Letter Sequence Request |
---|
EPID:L-2023-LLA-0064, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) (Approved, Closed) |
|
|
|
---|
Category:Legal-Affidavit
MONTHYEARCNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-21-098, Supplement to Response to Request for Additional Information Regarding Application to Modify Technical Specifications Steam Generator Inspection/Repair Program Provisions and Operating License Condition 2.C.(4)2022-01-0505 January 2022 Supplement to Response to Request for Additional Information Regarding Application to Modify Technical Specifications Steam Generator Inspection/Repair Program Provisions and Operating License Condition 2.C.(4) ML21246A1172021-09-0202 September 2021 Affidavit Dated September 2, 2021, Executed by Anthony J. Schoedel ML21223A2592021-08-11011 August 2021 Affidavit - Prop Slides - Partially Closed Meeting with TVA Potential Watts Bar, Unit 2 Tube Locking LAR CNL-21-011, Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002)2021-02-25025 February 2021 Expedited Application for Approval to Use a Growth Rate Temperature Adjustment When Implementing the Generic Letter 95-05 Analysis for the (WBN TS-391-21-002) CNL-20-063, Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)2020-07-27027 July 2020 Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) CNL-19-082, License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)2019-10-10010 October 2019 License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) CNL-18-116, Response to Request for Additional Information Regarding the Application to Revise Watts Bar Nuclear Plant Unit 2 - License Condition 2.C(4) PAD4TCD (391-WBN-TS-18-03)2018-10-11011 October 2018 Response to Request for Additional Information Regarding the Application to Revise Watts Bar Nuclear Plant Unit 2 - License Condition 2.C(4) PAD4TCD (391-WBN-TS-18-03) CNL-18-103, Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041,.2018-09-0606 September 2018 Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041,. CNL-18-081, Request for Review and Approval of Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041, Revision 12018-06-22022 June 2018 Request for Review and Approval of Topical Report TVA-NPG-AWA16, TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041, Revision 1 05000390/LER-2016-0022016-05-0404 May 2016 Technical Specification Action Not Met for Inoperable Containment Isolation Valve, LER 16-002-00 for Watts Bar, Unit 1, Regarding Technical Specification Action Not Met for Inoperable Containment Isolation Valve CNL-15-263, Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Supplemental Information Related to the Onsite Regulatory Audit at Pacific Northwest National Laboratory2015-12-29029 December 2015 Application to Revise Technical Specification 4.2.1, Fuel Assemblies (WBN-TS-15-03) - Supplemental Information Related to the Onsite Regulatory Audit at Pacific Northwest National Laboratory CNL-15-204, Response to NRC Question Regarding the Revised Containment Analysis, Including Enclosure 3, WCAP-17834-NP, Revision 2, Wcobra/Trac Long Term LOCA M&E and Containment Integrity Analysis and Enclosure 4, Affidavit2015-09-21021 September 2015 Response to NRC Question Regarding the Revised Containment Analysis, Including Enclosure 3, WCAP-17834-NP, Revision 2, Wcobra/Trac Long Term LOCA M&E and Containment Integrity Analysis and Enclosure 4, Affidavit ML15265A0452015-09-18018 September 2015 Holtec International - Request for Additional Documentation for Watts Bar Dry Storage Project ML13225A0242013-08-0606 August 2013 Fuel Thermal Conductivity Degradation, Response to Supplemental Safety Evaluation Report Open Item 61 ML11341A0342011-11-30030 November 2011 Attachment 32, General Atomics-Electronics Systems Inc. Letter GA-ESI 4493, Request by General Atomics Electronic Systems, Inc. to Withhold Certain Information from Public Disclosure Under 10CFR2.390 Dated October 14, 2011.. ML1109502762011-04-0101 April 2011 Response to Large Break Loss of Coolant Accident (LBLOCA) and Over-Pressurization Request for Additional Information ML0325803962003-05-29029 May 2003 Enclosure 3 - Watts Bar, Withholding from Public Disclosure, Responses to the NRC Request for Additional Information on the RFA-2 Licensing Submittal (WBN-TS-02-13) for the Watts Bar Nuclear Plant (Proprietary) ML0222102552002-08-0707 August 2002 Letter from Brent R. Marquand to Charles Bechhoefer Requesting That Licensing Board Sign and Issue Subpoena for Sam L. Harvey, Based on Description of Intended Testimony Set Forth in Tva'S 03/29/2002 Witness List 2024-01-10
[Table view] Category:Letter type:CNL
MONTHYEARCNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-015, Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08)2023-02-27027 February 2023 Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08) CNL-23-003, Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A2023-01-30030 January 2023 Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A CNL-23-009, Response to Request for Additional Information Request to Revise Technical Specification 3.4.122023-01-0404 January 2023 Response to Request for Additional Information Request to Revise Technical Specification 3.4.12 CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-109, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-12-22022 December 2022 Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements CNL-22-101, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-012022-11-28028 November 2022 American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat2022-11-28028 November 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2022-10-31031 October 2022 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-22-098, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 552022-10-17017 October 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55 CNL-22-085, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Al2022-09-0202 September 2022 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alte CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-08-11011 August 2022 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-070, Status Regarding the Improved Flood Mitigation System Project2022-06-30030 June 2022 Status Regarding the Improved Flood Mitigation System Project CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-22-068, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-06-0808 June 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-047, Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2022-05-23023 May 2022 Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-22-043, Response to Request for Additional Information and Confirmation of Information Regarding Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board.2022-05-0202 May 2022 Response to Request for Additional Information and Confirmation of Information Regarding Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board. CNL-22-046, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan.2022-04-28028 April 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan. 2024-01-09
