MONTHYEARML20329A2922020-11-16016 November 2020 Application for Subsequent Renewed Facility Operating Licenses Project stage: Request ML20321A1872020-11-16016 November 2020 Single Positive Test Form Collected on 02/11/2020 Project stage: Request ML20329A2482020-11-16016 November 2020 Enclosure 3, Attachment 2, Appendix E Applicant'S Environmental Report Subsequent Operating License Renewal Point Beach Nuclear Plant Units 1 and 2 Project stage: Other ML21033A4022021-01-22022 January 2021 NextEra Energy Point Beach - Point Beach Nuclear Plant - Units 1 and 2 Subsequent License Renewal Project stage: Other ML20351A3922021-01-26026 January 2021 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping Process (EPID No. L-2020-SLE-0002) (Docket No. 50 266 and 50-301) - Letter Project stage: Other PMNS20210090, Environmental Scoping Meeting Related to the Point Beach Nuclear Plant, Unit Nos. 1 and 2 (Point Beach), Subsequent License Renewal Application2021-02-0303 February 2021 Environmental Scoping Meeting Related to the Point Beach Nuclear Plant, Unit Nos. 1 and 2 (Point Beach), Subsequent License Renewal Application Project stage: Meeting ML21042B9452021-02-17017 February 2021 Scoping and Process Meeting - February 17, 2021 Project stage: Meeting ML21075A3432021-02-17017 February 2021 Meeting Summary: Public Scoping Meeting for the Environmental Review of the Subsequent License Renewal Application for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (EPID No.: L-2020-SLE-0002) - Summary Project stage: Meeting ML21062A1922021-02-17017 February 2021 Transcript from Point Beach Nuclear Plant Subsequent License Renewal Scoping Meeting Project stage: Meeting ML21070A2072021-03-15015 March 2021 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application Project stage: Approval ML21075A3422021-03-17017 March 2021 Meeting Summary: Public Scoping Meeting for the Environmental Review of the Subsequent License Renewal Application for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (EPID No.: L-2020-SLE-0002) - Memo Project stage: Meeting ML21077A1972021-03-18018 March 2021 SLR - FW: Distribution: Meeting Summary: Public Scoping Meeting for the Environmental Review of the Subsequent License Renewal Application for Point Beach Nuclear Plant, Unit Nos. 1 and 2 Project stage: Meeting ML21084A2582021-03-25025 March 2021 Public Comment Period Extension Request for Point Beach Subsequent License Renewal Scoping Project stage: Other ML21124A0312021-05-11011 May 2021 Summary of the Environmental Site Audit Related to the Review of the Subsequent License Renewal Application (EPID Number: L-2020-SLE-0002) Project stage: Approval ML21134A0582021-05-14014 May 2021 Final Request for Additional Information and Requests for Confirmation of Information - Point Beach SLRA Environmental Review (EPID No. L-2020-SLE-0002) - Email Project stage: RAI ML21134A0612021-05-14014 May 2021 Final Request for Additional Information and Requests for Confirmation of Information - Point Beach SLRA Environmental Review (EPID No. L-2020-SLE-0002) - Enclosure Project stage: RAI ML21138A8242021-05-18018 May 2021 SLR - FW: Final Request for Additional Information and Requests for Confirmation of Information Point Beach SLRA Environmental Review Project stage: RAI ML21138A8232021-05-18018 May 2021 SLR - FW: Final Request for Additional Information and Requests for Confirmation of Information Point Beach SLRA Environmental Review Project stage: RAI ML21194A1792021-08-16016 August 2021 Environmental Scoping Report Associated with the NRC Review of the Point Beach Subsequent License Renewal Application Project stage: Approval ML21194A1752021-08-16016 August 2021 Letter - Issuance of Environmental Scoping Report Associated with the NRC Review of the Point Beach Subsequent License Renewal Application Project stage: Approval ML21319A2842021-11-15015 November 2021 Draft Supplemental Environmental Impact Statement Meeting Related to the Point Beach Nuclear Plant, Unit Nos. 1 and 2 (Point Beach), Subsequent License Renewal Application ML22004A0282021-12-0808 December 2021 Transcript from Point Beach Nuclear Plant Subsequent License Renewal Draft Supplemental Environmental Impact Statement - Public Comment Meeting - Evening Session ML22004A0232021-12-0808 December 2021 Transcript from Point Beach Nuclear Plant Subsequent License Renewal Draft Supplemental Environmental Impact Statement - Public Comment Meeting - Afternoon Session ML22004A0772022-01-0606 January 2022 Summaries of December 8, 2021 Draft Supplemental Environmental Impact Statement for Subsequent License Renewal Application Public Meetings 2021-03-15
