Issue date | Title | Topic | |
---|---|---|---|
ML23278A129 | 14 December 2023 | Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines | |
ML22236A670 | 30 August 2022 | Authorization and Safety Evaluation for Alternative Request I5R-14, Revision 1, | Nondestructive Examination Incorporated by reference |
ML22024A185 | 24 January 2022 | Acceptance for Review of Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair | |
ML22003A002 | 20 December 2021 | Proposed Relief Request Associated with Reactor Pressure Vessel N-16A Nozzle Repair | Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Finite Element Analysis EVT-1 Dissimilar Metal Weld |
ML21230A206 | 3 September 2021 | Proposed Alternative to Use ASME OM Code Case OMN-28 | Incorporated by reference |
ML21216A220 | 5 August 2021 | Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting | Coatings Nondestructive Examination Incorporated by reference |
ML20343A349 | 7 December 2020 | Acceptance of Requested Licensing Action: Peach Bottom Relief Request for N-16 Nozzle | |
ML20269A200 | 30 September 2020 | Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 | Incorporated by reference |
ML20188A264 | 6 July 2020 | Clinton Power Station, R.E. Ginna Station, Limerick Station, Nine Mile Point Station & Peach Bottom Station - Proposed Alternative to Utilize Code Case OMN-26 - Response to Request for Additional Information | Incorporated by reference |
ML20099D955 | 17 April 2020 | Request to Use Provisions in the 2013 Edition of the ASME Boiler and Pressure Vessel Code for Performing Non-Destructive Examinations | Non-Destructive Examination Incorporated by reference |
ML20097D644 | 14 April 2020 | Issuance of Relief Request Limited Examination Coverage During Fourth 10-Year Inservice Inspection Interval | Incorporated by reference |
RS-20-020, Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi) | 28 February 2020 | Relief Request for Alternative Frequency to Supplemental Indication Requirements of 10 CFR 50.55a(b)(3)(xi) | Power-Operated Valves |
ML20036D962 | 4 February 2020 | Dresden Nuclear Power Station, Nine Mile Point Nuclear Station, Peach Bottom Atomic Power Station, & