Letter Sequence Acceptance Review |
---|
EPID:L-2022-LLR-0006, Proposed Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair (Approved, Closed) |
|
MONTHYEARML22003A0022021-12-20020 December 2021 Proposed Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair Project stage: Request ML22024A1852022-01-24024 January 2022 Acceptance for Review of Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair Project stage: Acceptance Review ML22118A3312022-04-28028 April 2022 NRR E-mail Capture - Peach Bottom - Formal RAI for Proposed Alternative I5R-14, Revision 1 Project stage: RAI ML22145A0852022-05-25025 May 2022 Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair Project stage: Response to RAI ML22186A1772022-07-0707 July 2022 Request for Withholding Information from Public Disclosure Peach Bottom Atomic Power Station, Unit 2 Project stage: Withholding Request Acceptance ML22236A6702022-08-30030 August 2022 Authorization and Safety Evaluation for Alternative Request I5R-14, Revision 1, Project stage: Approval 2022-04-28
[Table View] |
|
---|
Category:Code Relief or Alternative
MONTHYEARML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML22236A6702022-08-30030 August 2022 Authorization and Safety Evaluation for Alternative Request I5R-14, Revision 1, ML22024A1852022-01-24024 January 2022 Acceptance for Review of Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair ML22003A0022021-12-20020 December 2021 Proposed Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML20343A3492020-12-0707 December 2020 Acceptance of Requested Licensing Action: Peach Bottom Relief Request for N-16 Nozzle ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20188A2642020-07-0606 July 2020 Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information ML20099D9552020-04-17017 April 2020 Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive Examinations ML20097D6442020-04-14014 April 2020 Issuance of Relief Request Limited Examination Coverage During Fourth 10-Year Inservice Inspection Interval RS-20-020, Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi)2020-02-28028 February 2020 Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi) ML20036D9622020-02-0404 February 2020 Dresden Nuclear Power Station, Nine Mile Point Nuclear Station, Peach Bottom Atomic Power Station, & Quad Cities Nuclear Power Station - Proposed Alternative to Extend Reactor Pressure Vessel Safety Relief Valve Testing Frequency ML19350A0152019-12-19019 December 2019 Correction to Relief Request I5R-10 Dated December 2, 2019, Errors Introduced During the Issuance of Relief from the ASME Code Dated December 2, 2019 ML19330C6442019-12-0202 December 2019 Issuance of Relief Request Examination of Standby Liquid Control Nozzle Inside Radius Section in Lieu of Specific ASME Code Requirements ML19308A0112019-10-31031 October 2019 Relief Request I4R-63 Associated with the Fourth Inservice Inspection (ISI) Interval ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19149A2392019-06-11011 June 2019 Issuance of Relief Request Examination of Standby Liquid Control Nozzle Inside Radius Section in Lieu of Specific ASME Code Requirements ML19161A2572019-06-0404 June 2019 BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds2019-02-15015 February 2019 Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds ML18346A5002018-12-21021 December 2018 Issuance of Relief Request Use of ASME Code Case N-513-3 in Lieu of Specific ASME Code Requirements ML18331A2162018-12-21021 December 2018 Issuance of Alternative Requests Related to the Fifth Inservice Inspection Interval ML18327A0622018-12-10010 December 2018 Issuance of Relief Request Use of ASME Code Case N-513-4 in Lieu of Specific ASME Code Requirements JAFP-18-0052, Proposed Alternative to Utilize Code Case N-8792018-05-30030 May 2018 Proposed Alternative to Utilize Code Case N-879 ML18141A6002018-05-30030 May 2018 Safety Evaluation of Relief Request GVRR-2 Regarding the Fifth 10-Year Interval of the Inservice Testing Program JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-8802018-05-30030 May 2018 Proposed Alternative to Utilize Code Cases N-878 and N-880 ML18109A1162018-04-19019 April 2018 Relief Requests Associated with the Fifth Inservice Inspection Interval ML18107A7602018-04-17017 April 2018 Acceptance Review for Peach Bottom - Relief Requests from ASME Section XI Code - 5th ISI Interval Code Cases N-513-3 and N-513-4 ML18086B1102018-03-26026 March 2018 Relief Requests Associated with the Use of Code Cases N-513-4 and N-513-3 for the Fifth Inservice Inspection Interval ML18036A1562018-02-0707 February 2018 Safety Evaluation of Relief Request 01A-VRR-3 Regarding the Fifth 10-Year Interval of the Inservice Testing Program ML17332A0192017-12-0707 December 2017 Safety Evaluation of Relief Request 01A-VRR-4 Regarding the Fifth 10-Year Interval of the Inservice Testing Program ML17170A0132017-06-26026 June 2017 Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548) ML16230A2372016-09-0606 September 2016 Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) ML15225A5922015-08-13013 August 2015 Responds to Request for Additional Information Regarding Proposed Relief Request Associated with the Common Emergency Service Water (Esw)System Piping ML15210A7502015-07-29029 July 2015 Proposed Relief Request Associated with the Common Emergency Service Water (ESW) System Piping ML12121A6372012-05-10010 May 2012 Request to Use Code Case N-789 ML0817905392008-09-0303 September 2008 Requests for Relief Associated with the Fourth Inservice Testing Interval ML0809803112008-04-30030 April 2008 Relief Request to Use Boiling Water Reactor Vessel & Internals Project Guidelines.. ML0729106992007-10-25025 October 2007 Requests for Relief from ASME OM Code 5-year Test Interval for Safety Relief Valve/Safety Valves, Relief Request (RR) 01A-VRR-2 2023-12-14
