\Operations Branch\\FISH\\ Requal FY25 - HC Oct 2024\\Hope Creek LOR Corp Letter.docx ADAMS ACCESSION NO. ML24197A055

SUNSI Review n -Sensitive Publvaae Sensitive n -Pubc Avlle

OFFICE RI/DO RS/OB RI/DO RS/OB NA TFish/TF DEJackson/DEJ D AT E 7/9/2024 7/12/2024 OFFICIAL RECORD COPY