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARCNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-23-015, Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08)2023-02-27027 February 2023 Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08) CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-001, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-04-0404 April 2022 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-003, Application to Modify the Allowable Value for Watts Bar Nuclear Plant, Unit 1 Technical Specification Table 3.3.2-1, Function 6.e(1) (WBN-TS-21-010)2022-02-17017 February 2022 Application to Modify the Allowable Value for Watts Bar Nuclear Plant, Unit 1 Technical Specification Table 3.3.2-1, Function 6.e(1) (WBN-TS-21-010) CNL-21-018, Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance .2021-12-0909 December 2021 Application to Adopt TSTF-205-A, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance . CNL-21-062, Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board Cleaning (WBN-TS-19-019)2021-09-29029 September 2021 Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board Cleaning (WBN-TS-19-019) ML21202A2242021-07-0202 July 2021 Tennessee Valley Authority (TVA)- Watts Bar Nuclear Plant (WBN)- NPDES Permit No. TN0020168-Application Request for Permit Renewal CNL-21-038, Application to Revise the Measurement Units for the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for the Containment Vent Isolation Instrumentation and Control Room Emergency Ventilation System Radiation Monitors (W2021-06-0101 June 2021 Application to Revise the Measurement Units for the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for the Containment Vent Isolation Instrumentation and Control Room Emergency Ventilation System Radiation Monitors (WBN CNL-21-045, Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN82021-04-29029 April 2021 Bellefonte Nuclear Plant, Units 1 and 2; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Clinch River Nuclear Site; Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Nuclear Quality Assurance Plan, TVA-NQA-PLN89- CNL-21-013, Application to Modify Technical Specifications Steam Generator Inspection/Repair Program Provisions and Unit 2 Facility Operating License Condition 2.C.(4) (WBN-TS-20-06)2021-03-11011 March 2021 Application to Modify Technical Specifications Steam Generator Inspection/Repair Program Provisions and Unit 2 Facility Operating License Condition 2.C.(4) (WBN-TS-20-06) CNL-21-015, Expedited Application to Modify Watts Bar Nuclear Plant, Unit 1 Technical Specification 3.7.12, Auxiliary Building Gas Treatment System, for One-Time Exception to Permit Opening of the Auxiliary Building Secondary Containment Enclosure as2021-03-0303 March 2021 Expedited Application to Modify Watts Bar Nuclear Plant, Unit 1 Technical Specification 3.7.12, Auxiliary Building Gas Treatment System, for One-Time Exception to Permit Opening of the Auxiliary Building Secondary Containment Enclosure as N CNL-21-016, License Amendment Request to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level to Accommodate the Replacement Steam Generators (WBN-TS-20-05)2021-03-0202 March 2021 License Amendment Request to Revise Technical Specifications to Change the Steam Generator Secondary Side Water Level to Accommodate the Replacement Steam Generators (WBN-TS-20-05) CNL-21-010, Correction of Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology (WBN-TS-19-04) (EPID2021-01-26026 January 2021 Correction of Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology (WBN-TS-19-04) (EPID L CNL-20-104, Expedited Application for Approval to Use an Alternate Method of Determining Probability of Detection for (WBN TS-391-20-024)2020-12-23023 December 2020 Expedited Application for Approval to Use an Alternate Method of Determining Probability of Detection for (WBN TS-391-20-024) CNL-20-093, Supplement to Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 'Containment Leakage Rate Testing Program' (WBN-TS-19-01)2020-12-15015 December 2020 Supplement to Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 'Containment Leakage Rate Testing Program' (WBN-TS-19-01) CNL-20-087, Non-Voluntary Application to Modify Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications Surveillance Requirement 3.6.15.4, Shield Building, (WBN-TS-20-017)2020-12-15015 December 2020 Non-Voluntary Application to Modify Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications Surveillance Requirement 3.6.15.4, Shield Building, (WBN-TS-20-017) CNL-20-078, Supplement to Application to Revise Watts Bar Nuclear Plant (Wbn), Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency and to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sa2020-10-13013 October 2020 Supplement to Application to Revise Watts Bar Nuclear Plant (Wbn), Unit 1 Technical Specifications for Steam Generator Tube Inspection Frequency and to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Samp CNL-20-006, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 Containment Leakage Rate Testing Program (WBN-TS-19-01)2020-10-0202 October 2020 Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications 5.7.2.19 Containment Leakage Rate Testing Program (WBN-TS-19-01) CNL-20-058, Tennessee Valley Authority, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Function 6.e of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation (WBN-TS-19-27)2020-08-27027 August 2020 Tennessee Valley Authority, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Function 6.e of Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation (WBN-TS-19-27) CNL-20-041, License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016)2020-08-14014 August 2020 License Amendment Request to Remove Licensee Control (BFN TS-527, SQN-TS-20-08, and WBN-TS-20-016) CNL-20-047, Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance2020-07-31031 July 2020 Brown Ferry Nuclear Plant, Sequoyah Nuclear Plant & Watts Bar Nuclear Plant - Tennessee Valley Authority License