[Table view] Category:E-Mail
MONTHYEARML24002A7132023-12-29029 December 2023 Supplement - Peach Bottom Security Rule Exemption Request ISFSI Docket No. Reference (EPID L-2023-LLE-0032) (Updated) (Email) ML23352A3242023-12-18018 December 2023 Acceptance of Requested Licensing Action Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations (EPID L- 2023-LLN-0004) ML23331A9112023-11-22022 November 2023 Supplement - Peach Bottom Security Rule Exemption Request ISFSI Docket No. Reference ML23304A0182023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Peach Bottom 2 & 3 - Exemption from Security Rule (L-2023-LLE-0032) ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22325A0052022-11-18018 November 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-273-A, Revision 2 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22118A3312022-04-28028 April 2022 NRR E-mail Capture - Peach Bottom - Formal RAI for Proposed Alternative I5R-14, Revision 1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22024A1852022-01-24024 January 2022 Acceptance for Review of Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21134A0152021-05-14014 May 2021 Acceptance Ventilation Filter Testing LAR ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21091A1782021-02-0202 February 2021 Ti 2515/194 Inspection Documentation Request ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21012A1302021-01-12012 January 2021 Request for Additional Information - TSTF-505 ML20357A0972020-12-21021 December 2020 Request for Additional Information - TSTF-505 ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting ML20343A3492020-12-0707 December 2020 Acceptance of Requested Licensing Action: Peach Bottom Relief Request for N-16 Nozzle ML20324A6472020-11-19019 November 2020 Acceptance of Requested Licensing Action: Peach Bottom One-time Exemption App. B Sect. VI.C.3.(I)(1) Force on Force (COVID-19) ML20314A0282020-11-0606 November 2020 Verbal Relief for Penetration Nozzle ML20283A7722020-10-0909 October 2020 Submittal of Pennsylvania Letter Requesting Exemption from Biennial Exercise Requirements for Pennsylvania Nuclear Power Plants in Calendar Year 2020 ML20276A0762020-10-0202 October 2020 Acceptance of Requested Licensing Action, One-Time Acceptance for Review - Peach Bottom of Exemption from 10 CFR 50, Appendix E, Biennial Emergency Preparedness Exercise Requirements Due to COVID-19 Pandemic ML20266G3032020-09-22022 September 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Request to Use Paragraph IWA-5120 of the 2017 Edition of the ASME B&PV Code, Section XI ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML20217L3462020-08-0404 August 2020 Audit Plan Regarding License Amendment Request to Implement Riskinformed Extended Completion Times (L-2020-LLA-0120) ML20191A0182020-07-0101 July 2020 NRR E-mail Capture - Exelon Fleet RR for SPI for Appendix J Valves ML20178A1392020-06-26026 June 2020 Acceptance Review for Peach Bottom - License Amendment Request for TSTF-505 ML20153A7042020-06-0101 June 2020 NRR E-mail Capture - Preliminary RAI for Fleet Request to Use Alternative OMN-26 ML20149K4312020-05-22022 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-566 ML20135H1972020-05-14014 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Extend Safety Relief Valve Test Interval ML20122A2302020-05-0101 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of Fleet License Amendment Request to Adopt TSTF-566 ML20077F6112020-03-16016 March 2020 E-mail: the U.S. Nuclear Regulatory Commission'S Record of Decision Regarding Exelon'S Subsequent License Renewal Application for Peach Bottom Atomic Power Station Units 2 and 3 ML20070R2282020-03-10010 March 2020 Request for Additional Information - RR ML20063G1362020-02-27027 February 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Acceptance of Proposed Alternative to Extend Safety Relief Valve Test Frequency (EPIDs L-2020-LLR-0014 Through L-2020-LLR-0018) ML20057E5562020-02-26026 February 2020 Availability of the Final Supplemental Environmental Impact Statement for Subsequent License Renewal of Peach Bottom Atomic Power Station, Units 2 and 3 2023-09-21
[Table view] |
Text
From: Paige, Jason <Jason.Paige@nrc.gov>
Sent: Monday, January 24, 2022 10:00 AM To: Gropp Jr, Richard W:(Exelon Nuclear) <Richard.Gropp@exeloncorp.com>
Cc: Rector, Matthew K.:(Exelon Nuclear) <Matthew.Rector@exeloncorp.com>; Grimme, Timothy M:(Exelon Nuclear) <timothy.grimme@exeloncorp.com>
Subject:
Acceptance for Review of Relief Request Associated with Reactor Pressure Vessel N16A Nozzle Repair (EPID L2022LLR0006)
Good morning, By letter dated December 20, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22003A002), Exelon Generation Company, LLC (the licensee) requested relief from certain requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, for Peach Bottom Atomic Power Station, Unit No. 2. The licensee submitted alternative I5R-14, Revision 1, requesting the previously repaired reactor vessel instrument penetration nozzle N-16A to be remained in service for remainder of the plant life which is scheduled to end on August 8, 2053.
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Pursuant to Section 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative.
Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this request will take approximately 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> to complete. The NRC staff expects to complete this review by October 3, 2022. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information and/or unanticipated addition of scope to the review. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any questions, please contact me at 301-415-1474 or by e-mail.
Docket No. 50-277
- Thanks, Jason