Summary of 930202 Meeting W/Util Re Proposed Amend Requests Currently Under Review.Amends Included,Refueling & Fuel Handling Spec Changes,Containment Penetration List Removal & Instrumentation Spec Changes
ML20128H958
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 02/10/1993
From: Gamberoni M
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
GL-91-08, GL-91-8, TAC-M83379, TAC-M83380, TAC-M84058, TAC-M84059, TAC-M84671, TAC-M84672, NUDOCS 9302170245
Download: ML20128H958 (6)


Text

_ - _ _ _ - - _ _-__

/'gma '

o UNITED STATES 8 g g NUCLEAR REGULATORY COMMISSION r,, f .t W ASHINGT ON, D. C. 20555 February 10, 1993 k....+ /

Docket No. 50-282 and 50-306 LICENSEE: Northern States Power Company FACILITY: Prairie Island Nuclear Generating Plant

SUBJECT:

DISCUSSION OF PROPOSED AMENDMENT REQUESTS MEETING

SUMMARY

A meeting was held on February 2, 1993 between the FD.C staff and Northern States Power licensing staff to discuss a number of proposed amendment requests currently under review. These amendments included; 1. Refueling and fuel Handling Specification Changes, 2. Containment Penetration List Removal, and 3. Instrumentation Specification Changes. The results of the discussions and the follow-up actions for each proposed amendment are presented below.

1. Refueling and Fuel Handling Specification Changes (TAC NOS. M84058 and M84059)

This amendment request incorporates Technical Specifications (TS) for containment closure requirements during refueling conditions. These include the Standard Technical Specifications and additional TS that take credit for the Auxiliary Building Special Ventilation System (ABSVS) and the Shield Building Ventilation System (SBVS). The primary focus of the discussions involved the technical details of the Auxiliary and Shield Building Ventilation Systems.

The action for this TAC is with the Containment Systems and Severe Accident Branch to determine if the additional TS on the ABSVS and SBVS are acceptable.

2. Removal of Component Lists from Technical Specifications (TAC NOS. M83379 and MS3380)

This amendment request is in response to Generic Letter 91-08, which allows the removal of component lists from TS. In the amendment request a TS section was included which listed the types of containment penetrations and valves that would not require type B and C testing. It was agreed during the meeting, that this section could lead to confusion since the list was not specific. However, since the licensee wanted to retain this information, a discussion of these exemptions in the current table will be addressed in the bases.

The action for this TAC is with NSP to resubmit these TS and bases pages as discussed.

3. Instrumentation Specification Changes (TAC NOS. M84671 and M84672) ,

9302170245 930210 PDR ADOCK 05000282 e cdIh [T PDR i P

h' 4 TB ev. #a""

y ) iW " ~

[ fo o

February in, 1993 This amendment request incorporates changes to the surveillance test intervals and allowed outage times for the engineered safety features and reactor protection system instrumentation consistent with the TS associated with WCAP-10271. This meeting was the initial discussion between the staff and Prairie Island regarding this amendment request. The Instrumentation and Controls technical reviewer had a number of questions regarding the ditferences between the generic TS presented in the NRC Safety Evaluation and the TS which were requested in the Prairie Island submittal. Discussions on this package continued during a conference call on February 4,1993.

The actions for this TAC are with NSP and the NRC. The licensee will prepare a revised submittal that will incorporate the corrections and changes discussed during the meeting and conference call. The NRC staff will continue their review of the remaining TS sections and the bases pages.

The meeting resulted in a signification exchange of information and was beneficial to the NRC staff and the licensee. Future meetings to discuss License Amendment Requests will be scheduled as required. A list of attendees is provided in the enclosure. If you have any questions regarding the meeting or meeting summary, please contact me at 504-3024.

Original signed by Marsha Gamberoni, Project Manager Project Directorate 111-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page OFFICE LA:PDIII-1 PM:PDIll-1 1 PD:PDIlld.

NAME MShuttle6hrth/ MGamberonb LMarsh DATE R _ //fy93 02/iO/93 f./ /o/93

f j3 February 10, 1993 This amendment request incorporates changes to the surveillance test intervals and allowed outage times-for the engineered safety features and reactor protection system instrumentation consistent with-the TS associated with WCAP-10271. This meeting was the initial discussion between the staff and Prairie Island regarding this amendment request. The Instrumentation and Controls technical reviewer had a number of questions regarding the differences between the generic TS presented in the NRC Safety Evaluation and the TS which were requested in the Prairie Island submittal. Discussions on this package continued during a conference call on February 4,1993, lhe actions for this TAC are with NSP and the NRC. The licensee will prepare a revised submittal that will incorporate the corrections and changes discussed during the meeting and conference call. The NRC staff will continue their review of the remaining TS sections and the bases pages.

The meeting resulted in a signification exchange of information and was beneficial to the NRC staff and the licensee. Future meetings to discuss License Amendment Requests will be scheduled as required. A list of attendees is provided in the enclosure. If you have any questions regarding the meeting or meeting summary, please contact me at 504-3024.

I Cou hc~ A '

Marsha Gamberoni, Project Manager Project Directorate 111-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page

A i

i Northern States Power Company- Prairie Island Nuclear Generating Plant J. E. Silberg, Esquire Shaw, Pittman, Potts and Trowbridge 2300 N Street, N. W.

Washington DC 20037 Mr. E. L. Watzl, Site General Manager Prairie Island Nuclear Generating Plant Northern States Power Company Route 2 Welch, Minnesota 55089 Lisa R. Tiegel Assistant Attorney General Environmental Protection Division Suite 200 520 Lafayette Road St. Paul, Minnesota 55155 U.S. Nuclear Regulatory Commission Resident Inspector Office 1719 Wakonade Drive

, East Welch, Minnesota 55089 Regional Administrator. Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. Jeff Cole, Auditor / Treasurer Goodhue County Courthouse Red Wing, Minnesota 55066 Kris Sanda, Commissioner Director of Public Service 121 Seventh Place East Suite 200 St. Paul, Minnesota .55101-2145 Mr. T. M. Parker, Manager Nuclear Support Services Northern States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 I

1

l 4

MEETING ATTENDANCE SHEET DISCUSSION OF LICENSE AMENDMENT REQUESTS February 2, 1993 Hama Discussions Attendtd Affiliation '

l. M. Gamberoni 1,2,3 NRC/NRR/DRPW/PDIII-l
2. J. Pulsipher 1,2 NRC/NRR/DSSA/SCSB
3. H. Garg 3 NRC/NRR/DRCH/HICB

~

4. C. Moon 1 NRC/NRR/ DORS /0TSB
5. M. Wohl 3 NRC/NRR/ DORS /0TSB
6. G. Eckholt 1,2,3 NSP
7. C. Mundt 3 NSP
8. T. Baker 3* Westinghouse
  • per telephone 1

-,-_--K--- - - - - - - - , - , - -- - - - - - - - _ - - - - . - )

g-DISTRIBUTION-FOR MEETING

SUMMARY

OF 2/2/93 Docket File-NRC & Local PDRs PDIII-1 Reading File T. Murley F. Miraglia J. Partlow

.- J. Roe J. Zwolinski L. Marsh  : .;

M. Shuttleworth M.-Gamberoni OGC E. Jordan MNBB 3701 J. Pulsifer M. Garg C. Moon M. Wohl ACRS (10)

W. Shafer, RIII l

.