Amendment Request to Revise Radiological Emergency Plan Regarding On-shift Emergency Medical Technician and Onsite Ambulance Re CNL-20-063, Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06)2020-07-27027 July 2020 Supplement to License Amendment Request for Measurement Uncertainty Recapture Power Uprate (WBN-TS-19-06) CNL-20-053, Application to Revise Watts Bar Nuclear Plant, Unit 1, Technical Specifications for Steam Generator Tube Inspection Frequency & to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection, (WBN-392020-07-17017 July 2020 Application to Revise Watts Bar Nuclear Plant, Unit 1, Technical Specifications for Steam Generator Tube Inspection Frequency & to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies & Tube Sample Selection, (WBN-390- CNL-20-040, License Amendment Request to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec (WBN-TS-20-07)2020-07-17017 July 2020 License Amendment Request to Adopt TSTF-490, Deletion of E Bar Definition and Revision to RCS Specific Activity Tech Spec (WBN-TS-20-07) CNL-20-016, Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23)2020-06-22022 June 2020 Application to Modify Watts Bar Nuclear Plant Unit 1 Technical Specifications 3.3.3, Post Accident Monitoring Instrumentation, (WBN-TS-19-23) CNL-20-012, Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-18-16)2020-05-19019 May 2020 Application to Modify the Watts Bar Nuclear Plant Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-18-16) CNL-20-005, License Amendment Request to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position, (WBN-TS-20-02)2020-04-0303 April 2020 License Amendment Request to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position, (WBN-TS-20-02) CNL-19-115, Non-Voluntary License Amendment Request to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specific2020-03-0202 March 2020 Non-Voluntary License Amendment Request to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications 3.2.1, Fq(Z), to Implement Methodology from WCAP-17661, Revision 1, Improved RAOC and CAOC Fq Surveillance Technical Specificat CNL-19-084, Second Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program...2020-01-17017 January 2020 Second Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program... CNL-19-051, Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology2020-01-17017 January 2020 Application to Implement the Full Spectrum LOCA (Fsloca) Methodology for Loss-of-Coolant Accident (LOCA) Analysis and New LOCA-specific Tritium Producing Burnable Absorber Rod Stress Analysis Methodology CNL-20-004, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01)2020-01-17017 January 2020 Units 1 and 2, License Amendment Request to Revise Technical Specification 3.3.5, LOP DG Start Instrumentation, (WBN-TS-20-01) CNL-19-110, Application to Revise Technical Specifications 3.8.1, AC Sources - Operating (WBN-TS-18-10)2019-12-17017 December 2019 Application to Revise Technical Specifications 3.8.1, AC Sources - Operating (WBN-TS-18-10) CNL-19-077, Application to Modify Watts Bar Nuclear Plant (WBN) Unit 1 and Unit 2 Technical Specifications 3.6.15, Shield Building, (WBN-TS-19-10)2019-12-0606 December 2019 Application to Modify Watts Bar Nuclear Plant (WBN) Unit 1 and Unit 2 Technical Specifications 3.6.15, Shield Building, (WBN-TS-19-10) CNL-19-067, Application to Revise Watts Bar Nuclear Plant (WBN) Unit 2 - Technical Specifications for Steam Generator Tube Repair Sleeve (WBN-TS-391-19-13)2019-09-30030 September 2019 Application to Revise Watts Bar Nuclear Plant (WBN) Unit 2 - Technical Specifications for Steam Generator Tube Repair Sleeve (WBN-TS-391-19-13) CNL-19-060, Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14)2019-08-29029 August 2019 Supplement to Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (WBN-TS-18-14) CNL-19-038, License Amendment Request to Make Miscellaneous Administrative Changes (WBN-TS-19-02)2019-06-0707 June 2019 License Amendment Request to Make Miscellaneous Administrative Changes (WBN-TS-19-02) CNL-19-014, Application to Modify Watts Bar Nuclear Plant Unit 2 Technical Specifications 3.7.8 to Extend the Completion Time for an Inoperable Essential Raw Cooling Water Train on a One-Time Basis (WBN-TS-18-07)2019-02-0707 February 2019 Application to Modify Watts Bar Nuclear Plant Unit 2 Technical Specifications 3.7.8 to Extend the Completion Time for an Inoperable Essential Raw Cooling Water Train on a One-Time Basis (WBN-TS-18-07) CNL-18-118, Application to Revise Technical Specifications Regarding DC Electrical Systems TStf-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 (WBN-TS-18-09)2018-11-29029 November 2018 Application to Revise Technical Specifications Regarding DC Electrical Systems TStf-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 (WBN-TS-18-09) CNL-18-068, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (WBN-TS-17-24)2018-11-29029 November 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (WBN-TS-17-24) CNL-18-119, Application to Revise Watt Bar Nuclear Plant, Units 1 & 2, Technical Specifications 3.8.1, 3.8.7, 3.8.8, and 3.8.9, Regarding Electrical Power Systems (WBN-TS-1808)2018-11-26026 November 2018 Application to Revise Watt Bar Nuclear Plant, Units 1 & 2, Technical Specifications 3.8.1, 3.8.7, 3.8.8, and 3.8.9, Regarding Electrical Power Systems (WBN-TS-1808) CNL-18-130, Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays2018-11-19019 November 2018 Revised Application to Modify the Technical Specifications for Unbalanced Voltage Relays 2023-09-20
[Table view] |
Text
Proprietary Information - Withhold Under 10 CFR § 2.390 This letter is decontrolled when separated from Enclosure 2 1101 Market Street, Chattanooga, Tennessee 37402 CNL-23-043 May 4, 2023 10 CFR 50.90 10 CFR 50.91 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 0001 Watts Bar Nuclear Plant, Unit 1 Facility Operating License No. NPF-90 NRC Docket Nos. 50-390
Subject:
Watts Bar Nuclear Plant, Unit 1 - Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, MODES (WBN-TS-23-09)
In accordance with the provisions of Title 10 of the Code of Federal Regulations (10 CFR) 50.90, Application for amendment of license, construction permit, or early site permit, and 10 CFR 50.91, Notice for public comment; State consultation, Tennessee Valley Authority (TVA) is submitting a request for a one-time amendment to Facility Operating License No. NPF-90 for the Watts Bar Nuclear Plant (WBN), Unit 1. The proposed change is being requested on an emergency basis pursuant to 10 CFR 50.91(a)(5).
