Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22131A1305 May 20221 to Updated Final Safety Analysis Report, Chapter 3, Appendix G, Part 2 and Appendix H
ML20323A15222 October 2020Rev. 20 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and SystemsSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Non-Destructive Examination
Anticipated operational occurrence
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Nondestructive Examination
Finite Element Analysis
FLEX
Tornado-Generated Missile
Aging Management
Tornado Generated Missile
Earthquake
Maintenance Rule Program
Turbine Missile
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Through-Wall Leakage
Power change
GOTHIC
SBK-L-20127, Generator Tube Inspection Report20 October 2020Generator Tube Inspection Report
L-2018-067, Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table19 March 2018Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table
L-2016-109, Official Service List Changes and Distribution for Safeguards Information and Official Use Only-Security-Related Information11 May 2016Official Service List Changes and Distribution for Safeguards Information and Official Use Only-Security-Related Information
ML16056A13911 March 2016Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports
ML14307B70710 December 2014Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-TProbabilistic Risk Assessment
Fukushima Dai-Ichi
ML13004A34011 December 2012Nuclear Meeting Letter from Don Tilbury Dated December 11, 2012
SBK-L-11209, Correction to 2010 Annual Radioactive Effluent Release Report14 October 2011Correction to 2010 Annual Radioactive Effluent Release ReportAnnual Radioactive Effluent Release Report
SBK-L-09216, Nextera Seabrook Station, Response to Regulatory Conference Questions, Dated 10/09/099 October 2009Nextera Seabrook Station, Response to Regulatory Conference Questions, Dated 10/09/09Stroke time
ML16195A3883 November 2008Updated Final Safety Analysis Report, Revision 12, Chapter 2, Figures 2.-4-1 Through 2.4-32 - Redacted
L-2008-002, Corporate Merger of Decommissioning Trustee3 January 2008Corporate Merger of Decommissioning Trustee
ML07282030711 October 2007Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists
ML06265025715 October 2006Receipt of Draft Response to NRC Staff Clarifying Questions Related to a Request for Additional InformationFinite Element Analysis
ML05299029319 October 2005FAQ Log 10/19/2005Ultimate heat sink
Mission time
Post Accident Monitoring
Coatings
Large early release frequency
Exemption Request
SBK-L-05172, Response to Request for Additional Information Regarding Seabrook Station Unit No. 1, Steam Generator Tube Inspection Summary for the Fall 2003 Outage4 August 2005Response to Request for Additional Information Regarding Seabrook Station Unit No. 1, Steam Generator Tube Inspection Summary for the Fall 2003 OutageNondestructive Examination
Coast down
ML0318401885 June 2003Draft - OutlinesShutdown Margin
Downpower