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML23271A1542023-09-28028 September 2023 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Revise TS 5.5.17, Pre-Stressed Concrete Containment Tendon Surveillance Program ML23208A3072023-07-27027 July 2023 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Relief Requests Regarding I6-RR-1, I6-RR-2, and I6-RR-3 (EPIDs L-2023-LLR-0030, L-2023-LLR-0031, L-2023-LLR-0032) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23136A2782023-05-0505 May 2023 Email to R Coffey Point Beach SLRA Second Annual Update - Request for Additional Information Set 1 ML23122A0132023-05-0101 May 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding Risk-Informed Approach to Address GSI-191 ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23033A0292023-01-31031 January 2023 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI (Volume 2) - License Amendment Request Regarding TSTS-505 ML22354A1612022-12-20020 December 2022 NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding TSTS-505 ML22291A3692022-10-18018 October 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Use Beacon Power Distribution Monitoring System ML22249A0052022-09-0202 September 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment and Exemptions Regarding Risk-Informed Approach to Address GSI-191 ML22229A1052022-08-17017 August 2022 Response to Questions Regarding Point Beach Nuclear Power Plant with Attachment ML22229A1022022-07-18018 July 2022 Original Request - Questions Regarding Point Beach Nuclear Power Plant ML22196A0062022-07-15015 July 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Requested Licensing Action TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4b ML22094A0802022-04-0404 April 2022 NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-366 ML22006A2762022-01-0606 January 2022 SLR - FW: Subsequent License Renewal of Point Beach Nuclear Plant Unit Numbers 1 and 2, Manitowoc County, Wisconsin ML22006A1952022-01-0606 January 2022 SLR - FW: (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments NRCs Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, D ML22006A2012022-01-0606 January 2022 SLR - FW: Comments of Michael J Keegan on Dseis Point Beach ML22004A1672022-01-0404 January 2022 SLR - Ref: Point Beach ML22004A3192022-01-0404 January 2022 SLR - FW: Point Beach ML22004A0012022-01-0404 January 2022 SLR - FW: Comments of Michael J Keegan on Dseis Point Beach ML22006A1942022-01-0404 January 2022 SLR - (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments NRCs Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, Docke ML22004A3212022-01-0404 January 2022 SLR - FW: Comments of Michael J Keegan on Dseis Point Beach ML22004A3202022-01-0404 January 2022 SLR - FW: (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments NRCs Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, D ML22004A1732022-01-0404 January 2022 SLR - FW: (External_Sender) 3 Additional Organizations Endorsing the Coalition (Now 50 Organizations, and 27 Individuals) Public Comments NRCs Dsgeis on NextEra Point Beach Nuclear Power Plant Subsequent License Renewal, D ML22004A3182022-01-0404 January 2022 SLR - FW: EPA Comment Letter - Point Beach SEIS ML22006A1992022-01-0303 January 2022 SLR - (External_Sender) Comments of Michael J Keegan on Dseis Point Beach ML22004A3172021-12-21021 December 2021 SLR - (External_Sender) EPA Comment Letter - Point Beach SEIS ML21362A6822021-12-17017 December 2021 SLRA Safety RAIs Set 