This proposed emergency license amendment request (LAR) revises WBN Unit 1 Technical Specification (TS) Table 1.1-1, MODES, footnotes (b) and (c), to allow completion of the current WBN Unit 1 Cycle 18 refueling outage (U1R18) and transition to Cycle 19 operation and the subsequent Unit 1 Cycle 19 refueling outage (fall 2024) with the required reactor pressure vessel head closure bolts studs fully tensioned. The required number of head closure bolts is at least 53 of 54 bolts (stud 34 has been removed from service). to this submittal provides a description and technical evaluation of the proposed change, a regulatory evaluation, and a discussion of environmental considerations. to Enclosure 1 provides the existing WBN Unit 1 TS page marked up to show the proposed change. Attachment 2 to Enclosure 1 provides the proposed WBN Unit 1 TS page retyped to show the change incorporated. There are no associated TS Bases pages for this request.
Proprietary Information - Withhold Under 10 CFR § 2.390 This letter is decontrolled when separated from Enclosure 2
Proprietary Information - Withhold Under 10 CFR § 2.390 This letter is decontrolled when separated from Enclosure 2 U.S. Nuclear Regulatory Commission CNL-23-043 Page 2 May 4, 2023 TVA is requesting approval of the proposed amendment on an emergency basis pursuant to 10 CFR 50.91(a)(5) and is requesting approval by 0700 Eastern Daylight Time (EDT) on May 6, 2023, in order to support the currently planned startup from U1R18. WBN Unit 1 is currently in Mode 6 and will not transition to Mode 5 until this emergency license amendment request is approved. Therefore, Nuclear Regulatory Commission (NRC) approval of this LAR is needed on an emergency basis so as not to adversely impact the current outage schedule and startup for WBN Unit 1 Cycle 19. An explanation of the emergency and why it could not be avoided is included in Enclosure 1.
In support of the technical evaluation in Enclosure 1, Enclosure 2 contains Westinghouse Electric Company LLC (Westinghouse) WCAP-18774-P, Revision 1, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173" P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out of Service for 40 Years for Watts Bar Units 1 and 2. Enclosure 2 contains information that Westinghouse considers to be proprietary in nature pursuant to 10 CFR 2.390, "Public inspections, exemptions, requests for withholding," paragraph (a)(4). Due to the emergent nature of this proposed amendment, Enclosure 2 is submitted as a proprietary document in its entirety.
TVA will submit a revision of Enclosure 2 with revised proprietary markings and an associated non-proprietary version within 30 days following NRC approval of this amendment request. provides the Westinghouse Application for Withholding Proprietary Information from Public Disclosure CAW-23-017 affidavit supporting this proprietary withholding request.
The affidavit sets forth the basis on which the information may be withheld from public disclosure by the NRC and addresses with specificity the considerations listed in paragraph (b)(4) of Section 2.390. Accordingly, TVA requests that the information, which is proprietary to Westinghouse, be withheld from public disclosure in accordance with 10 CFR 2.390. Correspondence with respect to the copyright or proprietary aspects of the items listed above or the supporting Westinghouse affidavit should reference CAW-23-017 and should be addressed to Camille T. Zozula, Manager, Regulatory Compliance &
Corporate Licensing.
TVA has determined that there are no significant hazards considerations associated with the proposed change and that the TS change qualifies for a categorical exclusion from environmental review pursuant to the provisions of 10 CFR 51.22(c)(9). In accordance with 10 CFR 50.91(b)(1), TVA is sending a copy of this letter and enclosure to the Tennessee State Department of Environment and Conservation.
There are no new regulatory commitments contained in this letter. Please address any questions regarding this request to Stuart L. Rymer, Senior Manager, Fleet Licensing, at slrymer@tva.gov.
Proprietary Information - Withhold Under 10 CFR § 2.390 This letter is decontrolled when separated from Enclosure 2
Proprietary Information - Withhold Under 10 CFR § 2.390 This letter is decontrolled when separated from Enclosure 2 U.S. Nuclear Regulatory Commission CNL-23-043 Page 3 May 4, 2023 I declare under penalty of perjury that the foregoing is true and correct. Executed on this 4th day of May 2023.
Respectfully, Digitally signed by Edmondson, Carla Date: 2023.05.04 20:06:42 -04'00' Kimberly D. Hulvey Director, Nuclear Regulatory Affairs
Enclosures:
- 1. Evaluation of Proposed Change
- 2. WCAP-18774-P, Revision 1 (Proprietary)
- 3. Westinghouse Electric Company LLC Application for Withholding Proprietary Information from Public Disclosure (Affidavit CAW-23-017) cc (Enclosures):
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Watts Bar Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant Director, Division of Radiological Health - Tennessee State Department of Environment and Conservation Proprietary Information - Withhold Under 10 CFR § 2.390 This letter is decontrolled when separated from Enclosure 2
Enclosure 1 Evaluation of the Proposed Change
Subject:
Watts Bar Nuclear Plant, Unit 1 - Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, MODES (WBN-TS-23-09)
CONTENTS 1.0
SUMMARY
DESCRIPTION ............................................................................................... 1 2.0 DETAILED DESCRIPTION ................................................................................................ 1 2.1 System Design and Operation ........................................................................................ 1 2.2 Circumstances Establishing Need for the Proposed Emergency Amendment ............... 2 2.3 Description of the Proposed Change .............................................................................. 4
3.0 TECHNICAL EVALUATION
............................................................................................... 5
4.0 REGULATORY EVALUATION
........................................................................................... 5 4.1 Applicable Regulatory Requirements and Criteria .......................................................... 5 4.2 Precedent ....................................................................................................................... 6 4.3 No Significant Hazards Consideration ............................................................................ 6 4.4 Conclusion ...................................................................................................................... 8
5.0 ENVIRONMENTAL CONSIDERATION
............................................................................. 8 Attachments:
- 1. Proposed TS Change (Markup) for WBN Unit 1
- 2. Proposed TS Change (Final Typed) for WBN Unit 1 CNL-23-043
Enclosure 1 Evaluation of the Proposed Change 1.0
SUMMARY
DESCRIPTION In accordance with the provisions of Title 10 of the Code of Federal Regulations (10 CFR) 50.90, Application for amendment of license, construction permit, or early site permit, and 10 CFR 50.91, Notice for public comment; State consultation, Tennessee Valley Authority (TVA) is submitting a request for a one-time amendment to Facility Operating License No. NPF-90 for the Watts Bar Nuclear Plant (WBN), Unit 1. The proposed change is being requested on an emergency basis pursuant to 10 CFR 50.91(a)(5).
