ML20323A137

From kanterella
Jump to navigation Jump to search
Rev. 20 to Updated Final Safety Analysis Report, Chapter 2, Section 2.3, Figures
ML20323A137
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 10/22/2020
From:
NextEra Energy Seabrook
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20323A163 List:
References
SBK-L-20124
Download: ML20323A137 (12)


Text

Seabrook Site - 50 Mile Radius Regional Climatological Data Stations SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-1

Spring Wind Rose for the 30 ft. Level (March 1972 - May 1972)

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-2

Summer Wind Rose for the 30 ft. Level (June 1972 - August 1972)

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-3

Fall Wind Rose for the 30 ft. Level (November 1971 and September, October 1972)

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-4

Winter Wind Rose for the 30 ft. Level (December 1971 -

February 1972)

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-5

Annual Wind Rose for the 30 ft. Level (November 1971 -

October 1972)

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-6

Topographic Map within a Five Mile Radius of the Seabrook Site SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-7

Terrain Cross Section [2 Sheets]

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-8, Sh. 1 of 2

Terrain Cross Section [2 Sheets]

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-8, Sh. 2 of 2

Topographic Map Showing the Location of the Meteorological Tower with Respect to the Reactor Area SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-9

Meander as a Function of Wind Speed and Stability SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-10

Plume and TIBL Interaction SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 2.3-11