14 Final Email ML21362A6712021-12-15015 December 2021 SLRA Safety RAIs Set 13 Final Email ML22006A2752021-12-0202 December 2021 SLR - (External_Sender) Subsequent License Renewal of Point Beach Nuclear Plant Unit Numbers 1 and 2, Manitowoc County, Wisconsin ML21341A6102021-11-16016 November 2021 SLRA Safety RAI Set 12 Final Email ML21314A4212021-11-10010 November 2021 Fws to NRC, Concurrence with ESA Determination for Point Beach Subsequent License Renewal ML21307A1522021-11-0909 November 2021 NRC to Fws, Request for Concurrence with Endangered Species Act Determinations for Point Beach Subsequent License Renewal ML21287A0852021-10-14014 October 2021 SLRA Safety RAI Set 11 Final Email ML21279A1202021-10-0505 October 2021 Email: Wi Shpo Review Point Beach Nuclear Plant SLR ML21286A6032021-10-0505 October 2021 SLRA Safety RAIs Set 10 Final Email ML21273A0232021-09-0202 September 2021 SLRA Safety RAI Set 9 Final Email ML21242A2282021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 ML21242A2292021-08-27027 August 2021 SLRA Draft Safety RAI Set 9 Email ML21242A2462021-08-26026 August 2021 SLRA Safety RAIs Set 8 Final Email ML21242A2222021-08-23023 August 2021 SLRA Draft Safety RAI Set 8 ML21242A2232021-08-23023 August 2021 SLRA Draft Safety RAI Set 8 Email ML21242A2192021-08-20020 August 2021 SLRA Safety RAI Set 7 Final Email ML21242A2132021-08-13013 August 2021 SLRA Safety RAIs Set 7 Draft Email ML21242A2142021-08-13013 August 2021 SLRA Safety RAIs Set 7 Draft ML21242A2042021-08-12012 August 2021 SLRA Safety RAIs Set 5 Final Email ML21224A2042021-08-12012 August 2021 LTR-21-0225-1-RIII. Time Sensitive: Request for Further Inspection ML21242A0142021-08-12012 August 2021 SLRA Safety RAIs Set 6 Final Email ML21242A2382021-08-12012 August 2021 SLRA Safety RAIs Set 6 Final Email ML21242A0112021-08-0909 August 2021 SLRA Draft Safety RAIs Set 6 Email 2023-09-28
[Table view] |
Text
From: Clark, Phyllis Sent: Thursday, March 18, 2021 11:25 AM To: Imboden, Stacey; Folk, Kevin; Martinez, Nancy Cc: Elliott, Robert
Subject:
FW: RE: Distribution: Meeting Summary: Public Scoping Meeting for the Environmental Review of the Subsequent License Renewal Application for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (EPID No.: L 2020 SLE 0002)
FYI From: Douglas Taylor Sent: Thursday, March 18, 2021 11:15 AM To: Whitaker, Scheera ; Clark, Phyllis
Subject:
[External_Sender] RE: Distribution: Meeting Summary: Public Scoping Meeting for the Environmental Review of the Subsequent License Renewal Application for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (EPID No.: L 2020 SLE 0002)
Greetings, Ref: Point Beach Nuclear Plant License Renewal - EPID No: L2020-SLE-0002 Thank you for including the Nottawaseppi Huron Band of the Potawatomi in your consultation process.
From the description of your proposed project, it does not appear as if any cultural or religious concerns of the Tribes will be affected. We therefore have no objection to the project. Of course, if the project scope is significantly changed or inadvertent findings are discovered during the course of the project, please contact us for further consultation.
Very Respectfully Douglas R. Taylor Douglas R. Taylor l Tribal Historic Preservation Officer (THPO)
Pine Creek Indian Reservation 1301 T Drive S, Fulton, MI 49052 o: 269-704-8347 l c: 269-419-9434 l f: 269-729-5920 Douglas.Taylor@nhbp-nsn.gov l www.nhbpi.com Please consider the environment before printing this email. This message has been prepared on resources owned by the Nottawaseppi Huron Band of the Potawatomi located in the State of Michigan. It is subject to the Electronic Communications Policy of Nottawaseppi Huron Band of the Potawatomi. This communication may contain confidential (including protected health information as defined by HIPAA) or legally privileged information intended for the sole use of the designated recipient(s). If you are not the intended recipient, please notify the