This proposed emergency license amendment request (LAR) revises WBN Unit 1 Technical Specification (TS) Table 1.1-1, MODES, footnotes (b) and (c), to allow completion of the current WBN Unit 1 Cycle 18 refueling outage (U1R18), through Cycle 19, and prior to Cycle 20 operation, with 53 of 54 Reactor vessel head closure bolts fully tensioned due to stud #34 being removed, as described in Section 2.3 to this enclosure. This one-time amendment change will apply for operation of WBN Unit 1 for Cycle 19, including any emergent unit shutdowns and restarts. This one-time allowance will end following the Unit 1 Cycle 19 refueling outage prior to Cycle 20 operation at which time either a permanent amendment change will be required or stud #34 has been reinstalled and fully tensioned to permit Cycle 20 operation.
TVA is requesting approval of the proposed amendment on an emergency basis pursuant to 10 CFR 50.91(a)(5). WBN Unit 1 is currently in Mode 6 and will not transition to Mode 5 until this emergency license amendment request is approved. Therefore, NRC approval of this LAR is needed on an emergency basis so as not to adversely impact the current outage schedule and startup for WBN Unit 1 Cycle 19. An explanation of the emergency and why it could not be avoided is provided in Section 2.2 to this enclosure.
2.0 DETAILED DESCRIPTION 2.1 System Design and Operation The WBN Unit 1 reactor vessel was designed and fabricated in accordance with the requirements of American Society of Mechanical Engineers (ASME)Section III 1971 Edition through Winter 1971 Addenda with the following addition:
Closure studs, nuts, washers, inserts, and adaptors in accordance with SA-540 class 3 Gr. B-24 as modified by Code Case 1605.
The reactor pressure vessel is American Nuclear Society (ANS) Safety Class 1 and the pressure boundary meets the requirements of the ASME Boiler and Pressure Vessel Code,Section III, Subsection NB. This equipment is evaluated for the loading combinations outlined in Table 5.2-4 of the Updated Final Safety Analysis Report (UFSAR). The equipment is analyzed for (1) the normal loads of deadweight, pressure, and thermal, (2) mechanical transients of operating basis earthquake, safe shutdown earthquake, and pipe ruptures, and (3) pressure and temperature transients outlined in WBN UFSAR Section 5.2.1.5. The reactor pressure vessel is described in WBN UFSAR Section 5.4.2.
The reactor vessel is cylindrical with a welded hemispherical bottom head and a removable, bolted, flanged, and gasketed, hemispherical upper head. The reactor vessel flange and head are sealed by two metallic O-rings and are secured by the reactor vessel head closure studs.
CNL-23-043 E1-1 of 8
Enclosure 1 There are a total of 54 locations for the studs to be installed around the circumference of the reactor vessel head. To ensure full engagement of the O-rings, a minimum of 53 of the 54 studs are required to be fully tensioned. The nuts on the studs are tightened with a stud tensioner.
Seal leakage is detected by means of two leakoff communications: one between the inner and outer reactor vessel flange O-rings and one outside the outer reactor vessel flange O-ring. The temperature in the leakoff line from the reactor vessel flange O-ring seal leakage monitor connections is indicated. An increase in temperature above ambient is an indication of O-ring seal leakage. High temperature actuates an alarm in the Main Control Room. The reactor vessel head flange leakage detection is described in WBN UFSAR Sections 5.4.2 and 5.4.6 which provide assurance that leakage would be collected and analyzed in the event of untensioned stud leakage. Additionally, the WBN reactor coolant leakage detection system (see WBN Unit 1 TS 3.4.13, RCS Operational LEAKAGE) conforms to the guidance in Regulatory Guide 1.45, "Reactor Coolant Pressure Boundary Leakage Detection Systems."
As required by ASME Code Section XI, a leakage test is performed on the primary side following reactor reassembly each refueling outage. During this test, the pressure is raised to 2280 pounds per square gauge (psig) with the system temperature above the minimum temperature imposed by reactor vessel material ductility requirements while the system is checked for leaks.
TVA procedures provide the methodology for tensioning the reactor pressure vessel closure studs. Three tensioners are provided and are applied simultaneously to three studs located 120 degrees apart. A single hydraulic pumping unit operates the tensioners, which are hydraulically connected. The studs are tensioned to their operational load in two steps to prevent high stresses in the flange region and unequal loadings in the studs.
2.2 Circumstances Establishing Need for the Proposed Emergency Amendment Regulation 10 CFR 50.91, "Notice for public comment; State consultation," paragraph (a)(5) states that where the NRC finds that an emergency situation exists, in that failure to act in a timely way would result in the derate or shutdown of a nuclear power plant, it may issue a license amendment involving no significant hazards consideration without prior notice and opportunity for a hearing or public comment. The regulation requires that a licensee requesting an emergency amendment explain why the emergency situation occurred and why the licensee could not avoid the situation.
During the Unit 1 Cycle 16 refueling outage (U1R16) in May 2020, when removing the reactor vessel studs after de-tensioning, difficulty was encountered while attempting to remove the reactor vessel closure stud at Location #34. The stud was eventually removed, but visual inspection of the stud determined there was damage to the lower portion of the threads. The stud threads were subsequently inspected, repaired, and cleaned. However, the threads in the
- 34 stud hole were not inspected prior to the off load of the Unit 1 core.
