ML22131A130
From kanterella
ML22131A130 | |
Person / Time | |
---|---|
Site: | Seabrook |
Issue date: | 05/05/2022 |
From: | NextEra Energy Seabrook |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML22131A110 | List:
|
References | |
SBK-L-22042 | |
Download: ML22131A130 (33) | |
Similar Documents at Seabrook | |
---|---|
Category:Drawing
MONTHYEARML22245A0022022-05-0505 May 2022
[Table view]1 to Updated Final Safety Analysis Report, Chapter 2.4, Figures Redacted ML22131A0902022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 2 ML22131A1262022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix a - C ML22131A1082022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2.3, Figures SBK-L-22042, 1 to Updated Final Safety Analysis Report, Chapter 2.5, Figures, Part 1 Redacted2022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2.5, Figures, Part 1 Redacted ML22131A0892022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix I, Report of Analysis of High Energy Line Breaks Outside Containment ML22245A0592022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2.5, Figures, Part 2_Redacted ML22131A1312022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 3 ML22131A1302022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix G, Part 2 and Appendix H ML22131A1002022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix G, Container Liner Anchor Load Tests, Part 1 ML22131A0972022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 1 ML22131A1242022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix D - F ML21089A0732021-03-30030 March 2021 Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.2, Figures Redacted ML20323A1612020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 3 ML21089A0822020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.4, Figures - Redacted ML21090A1832020-10-22022 October 2020 Updated Final Safety Analysis Report - Chapter 2.5 Figures Part 1 (Redacted) ML20323A1372020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.3, Figures ML20323A1562020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 2 ML21089A3662020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5, Figures, Redacted ML21089A3912020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Figures - Redacted ML20323A1472020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 1 SBK-L-19033, Revision 19 to Updated Final Safety Analysis Report, Chapter 2, Figures 2.5-5.0 Through 2,5-71, Part 2 - Redacted2019-03-22022 March 2019 Revision 19 to Updated Final Safety Analysis Report, Chapter 2, Figures 2.5-5.0 Through 2,5-71, Part 2 - Redacted ML17310A3822017-10-27027 October 2017 Seabrook Station Revision 18 to Updated Final Safety Analysis Report, Chapter 2.3, Figures ML17310A4072017-10-27027 October 2017 Seabrook Station Revision 18 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 1 ML17310A4082017-10-27027 October 2017 Seabrook Station Revision 18 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 2 ML17310A4412017-10-27027 October 2017 Seabrook Station Revision 18 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 3 ML14318A0142014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Drawings ML14317A7472014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Drawings ML14318A0132014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Drawings ML14318A0152014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Drawings ML14317A7482014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Drawings ML14318A0162014-10-21021 October 2014 Seabrook Station Updated Final Safety Analysis Report, Revision 16, Drawings ML16117A5872014-10-21021 October 2014 Updated Final Safety Analysis Report, Revision 16, Chapter 3, Design of Structures, Components, Equipment and Systems, Drawings 9763-F-101438, Rev 4, Through 9763-F-101635, Rev 7 - Redacted ML16117A5852014-10-21021 October 2014 Updated Final Safety Analysis Report, Revision 16, Chapter 3, Design of Structures, Components, Equipment and Systems, Drawings 9763-F-101303, Rev 9, Through 9763-F-101528, Rev 7 - Redacted SBK-L-14179, Updated Final Safety Analysis Report, Revision 16, Drawings - Redacted2014-10-21021 October 2014 Updated Final Safety Analysis Report, Revision 16, Drawings - Redacted ML16117A5792014-10-21021 October 2014 Updated Final Safety Analysis Report, Revision 16, Chapter 3, Design of Structures, Components, Equipment and Systems, Drawings 9763-F-101696, Rev 12, Through 9763-F-101463, Rev 12 - Redacted ML13247A7012013-08-30030 August 2013 E-mail Relief Request RA-13-001 ML16117A5752013-04-26026 April 2013 Updated Final Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems, Drawing 9763-F-101438 Through Drawing 9763-F-101635 - Redacted ML16117A5732013-04-26026 April 2013 Updated Final Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems, Drawing 9763-F-101696 Through Drawing 9763-F-101463 - Redacted ML16201A3052013-04-26026 April 2013 Updated Final Safety Analysis Report, Revision 15, Chapter 9 - Auxiliary Systems, Drawing Pid - 1-SF-B20480 Through Drawing Pid - 1-VG-B20782 - Redacted ML13134A1102013-04-26026 April 2013 Updated Final Safety Analysis Report, Revision 15, Chapter 9 - Auxiliary Systems, Drawing Pid - 1-CBA-B20300 Through Drawing Pid - 1-DG-B20467 ML16117A5772013-04-26026 April 2013 Updated Final Safety Analysis Report, Revision 15, Chapter 3 - Design of Structures, Components, Equipment and Systems, Drawing 9763-F-101303 Through Drawing 9763-F-202118 - Redacted ML13134A1112013-04-26026 April 2013 Updated Final Safety Analysis Report, Revision 15, Chapter 10 - Steam and Power Conversion System, Drawing 1-NHY-202116 Through Drawing Pid - 1-CPS-B20152 ML16201A4062011-11-17017 November 2011 Updated Final Safety Analysis Report, Revision 14, Chapter 6, Drawings - Redacted ML16201A3872011-11-17017 November 2011 Updated Final Safety Analysis Report, Revision 14, Chapter 9, Drawings, Part 1 of 2 - Redacted ML16201A3742011-11-17017 November 2011 Updated Final Safety Analysis Report, Revision 14, Chapter 8, Drawings - Redacted SBK-L-11223, Updated Final Safety Analysis Report, Revision 14, Chapter 12, Drawings - Redacted2011-11-17017 November 2011 Updated Final Safety Analysis Report, Revision 14, Chapter 12, Drawings - Redacted ML16117A5712011-11-17017 November 2011 Updated Final Safety Analysis Report, Revision 14, Chapter 3, Drawings, Part 3 of 3 - Redacted ML1016203292010-06-0101 June 2010 Drawing PID-1-SF-LR20483, Rev. 15, Through Drawing PID-1-WT-LR20041, Rev. 7 ML1016203342010-06-0101 June 2010 Drawing PID-1-DW-LR20601, Rev. 1, Through Drawing PID-1-MAH-LR20496, Rev. 12 2022-05-05 Category:Graphics incl Charts and Tables MONTHYEARML22131A1302022-05-0505 May 2022
