ML23087A297

From kanterella
Revision as of 07:19, 17 April 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Annual Assessment Meeting Presentation
ML23087A297
Person / Time
Site: Oconee, Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 04/17/2023
From:
Division Reactor Projects II
To:
References
Download: ML23087A297 (28)


Text

2022 ANNUAL ASSESSMENT CATAWBA MCGUIRE OCONEE Reactor Oversight Process Nuclear Regulatory Commission - Region II

PURPOSE Discuss licensee Address findings and Information Meeting performance in 2022 Performance Indicators with a Q&A Session

AGENDA

  • Introductions
  • Review Reactor Oversight Process
  • Annual Assessment Summary
  • Catawba Nuclear Station
  • McGuire Nuclear Station
  • Oconee Nuclear Station
  • Closing Remarks
  • NRC available for public questions

Introductions

  • Regional Personnel
  • Catawba Nuclear Station Resident Inspectors
  • Amber Donley, Ph.D. - Acting Senior Resident Inspector
  • David Rivard - Resident Inspector

Introductions

  • McGuire Nuclear Station Resident Inspectors
  • Chris Safouri- Senior Resident Inspector
  • Frank Young - Resident Inspector
  • Oconee Nuclear Station Resident Inspectors
  • Nick Smalley - Resident Inspector

NRC REACTOR OVERSIGHT PROCESS 1

NRC 2 NRC 3

4 Implemented in each Involves inspection and Executed by regional of the NRCs four assessment activities and resident inspectors regions

Reactor Oversight Framework Reactor Oversight Inputs and Oversight INCREASING SAFETY SIGNIFICANCE GREEN WHITE YELLOW RED Performance Performance within an Performance outside Related cornerstone Signals a significant Indicators expected level; expected range; objectives are being met; reduction in safety Cornerstone objectives Cornerstone objectives Minimal reduction in the margin in the area are met are still being met safety margin measured Findings Very low safety or security Low to moderate safety Substantial safety or High safety or security significance or security significance security significance significance Oversight Baseline Inspection Requires additional NRC Requires more NRC Requires most NRC oversight oversight oversight INCREASING NRC OVERSIGHT

RESIDENT INSPECTOR PROGRAM

  • Resident inspectors live in the communities they serve
  • Perform inspections at Catawba, McGuire, &

Oconee Nuclear Stations

  • Provide daily oversight of plant activities

NRC Annual Assessment Summary NRC Annual Assessment Summary CATAWBA NUCLEAR STATION Duke Energy operated the plant safely and in a manner that preserved the public health and safety and protected the environment All findings associated with Catawba Nuclear Station in 2022 were Green

Findings and Performance Indicators CATAWBA NUCLEAR STATION 3 - non-cited violations identified in 2022 2 - Green 1 - traditional enforcement All Performance Indicators were Green

NRC Annual Assessment Summary CATAWBA NUCLEAR STATION Catawba Units 1 and 2 remained in the Licensee Response Column of the NRCs ROP Action Matrix for the last quarter of 2022 NRC plans to conduct routine baseline inspections at the Catawba Nuclear Station for 2023

QUESTIONS?

NRC Annual Assessment Summary NRC Annual Assessment Summary MCGUIRE NUCLEAR STATION

  • Duke Energy operated the plant safely and in a manner that preserved the public health and safety and protected the environment
  • All findings associated with McGuire Nuclear Station in 2022 were Green

Findings and Performance Indicators MCGUIRE NUCLEAR STATION

  • 4 - Green non-cited violations identified in 2022
  • All Performance Indicators were Green

NRC Annual Assessment Summary MCGUIRE NUCLEAR STATION

  • McGuire Units 1 and 2 remained in the Licensee Response Column of the NRCs ROP Action Matrix for the last quarter of 2022
  • NRC plans to conduct routine baseline inspections at the McGuire Nuclear Station for 2023

QUESTIONS?

NRC Annual Assessment Summary NRC Annual Assessment Summary OCONEE NUCLEAR STATION

  • Duke Energy operated the plant safely and in a manner that preserved the public health and safety and protected the environment
  • All findings associated with Oconee Nuclear Station in 2022 were Green

Findings and Performance Indicators OCONEE NUCLEAR STATION

  • 14 - non-cited violations identified in 2022 13 - Green 1 - traditional enforcement
  • All Performance Indicators were Green

NRC Annual Assessment Summary OCONEE NUCLEAR STATION

  • Oconee Units 1, 2, and 3 remained in the Licensee Response Column of the NRCs ROP Action Matrix for the last quarter of 2022
  • NRC plans to conduct routine baseline inspections at the Oconee Nuclear Station for 2023

QUESTIONS?

CONTACT THE NRC Web: https://www.nrc.gov Report an Emergency - 301-816-5100 Safety Concern or Allegations 800-695-7403 l allegation@nrc.gov Questions/Information - OPA2.Resource@nrc.gov or 404-997-4417

CONTACT THE RESIDENT INSPECTORS Catawba NRC resident inspectors

  • Phone (404) 997-5134
  • Phone (404) 997-5131 McGuire NRC resident inspectors
  • Phone (404) 997-5171
  • Phone (404) 997-5173 Oconee NRC resident inspectors
  • Phone (404) 997-5211
  • Phone (404) 997-5213
  • Phone (404) 997-5214

NRC ON SOCIAL MEDIA Twitter: https://twitter.com/nrcgov Facebook: https://www.facebook.com/nrcgov/

YouTube: https://www.youtube.com/user/NRCgov Flickr: https://www.flickr.com/photos/nrcgov/sets LinkedIn: https://www.linkedin.com/company/u-s--nuclear-regulatory-commission/

GovDelivery: https://service.govdelivery.com/accounts/USNRC/subscriber/new

FEEDBACK/COMMENTS/QUESTIONS Public Meeting Feedback Form:

1) Navigate to the Public Meeting Schedule (recently held)
2) click the Meeting Feedback link or the [more] link for this meeting
3) click the Meeting Feedback link on the Meeting Details page Nuclear Regulatory Commission l Region II April 17, 2023