During a typical refueling outage, the studs are removed from the cavity to ensure the studs do not come in contact with borated water. The stud holes are covered so that the holes are protected from the borated water when the cavity is flooded up. During U1R16, because the stud holes were not inspected once stud #34 was found damaged, the stud holes could not be inspected until after the core was reloaded, the head placed back on the vessel, and the cavity drained. This meant that the threads at stud hole #34 could not be inspected until the end of the outage at which point it was determined that the threads were potentially damaged to the point CNL-23-043 E1-2 of 8
Enclosure 1 that significant planning, effort, and mobilization would be required to repair the stud hole.
Therefore, stud #34 was removed from service.
The review of the stud hole #34 non-conformance was evaluated under the provision of 10 CFR 50.59 and determined that a revision to WBN UFSAR Table 5.4-1, Reactor Vessel Design Parameters, could be made to reflect that only 53 of the 54 studs are required to be installed and tensioned and that this UFSAR revision did not require prior NRC approval. This evaluation also determined that a TS change was not required because TVA believed that the intent of the footnotes (b) and (c) to WBN Unit 1 TS Table 1.1-1 was still being satisfied and that no changes were needed to WBN Unit 1 TS 3.4.3 RCS Pressure and Temperature (P/T)
Limits and TS 3.4.12 Cold Overpressure Mitigation System (COMS), because the reactor vessel studs are not modeled in the supporting analyses. This evaluation was also supported by a Westinghouse analysis that concluded that functionality of 53 of the 54 studs is acceptable (see Enclosure 2).
During the U1R18 outage, while preparations were being made to transition from Mode 5 to Mode 4, the NRC challenged TVA compliance with footnotes (b) and (c) to WBN Unit 1 TS Table 1.1-1. Specifically, the NRC expressed that the term all in these footnotes applies to the originally licensed 54 reactor vessel head closure bolts in the WBN UFSAR and that operation with less than 54 bolts requires a change to the TS. Therefore, based on this more recent view of TS Table 1.1-1, TVA has concluded that a change to the Technical Specification definitions for Mode 4, Mode 5, and Mode 6 is appropriate to better define the meaning of all in Table 1.1-1 to reflect the current WBN 1 Unit configuration. Subsequently, on May 3, 2023, TVA transitioned WBN Unit 1 from Mode 5 back to Mode 6 pending the review and approval of this emergency LAR. This event has been entered into the sites corrective action program.
TVA has been operating under the basis that the 10 CFR 50.59 change was acceptable and that the UFSAR change did not require prior NRC approval nor a change to the TS. Therefore, TVA could not have reasonably anticipated the need for an emergency license amendment in advance of the event or in a more timely manner in order to restore TS compliance for continued operation of WBN Unit 1. Furthermore, as demonstrated in Section 4.3, the proposed change does not involve a significant hazards consideration.
Based on the above, the requirements for an emergency situation as stipulated in 10 CFR 50.91(a)(5) have been satisfied.
CNL-23-043 E1-3 of 8
Enclosure 1 2.3 Description of the Proposed Change The emergency LAR proposes the following change to WBN Unit 1 TS Table 1.1-1:
Table 1.1-1 (page 1 of 1)
MODES REACTIVITY AVERAGE
% RATED CONDITION REACTOR COOLANT MODE TITLE THERMAL (keff) TEMPERATURE POWER (a)
(F) 1 Power Operation 0.99 >5 NA 2 Startup 0.99 5 NA 3 Hot Standby < 0.99 NA 350 4 Hot Shutdown (b) < 0.99 NA 350 > Tavg > 200 5 Cold Shutdown (b) < 0.99 NA 200 6 Refueling (c) NA NA NA (a) Excluding decay heat.
(b) For transitioning from the Unit 1 Cycle 18 refueling outage, through Cycle 19, and prior to Cycle 20 operation, Aall required reactor vessel head closure bolts fully tensioned.
The required number of head closure bolts is at least 53 of 54 bolts (stud 34 has been removed from service).
(c) For transitioning from the Unit 1 Cycle 18 refueling outage, through Cycle 19, and prior to Cycle 20 operation, Oone or more required reactor vessel head closure bolts less than fully tensioned. The required number of head closure bolts is at least 53 of 54 bolts (stud 34 has been removed from service). to Enclosure 1 provides the existing WBN Unit 1 TS page marked up to show the proposed change. Attachment 2 to Enclosure 1 provides the proposed WBN Unit 1 TS page retyped to show the change incorporated. There are no associated TS Bases pages for this request.
As noted above, the proposed changes to WBN Unit 1 Table 1.1-1 are temporary to allow WBN Unit 1 to start-up from the U1R18 refueling outage, through Cycle 19, and prior to Cycle 20 operation, with 53 of 54 Reactor vessel head closure bolts fully tensioned due to stud #34 being removed. This one-time amendment change will apply for operation of WBN Unit 1 for Cycle 19, including any emergent unit shutdowns and restarts. This one-time allowance will end following Unit 1 Cycle 19 refueling outage prior to Cycle 20 operation at which time either a permanent amendment change will be required or stud #34 has been reinstalled and fully tensioned to permit Cycle 20 operation.
CNL-23-043 E1-4 of 8
Enclosure 1 Following NRC approval of this emergency LAR, TVA plans to submit a LAR to permanently change WBN Unit 1 Table 1.1--1 to allow continued operation with only the required reactor vessel head closure bolts fully tensioned in order to support future WBN Unit 1 operation.
3.0 TECHNICAL EVALUATION
contains Westinghouse Electric Company LLC (Westinghouse) WCAP-18774-P, Revision 1, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173" P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out of Service for 40 Years for Watts Bar Units 1 and 2, which supports continued operation of WBN Unit 1 with 53 of 54 reactor vessel head closure bolts fully tensioned.
Section 5.1.4 of Enclosure 2 specifically addresses thread engagement.
