ML20058K749

From kanterella
Revision as of 10:45, 3 June 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRC Staff Motion for Extension of Time.* Board Has Extended Filing Time for Util Until 931230.W/Certificate of Svc. Served on 931206.Granted for Board on 931203
ML20058K749
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/02/1993
From: Hodgdon A
NRC OFFICE OF THE GENERAL COUNSEL (OGC)
To:
Atomic Safety and Licensing Board Panel
References
CON-#493-14503 OLA-2, NUDOCS 9312160024
Download: ML20058K749 (4)


Text

_ ._

December 2,1993  ;

.w ,

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION o3 g f m :24 l 1

)

BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

) ' W W ~ b &]

PACIFIC GAS & ELECT. RIC COMPANY ) Docket Nos. 50-275 OLA-2 1

) 50-323 OLA-2

)

(Diablo Canyon Nuclear Power Plant ) (Constniction Period Recovery)

Units 1 and 2) ) GRANTED  :

NRC STAFF MOTION - For the Licensing Board l FOR EXTENSION OF TTME INTRODUCTION /LA.A=

m Administrat.ive L Lse i

By Memorandum and Order of October 28,1993, the Licensing Board granted3DEC  % 93 i San Luis Obispo Mothers for Peace's (MFP) unopposed motion for an extension of time ] ;

in which to file its findings of fact and conclusions of law in this proWing, thus extending by two weeks the duc date for the findings of MFP and the Staff and the reply l findings of PG&E. By this revised schedule, MFP's findings were due November 19, l 1993, and the Staff's on December 10, 1993, with PG&E's reply findings due December 20,1993. MFP filed its findings on November 19th, as scheduled, and the I

Staff received its copy on November 22nd.

As the Licensing Board is aware, MFP's findings are 300 pages in length and 270 of those pages address documents that MFP introduced into evidence at the hearing.

The Staff has been working diligently since the close of the hearing but nevertheless will be hard pressed to file findings addressing the hundreds of documents consisting of ,

thousands of pages and MFP's findings characterizing those documents by December 10th. },

9312160024 931202 '

PDR ADOCK 05000275 C PDR  ;

4 2-MOTION Wherefore, the Staff requests the Licensing Board to extend the date for the Staff to file its findings until December 22,1993. PG&E's counsel has stated that PG&E  ;

does not object to the extension provided that its time for filing is also extended. PG&E  ;

asked the Staff to request the Board to extend its filing date until December 30,1993.

MFP's counsel has indicated that MFP has no objection to the extension.

Respectfully submitted, ,

Q

)

{

i  !

g '

, rt r1 i TTO 6 #dL Ann P. Hodgdon  :

Counsel for NRC Staff Dated at Rockville, Maryland this 2nd day of December 1993  ;

t

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of PACIFIC GAS AND ELECTRIC COMPANY Docket No.(s) 50-275/323-OLA-2 (Diablo Canyon Nuclear Power Plant, Unit Nos. I and 2)

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing LB GRANT OF STAFF MOTION 12/2 have been served upon the following persons by U.S. mail, first class, except as otherwise noted and in accordance with the requirements of 10 CFR Sec. 2.712.

Office of Commission Appellate Administrative Judge Adjudication Charles Bechhoefer, Chairman U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Board Washington, DC 20555 U.S. Nuclear Regulatory Commission Washington, DC 20555  :

Administrative Judge Administrative Judge Jerry R. Kline Frederick J. Shon Atomic Safety and Licensing Board Atomic Safety and Licensing Board ,

U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission '

Washington, DC 20555 Washington, DC 20555 Ann P. Hodgdon, Esq. C. J. Warner, Esq.

Office of the General Counsel Richard F. Locke, Esq.

U.S. Nuclear Regulatory Commission Pacific Gas & Electric Company Washington, DC 20555 77 Beale Street San Francisco, CA 94106 Robert R. Wellington, Esq. Joseph B. Knotts, Jr., Esq.

Diablo Canyon Independent Safety David A. Repka, Esq.

Committee Winston & Strawn ,

857 Cass Street, Suite D 1400 L Street, N.W.

Monterey, CA 93940 Washington, DC 20005 t

i P

,--- + -

.v

4 Docket No.(s)50-275/323-OLA-2 LB GRANT OF STAFF MOTION 12/2 l

Truman Burns Peter G. Fairchild, Esq.

Robert Kinosian California Public Utilities Commission California Public Utilities Commission 505 Van Ness Avenue 505 Van Ness, Room 4103 San Francisco, CA 94102 San Francisco, CA 94102 Nancy Culver, President Diane Curran, Esq.

Board of Directors Counsel for SLOMFP Mothers for Peace c/o IEER ,

P. O. Box 164 6935 Laurel Avenue, Suite 204 Pismo Beach, CA 93448 Takoma Park, MD 20912  ;

Dated at Rockville, Md. this f 6 day of December 1993 ,f $/


 %; ,71 ,

/

Office of the/ Secretary of the Commission f

l l

l

.