[Table view]1 to Updated Final Safety Analysis Report, Chapter 3, Appendix G, Part 2 and Appendix H ML20323A1522020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems SBK-L-20127, Generator Tube Inspection Report2020-10-20020 October 2020 Generator Tube Inspection Report L-2018-067, Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table L-2016-109, Official Service List Changes and Distribution for Safeguards Information and Official Use Only-Security-Related Information2016-05-11011 May 2016 Official Service List Changes and Distribution for Safeguards Information and Official Use Only-Security-Related Information ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T ML13004A3402012-12-11011 December 2012 Nuclear Meeting Letter from Don Tilbury Dated December 11, 2012 SBK-L-11209, Correction to 2010 Annual Radioactive Effluent Release Report2011-10-14014 October 2011 Correction to 2010 Annual Radioactive Effluent Release Report SBK-L-09216, Nextera Seabrook Station, Response to Regulatory Conference Questions, Dated 10/09/092009-10-0909 October 2009 Nextera Seabrook Station, Response to Regulatory Conference Questions, Dated 10/09/09 ML16195A3882008-11-0303 November 2008 Updated Final Safety Analysis Report, Revision 12, Chapter 2, Figures 2.-4-1 Through 2.4-32 - Redacted L-2008-002, Corporate Merger of Decommissioning Trustee2008-01-0303 January 2008 Corporate Merger of Decommissioning Trustee ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0626502572006-10-15015 October 2006 Receipt of Draft Response to NRC Staff Clarifying Questions Related to a Request for Additional Information ML0529902932005-10-19019 October 2005 FAQ Log 10/19/2005 SBK-L-05172, Response to Request for Additional Information Regarding Seabrook Station Unit No. 1, Steam Generator Tube Inspection Summary for the Fall 2003 Outage2005-08-0404 August 2005 Response to Request for Additional Information Regarding Seabrook Station Unit No. 1, Steam Generator Tube Inspection Summary for the Fall 2003 Outage ML0318401882003-06-0505 June 2003 Draft - Outlines 2022-05-05 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML22131A1082022-05-0505 May 2022
[Table view]1 to Updated Final Safety Analysis Report, Chapter 2.3, Figures ML22131A1262022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix a - C ML22245A0022022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2.4, Figures Redacted ML22131A1012022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix a, Onsite Meteorological Data Summaries, November 1971-March 1973 ML22131A1112022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix J - K ML22131A1232022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix B, Onsite Meteorological Data Summaries, April 1979-March 1980 ML22131A1222022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Chapter 17, Quality Assurance ML22131A1022022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix G - I ML22131A1092022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix C, Geologic Investigations of the Scotland Road Fault (Clinton- Newbury Fault), Newbury, Massachusetts, and Portsmouth Fault Investigations ML22131A1062022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22245A1002022-05-0505 May 2022 9 to Evaluation and Comparison to BTP Apcsb 9.5-1, Appendix a - Redacted ML22131A1072022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML22131A0952022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML22131A0922022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML22131A1212022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix D, Geologic Bedrock Logs of Boring in the Site Area ML22131A1032022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix E, Historical Earthquakes in the Site Vicinity ML22131A1352022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Cover Letter and Information on Enclosures 1 to 7 ML22131A1202022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22245A0532022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Section 2.1, Figures - Redacted ML22131A0942022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs ML22131A1242022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix D - F ML22131A0912022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22131A1302022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix G, Part 2 and Appendix H ML22131A0882022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix L - R ML22131A0932022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 1, List of Effective Pages and Introduction and General Description of Plant ML22245A0422022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics - Redacted ML22131A1312022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 3 ML22131A0982022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2, Appendix F, Geotechnical Report - Reactor Borings, July 1974 ML22131A0992022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22131A1162022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22131A0892022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix I, Report of Analysis of High Energy Line Breaks Outside Containment ML22131A1292022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML22245A0592022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2.5, Figures, Part 2_Redacted ML22245A0612022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 8, Electric Power - Redacted ML22131A1172022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems ML22131A1002022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Appendix G, Container Liner Anchor Load Tests, Part 1 ML22131A0972022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 1 ML22131A0902022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 2 ML22131A0962022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System SBK-L-22042, 1 to Updated Final Safety Analysis Report, Chapter 2.5, Figures, Part 1 Redacted2022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 2.5, Figures, Part 1 Redacted ML22131A1252022-05-0505 May 2022 1 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML21089A0732021-03-30030 March 2021 Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.2, Figures Redacted ML20323A1592020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A Through Appendix 3C ML20323A1522020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems ML20323A1552020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3I ML20323A1512020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2J Through Appendix 2K ML20323A1582020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3D Through Appendix 3F ML20323A1572020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3G, Part 1 ML21089A3662020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5, Figures, Redacted ML21089A0822020-10-22022 October 2020 Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.4, Figures - Redacted 2022-05-05 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML22131A130&oldid=3471215"