As noted in Enclosure 2, the maximum stresses in the adjacent studs, the bearing stress in the closure head flange, and the sealing of the reactor vessel O-rings remain acceptable when one stud is left out of service during reactor operation. All of the stress intensities still satisfy the applicable limits of Section III of the 1971 Edition of the ASME Code with Addenda through Winter 1971, which is the construction Code used to design the Watts Bar Unit 1 and Unit 2 reactor vessels. The cumulative usage factor (CUF) less than 1.0 for the studs adjacent to the out-of-service stud permits the plant to operate for the remainder of the 40-year design life with one stud out of service to allow adequate time for contingencies regarding stud hole repair preparation and implementation.
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory Requirements and Criteria General Design Criteria (GDC)
WBN Units 1 and 2 were designed to meet the intent of the "Proposed General Design Criteria for Nuclear Power Plant Construction Permits" published in July 1967. The WBN construction permit was issued in January 1973. The WBN updated Final Safety Analysis Report (UFSAR),
however, addresses the GDC published as Appendix A to 10 CFR 50 in July 1971.
Conformance with the GDCs is described in Section 3.1.2 of the UFSAR.
Each criterion listed below is followed by a discussion of the design features and procedures that meet the intent of the criteria. Any exception to the 1971 GDC resulting from the earlier commitments is identified in the discussion of the corresponding criterion.
Criterion 14 - Reactor Coolant Pressure Boundary. The reactor coolant pressure boundary shall be designed, fabricated, erected, and tested so as to have an extremely low probability of abnormal leakage or rapidly propagating failure and of gross rupture.
Criterion 30 - Quality of reactor coolant pressure boundary, Components which are part of the reactor coolant pressure boundary shall be designed, fabricated, erected, and tested to the highest quality standards practical. Means shall be provided for detecting and, to the extent practical, identifying the location of the source of reactor coolant leakage.
Compliance with GDCs 14 and 30 are described in Section 3.1.2 of the WBN UFSAR.
CNL-23-043 E1-5 of 8
Enclosure 1 With the implementation of the proposed changes, WBN Unit 1 continues to meet the applicable regulations and requirements, subject to the previously approved exceptions.
4.2 Precedent The proposed changes are similar to NRC-approved license amendment issued to:
Braidwood Station Units 1 and 2 and Byron Station Units 1 and 2 on October 28, 2015, in Amendment Nos. 186 and 192, respectively (ML15232A441). These amendments approved the use of the methodology for developing the pressure and temperature limits reports and changed TS Table 1.1-1, MODES, footnote (b) to state: All required reactor vessel head closure bolts fully tensioned and footnote (c) to state: One or more required reactor vessel head closure bolts less than fully tensioned (emphasis added). The proposed emergency license amendment request for WBN Unit 1 is not requesting changes to the pressure and temperature limits methodology.
Callaway Plant Unit 1 on May 28, 1999, in Amendment No. 133 (ML021640446).
Amendment No. 133 converted the current TSs to the improved TSs. The amendment approved changes to TS Table 1.1-1 based on an NRC Safety Evaluation issued on May 26, 1988 (ML20155J379 and ML20155J490) associated with the operation of the Callaway Plant with stud #2 untensioned. Amendment No. 133 revised footnote (b) to state:
At least 53 of 54 reactor vessel head closure bolts fully tensioned and footnote (c) to state:
Two or more reactor vessel head closure bolts less than fully tensioned.
The approved TS changes are similar to the changes proposed in this emergency LAR.
4.3 No Significant Hazards Consideration Tennessee Valley Authority (TVA) is requesting an emergency license amendment request (LAR) to Facility Operating License No. NPF-90 for Watts Bar Nuclear Plant (WBN) Unit 1. The proposed change is being requested on an emergency basis pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.91(a)(5).
This proposed emergency LAR revises WBN Unit 1 Technical Specification (TS) Table 1.1-1, MODES, footnotes (b) and (c), to allow completion of the current WBN Unit 1 Cycle 18 refueling outage (U1R18), through Cycle 19, and prior to Cycle 20 operation with the required reactor pressure vessel head closure studs fully tensioned (i.e., 53 of 54).
TVA is requesting approval of the proposed amendment on an emergency basis pursuant to 10 CFR 50.91(a)(5). The TS change will provide a one-time allowance that will be in effect until Mode 4 is entered from Mode 6 during the Unit 1 Cycle 19 refueling outage (fall 2024).
Westinghouse WCAP-18774-P, Revision 1, provides the technical evaluation in support of this proposed change.
TVA has evaluated whether or not a significant hazards consideration is involved with the proposed amendments by focusing on the three standards set forth in 10 CFR 50.92, Issuance of amendment, as discussed below:
- 1. Does the proposed amendment involve a significant increase in the probability or consequence of an accident previously evaluated?
Response: No CNL-23-043 E1-6 of 8
Enclosure 1 Overall protection system performance will remain within the bounds of the accident analyses because no hardware changes are proposed. Because the stresses remain within ASME Code allowables, the proposed change will not affect the probability of any event initiators. Nor will the proposed change affect the ability of any safety related equipment to perform its intended function. There will be no degradation in the performance of nor an increase in the number of challenges imposed on safety related equipment assumed to function during an accident situation.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response: No.
There are no hardware changes nor are there any changes in the method by which any safety related plant system performs its safety function. The method of plant operation is unaffected. Leakage would be precluded because adequate compression remains.
Analysis demonstrates that any gap opening remains less than the springback recovery of the inner closure O-ring. Because stresses remain within ASME Code allowables, no new accident scenarios, transient precursors, failure mechanisms, or limiting single failures are introduced as a result of this change.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
- 3. Does the proposed amendment involve a significant reduction in a margin of safety?
Response: No.
The proposed change does not affect any safety limits or controlling numerical values for a parameter established in the updated final safety analysis report or any specific values that define margin that are established in the plants licensing basis. ASME Section III stress limits for affected components are not exceeded. Plant specific evaluations indicate that the reactor vessel will continue to meet ASME Code allowable stress criteria with the required reactor pressure vessel closure studs fully tensioned. The proposed change does not alter nor exceed the acceptance criteria for any analyzed event. There will be no effect on the manner in which safety limits or limiting safety system settings are determined nor will there be any effect on those plant systems necessary to assure the accomplishment of protection functions.
Therefore, the proposed change does not involve a significant reduction in a margin of safety.
Based on the above, TVA concludes that the proposed amendment does not involve a significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of no significant hazards consideration is justified.
CNL-23-043 E1-7 of 8
Enclosure 1 4.4 Conclusion In conclusion, based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
5.0 ENVIRONMENTAL CONSIDERATION
A review has determined that the proposed amendment would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed amendment does not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluents that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.
Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
CNL-23-043 E1-8 of 8
Enclosure 1 Attachment 1 Proposed TS Changes (Mark-Ups) for WBN Unit 1 CNL-23-043
Definitions 1.1 Table 1.1-1 (page 1 of 1)
MODES
% RATED AVERAGE REACTIVITY THERMAL REACTOR COOLANT MODE TITLE CONDITION POWER (a) TEMPERATURE (keff) (°F) 1 Power Operation 0.99 >5 NA 2 Startup 0.99 <5 NA 3 Hot Standby < 0.99 NA 350 4 Hot Shutdown (b) < 0.99 NA 350 > Tavg > 200 5 Cold Shutdown (b) < 0.99 NA < 200 6 Refueling (c) NA NA NA (a) Excluding decay heat.
(b) For transitioning from the Unit 1 Cycle 18 refueling outage, through Cycle 19, and prior to Cycle 20 operation, Aall required reactor vessel head closure bolts fully tensioned. The required number of head closure bolts is at least 53 of 54 bolts (stud 34 has been removed from service).
(c) For transitioning from the Unit 1 Cycle 18 refueling outage, through Cycle 19, and prior to Cycle 20 operation, Oone or more required reactor vessel head closure bolts less than fully tensioned. The required number of head closure bolts is at least 53 of 54 bolts (stud 34 has been removed from service).
Watts Bar-Unit 1 1.1-7
Enclosure 1 Attachment 2 Proposed TS Change (Final Typed) for WBN Unit 1 CNL-23-043
Definitions 1.1 Table 1.1-1 (page 1 of 1)
MODES
% RATED AVERAGE REACTIVITY THERMAL REACTOR COOLANT MODE TITLE CONDITION POWER (a) TEMPERATURE (keff) (°F) 1 Power Operation 0.99 >5 NA 2 Startup 0.99 <5 NA 3 Hot Standby < 0.99 NA 350 4 Hot Shutdown (b) < 0.99 NA 350 > Tavg > 200 5 Cold Shutdown (b) < 0.99 NA < 200 6 Refueling (c) NA NA NA (a) Excluding decay heat.
(b) For transitioning from the Unit 1 Cycle 18 refueling outage, through Cycle 19, and prior to Cycle 20 operation, all required reactor vessel head closure bolts fully tensioned. The required number of head closure bolts is at least 53 of 54 bolts (stud 34 has been removed from service).
(c) For transitioning from the Unit 1 Cycle 18 refueling outage, through Cycle 19, and prior to Cycle 20 operation, one or more required reactor vessel head closure bolts less than fully tensioned. The required number of head closure bolts is at least 53 of 54 bolts (stud 34 has been removed from service).
Watts Bar-Unit 1 1.1-7
Proprietary Information - Withhold Under 10 CFR § 2.390 Enclosure 2 WCAP-18774-P, Revision 1 (Proprietary)
CNL-23-043 Proprietary Information - Withhold Under 10 CFR § 2.390
Enclosure 3 Westinghouse Electric Company LLC Application for Withholding Proprietary Information from Public Disclosure (Affidavit CAW-23-017)
CNL-23-043
Westinghouse Non-Proprietary Class 3 AFFIDAVIT CAW-23-017 Page 1 of 2 Commonwealth of Pennsylvania:
County of Butler:
(1) I, Zachary Harper, Senior Manager, Licensing Engineering, have been specifically delegated and authorized to apply for withholding and execute this Affidavit on behalf of Westinghouse Electric Company LLC (Westinghouse).
(2) I am requesting WCAP-18774-P, Revision 1 be withheld from public disclosure under 10 CFR 2.390.
(3) I have personal knowledge of the criteria and procedures utilized by Westinghouse in designating information as a trade secret, privileged, or as confidential commercial or financial information.
(4) Pursuant to 10 CFR 2.390, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.
(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse and is not customarily disclosed to the public.
(ii) The information sought to be withheld is being transmitted to the Commission in confidence and, to Westinghouses knowledge, is not available in public sources.
(iii) Westinghouse notes that a showing of substantial harm is no longer an applicable criterion for analyzing whether a document should be withheld from public disclosure. Nevertheless, public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar technical evaluation justifications and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
Westinghouse Non-Proprietary Class 3 AFFIDAVIT CAW-23-017 Page 2 of 2 (5) Westinghouse has policies in place to identify proprietary information. Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage (e.g., by optimization or improved marketability).
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
(d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.
(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
(f) It contains patentable ideas, for which patent protection may be desirable.
(6) The attached submittal contains proprietary information, for the reasons set forth in Sections (5) (a)-(f) of this Affidavit. The attached submittal is in support of an emergency license amendment request. A redacted version of the submittal will be filed on the docket for public disclosure within 30 days.
I declare that the averments of fact set forth in this Affidavit are true and correct to the best of my knowledge, information, and belief. I declare under penalty of perjury that the foregoing is true and correct.
Executed on: 5/4/2023 _____________________________