ML22269A485

From kanterella
Revision as of 12:49, 20 October 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Operator Licensing Examination Approval
ML22269A485
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/29/2022
From: Diane Jackson
NRC/RGN-I/DORS
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
Jackson D
References
Download: ML22269A485 (3)


Text

September 29, 2022 David P. Rhoades Senior Vice President Constellation Energy Generation, LLC President and Chief Nuclear Officer (CNO)

Constellation Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

R. E. GINNA NUCLEAR POWER PLANT - OPERATOR LICENSING EXAMINATION APPROVAL

Dear David Rhoades:

The purpose of this letter is to provide U.S. Nuclear Regulatory Commission (NRC) approval of the proposed written examination and operating test under Title 10 of the Code of Federal Regulations (10 CFR) 55.40(b)(4) and to confirm the final arrangements for the upcoming operator licensing examination at the R. E. Ginna Nuclear Power Plant.

The NRC has approved the subject examinations, and you may administer the written examination on October 25, 2022, in accordance with Revision 12 to NUREG-1021, Operator Licensing Examination Standards for Power Reactors, issued September 2021. The NRC staff will administer the operating test during the week of October 17, 2022. The NRC has provided the list of the applicants approved to take the examinations to Steve Minya, Training Director.

The examinations have undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examinations meet the guidelines of NUREG-1021 for content, operational, and discrimination validity. By administering the written examination, you also agree that the examinations meet NUREG-1021 guidelines and are appropriate for measuring the qualifications of licensed operator applicants at your facility. If you determine that these examinations are not appropriate for licensing operators at your facility, do not administer the written examination and contact me at (610) 337-5306.

D. Rhoades 2 Please contact your NRC Chief Examiner, Joseph DeMarshall, at (610) 337-5134, if you have questions or identify any errors or changes in the license level (reactor operator or senior reactor operator) or type of examination (partial or complete written examination or operating test, or both) specified for each applicant approved to take the examinations.

Sincerely, Digitally signed by Donald Donald E. E. Jackson Date: 2022.09.29 Jackson 06:36:11 -04'00' Donald E. Jackson, Chief Operations Branch Division of Operating Reactor Safety Docket Nos. 05000244 License Nos. DPR-18 cc: Distribution via ListServ

D. Rhoades 3

SUBJECT:

R. E. GINNA NUCLEAR POWER PLANT - OPERATOR LICENSING EXAMINATION APPROVAL DATED SEPTEMBER 29, 2022 DISTRIBUTION:

JDeMarshall, DORS DJackson, DORS ECarfang, DORS SHaney, DORS CSwisher, DORS JSchussler, DORS, SRI ACass, DORS, AA LMcKown, RI OEDO RidsNrrPMREGinna Resource RidsNrrDorlLpl1 Resource DOCUMENT NAME: \\nrc.gov\nrc\R1\Office\DRS\Operations Branch\DEMARSHALL\Ginna 2022\Admin\Exam Approval Letter\GINNA 2022 Rev 12 2.3-1 Examination Approval Letter.docx ADAMS Package Number: ML22020A120 ADAMS Accession Number ML22269A485 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DORS/OB RI/DORS/OB NAME JDeMarshall/JD DEJackson/DEJ DATE 9/26/22 9/26/22 OFFICIAL RECORD COPY