sender immediately by reply e-mail and delete all copies of this communication and attachments without reading or saving them. If you are not the named addressee you are notified that disclosing, disseminating, copying, distributing or taking any action in reliance on the contents of this information is strictly prohibited From: Whitaker, Scheera <Scheera.Whitaker@nrc.gov>
Sent: Thursday, March 18, 2021 10:19 AM To: RidsNrrPMPointBeach Resource <RidsNrrPMPointBeach.Resource@nrc.gov>; NMSS_REFS_ELRB Distribution <NMSS_REFS_ELRBDistribution@nrc.gov>; Clark, Phyllis <Phyllis.Clark@nrc.gov>; Elliott, Robert <Robert.Elliott@nrc.gov>; Gibson, Lauren <Lauren.Gibson@nrc.gov>; Rogers, Bill
<Bill.Rogers@nrc.gov>; Haskell, Russell <Russell.Haskell@nrc.gov>; Salgado, Nancy
<Nancy.Salgado@nrc.gov>; Imboden, Stacey <Stacey.Imboden@nrc.gov>; Hartman, Thomas
<Thomas.Hartman@nrc.gov>; Petrella, Vance <Vance.Petrella@nrc.gov>; Burnell, Scott
<Scott.Burnell@nrc.gov>; William.Maher@fpl.com; Richard.Orthen@fpl.com Cc: MikeW@badriver-nsn.gov; THPO@badriver-nsn.gov; rbarrett@potawatomi.org; kelli.mosteller@potawatomi.org; Ned.DanielsJr@fcpotawatomi-nsn.gov; Michael.LaRonge@FCPotawatomi-nsn.gov; andy.werk@ftbelknap.org; mblackwolf@ftbelknap.org; tyderyien@hannahville.org; earlmeshigaud@hannahville.org; marlon.whiteeagle@ho-chunk.com; Bquackenbush@ho-chunk.com; louis.taylor@lco-nsn.gov; brian.bisonette@lco-nsn.gov; jwildcatsr@ldftribe.com; ldfthpo@ldftribe.com; tribalchair@ltbbodawa-nsn.gov; MWiatrolik@LTBBODAWA-NSN.GOV; Bob.Peters@glt-nsn.gov; mbpi_thpo@glt-nsn.gov.;
chairman@mitw.org; dgrignon@mitw.org; dlankford@miamination.com; dhunter@miamination.com; Jamie Stuck <Jamie.Stuck@nhbp-nsn.gov>; Douglas Taylor <Douglas.Taylor@nhbp-nsn.gov>;
thill7@oneidanation.org; sdanfor3@oneidanation.org; cethel.oto@gmail.com; rhonda.oto@gmail.com; matthew.wesaw@pokagonband-nsn.gov; matthew.bussler@pokagonband-nsn.gov; cosettewahwassuck@pbpnation.org; thomaswabmum@pbpnation.org; Richard.Peterson@redcliff-nsn.gov; marvin.defoe@redcliff-nsn.gov; robert.vanzile@scc-nsn.gov; adam.vanzile@scc-nsn.gov; susanl@stcroixtribalcenter.com; wandam@stcroixojibwe-nsn.gov; shannon.holsey@mohican-nsn.gov; nathan.allison@mohican-nsn.gov; tori.kitcheyan@winnebagotribe.com; sunshie.bear@winnebagotribe.com
Subject:
Distribution: Meeting Summary: Public Scoping Meeting for the Environmental Review of the Subsequent License Renewal Application for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (EPID No.: L 2020 SLE 0002)
- EXTERNAL EMAIL WARNING - USE CAUTION ***
ADAMS ML21075A333 To: Robert B. Elliott, NMSS From: Phyllis Clark, NMSS Date: March 17, 2021 Just wanted to let you know that the following document has been submitted into DPC for immediate release.
View ADAMS Properties ML21075A333 Open ADAMS Package (Meeting Summary: Public Scoping Meeting for the Environmental Review of the
Subsequent License Renewal Application for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (EPID No.: L 2020 SLE 0002))
Submitted into DPC on 03/17/2021 Date to be release to public: 03/17/2021 Thanks Scheera M. Whitaker Administrative Assistant NMSS/Rulemaking, Environmental &
Financial Support (REFS)
OWFN/02-C08 (301) 415-5828 Scheera.Whitaker@nrc.gov
Hearing Identifier: PointBeach_SLRDocs_Public Email Number: 6 Mail Envelope Properties (DM6PR09MB5238CBB25E6EECED516FCF2AF7699)
Subject:
FW: RE: Distribution: Meeting Summary: Public Scoping Meeting for the Environmental Review of the Subsequent License Renewal Application for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (EPID No.: L 2020 SLE 0002)
Sent Date: 3/18/2021 11:24:51 AM Received Date: 3/18/2021 11:24:55 AM From: Clark, Phyllis Created By: Phyllis.Clark@nrc.gov Recipients:
"Elliott, Robert" <Robert.Elliott@nrc.gov>
Tracking Status: None "Imboden, Stacey" <Stacey.Imboden@nrc.gov>
Tracking Status: None "Folk, Kevin" <Kevin.Folk@nrc.gov>
Tracking Status: None "Martinez, Nancy" <Nancy.Martinez@nrc.gov>
Tracking Status: None Post Office: DM6PR09MB5238.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 7848 3/18/2021 11:24:55 AM image002.png 27384 image003.jpg 1265 Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: