NRC Staff Motion for Extension of Time.* Requests That Board Extend Date for Staff to File Findings Until 931222. W/Certificate of Svc
ML20058K877
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 12/02/1993
From: Hodgdon A
NRC OFFICE OF THE GENERAL COUNSEL (OGC)
To:
Atomic Safety and Licensing Board Panel
References
CON-#493-14500 OLA-2, NUDOCS 9312160051
Download: ML20058K877 (4)


Text

!

M5oo December 2/n.19~

93 UNITED STATES OF AMERICA '93 DE ~2 P2 39 NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD - r In the Matter of )

~. )

PACIFIC GAS & ELECTRIC COMPANY ) Docket Nos. 50-275 OLA-2

) 50-323 OLA-2

)

(Diablo Canyon Nuclear Power Plant ) (Construction Period Recovery)

Units 1 and 2) )  ;

NRC STAFF MOTION FOR EXTENSION OF TIME INTRODUCTION By Memorandum and Order of October 28,1993, the Licensing Board granted San Luis Obispo Mothers for Peace's (MFP) unopposed motion for an extension of time in which to file its findings of fact and conclusions of law in this proceeding, thus 4

i extending by two weeks the due date for the findings of MFP and the Staff and the reply findings of PG&E. By this revised schedule, MFP's findings were due November 19, 1993, and the Staff's on December 10, 1993, with PG&E's reply findings due December 20,1993. MFP filed its findings on November 19th, as scheduled, and the Staff received its copy on November 22nd.

As the Licensing Board is aware, MFP's findings are 300 pages in length and 270 of those pages address documents that MFP introduced into evidence at the hearing.

The Staff has been working diligently since the close of the hearing but nevenheless will be hard pressed to file findings addressing the hundreds of documents consisting of thousands of pages and MFP's findings characterizing those documents by December 10th.

9312160051 931202 PDR C

ADOCK 05000275 PDR

.M 61 i

'. 1 l

MOTION Wherefore, the Staff requests the Licensing Board to extend the date for the i Staff to file its findings until December 22,1993. PG&E's counsel has stated that PG&E does not object to the extension provided that its time for filing is also extended. PG&E asked the Staff to request the Board to extend its filing date until December 30,1993.

MFP's counsel has indicated that MFP has no objection to the extension.

Res tfully submitted, iA

et n Ann P. Hodgdon i

by( n(Se Counsel for NRC Staff Dated at Rockville, Maryland this 2nd day of December 1993 F

,--__------__2-- ___ -_

. r i, UNGdD STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ,

BEFORE THE ATOMIC SAFETY AND LICENSING BOARD -

In the Matter of ) ,

) Docket Nos. 50-275 OLA-2 PACIFIC GAS & ELECTRIC COMPANY ) 50-323 OLA-2

)

(Diablo Canyon Nuclear Power Plant, ) (Constructed Period Recovery)

Units 1 and 2) )

)

CERTIFICATE OF SERVICE I hereby cenify that copies of "NRC STAFF MOTION FOR EXTENSION OF TIME"

  • in the above captioned proceeding have been served on the following by deposit in the United States mail first class or, as indicated by an asterisk, by deposit in the Nuclear Regulatory Commission's internal mail system, this 2nd day of December 1993:

Charles Bechhoefer* Office of Commission Appellate Administrative Judge Adjudication

  • Atomic Safety and Licensing Board Mail Stop: 16-G-15 OWFN Mail Stop: EW-439 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555 Washington, DC 20555 Adjudicatory File * (2)

Jerry R. Kline* Atomic Safety and Licensing Board Administrative Judge Panel 1 Atomic Safety and Licensing Board Mail Stop: EW-439 l Mail Stop: EW-439 U.S. Nuclear Regulatory Commission  ;

U.S. Nuclear Regulatory Commission Washington, DC 20555 l Washir.gton, DC 20555 Atomic Safety and Licensing Board ,

Frederick J. Shon* Panel

  • I Administrative Judge Mail Stop: EW-439 I Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Mail Stop: EW-439 Washington, DC 20555 U.S. Nuclear Regulatory Commission Washington, DC 20555

i Nancy Culver, President Office of the Secretary * (2)

San Luis Obispo Mothers for Peace Atta: Docketing and Service  ;

P.O. Box 164 Mail Stop: 16-G-15 OWFN Pismo Beach, CA 93448 U.S. Nuclear Regulatory Commission i Washington, DC 20555 Christopher J. Warner Richard F. Locke Joseph B. Knotts, Jr., Esq.

Pacific Gas & Electric Co. David A. Repka, Esq.

77 Beale Street Kathryn M. Kalowsky, Esq.

San Francisco, CA 94106 Winston & Strawn 1400 L Street, N.W.

Greg Minor Washington, DC 20005-3502 l MHB Technical Assoc. .

1723 Hamilton Avenue, Suite K Truman Burns San Jose, CA 95125 Robert Kinosian California Public Utilities Commission Diane Curran 505 Van Ness, Room 4103 IEER San Francisco, CA 94102 6935 Laurel Avenue, Suite 204 4 Takoma Park, MD 20912 A vi e c 2 (7tA Ann' P. Hodgdon Counsel for NRC Staff i

!