ML23341A185

From kanterella
Revision as of 16:54, 5 January 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Acknowledgement of Response to NRC Inspection Report 05000341/2023402 and Disputed Non-Cited Violation
ML23341A185
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/08/2023
From: Jorge Corujo-Sandin
NRC/RGN-III/DORS/EB2
To: Peter Dietrich
DTE Electric Company
References
EA-23-143
Download: ML23341A185 (1)


See also: IR 05000341/2023402

Text

December 8, 2023

EA-23-143

Peter Dietrich

Senior VP and Chief Nuclear Officer

DTE Electric Company

Fermi 2 - 260 TAC

6400 North Dixie Highway

Newport, MI 48166

SUBJECT: FERMI POWER PLANT, UNIT 2 - ACKNOWLEDGEMENT OF RESPONSE TO

NRC INSPECTION REPORT 05000341/2023402 AND DISPUTED NON-CITED

VIOLATION

Dear Peter Dietrich:

This letter acknowledges your November 13, 2023, correspondence sent in response to

U.S. NRC Inspection Report 05000341/2023402 (ML23276B454) dated October 5, 2023. In

your letter, you dispute one non-cited violation (NCV 05000341/2023402-01). The NRC is

currently reviewing your basis for contesting the violation in accordance with Section 2.8 of the

Enforcement Manual. Accordingly, we will provide the results of our evaluation by written

response upon completion of our review.

The disputed violation contains Security-Related Information, so the details will not be made

publicly available in accordance with Title 10 of the Code of Federal Regulations

(10 CFR) 2.390(d)(1). In accordance with 10 CFR 2.390, Agency Rules of Practice, a copy of

this letter will be made available electronically for public inspection in the NRC Public Document

Room or in the NRCs ADAMS, accessible from the NRCs website at

http://www.nrc.gov/reading-rm/adams.html.

P. Dietrich 2

Should you have any questions concerning this inspection, please contact me at

Jorge.Corujo-Sandin@nrc.gov or 630-829-9741.

Sincerely,

Signed by Corujo-Sandin, Jorge

on 12/08/23

Jorge Corujo-Sandin,

Acting Branch Chief,

Engineering Branch 2

Division of Operating Reactor Safety

Docket No. 05000341

License No. NPF-43

cc: Distribution via LISTSERV

P. Dietrich 3

Letter to Peter Dietrich from Jorge Corujo-Sandin dated December 8, 2023.

SUBJECT: FERMI POWER PLANT, UNIT 2 - ACKNOWLEDGEMENT OF RESPONSE TO

NRC INSPECTION REPORT 05000341/2023402 AND DISPUTED NON-CITED

VIOLATION

DISTRIBUTION:

John Giessner

Mohammed Shuaibi

Julio Lara

Jason Kozal

Shannon Rogers

Jorge Corujo-Sandin

Diana Betancourt

Ken Lambert

Geoffrey Edwards

Michelle Garza

Sarah Bakhsh

Juan Peralta

David Furst

Brian Yip

ADAMS Accession Number: ML23341A185

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

OFFICE RIII-EICS RIII-DORS

NAME DBetancourt- JCorujo-Sandin

Roldan:sw

DATE 12/07/2023 12/08/2023

OFFICIAL RECORD COPY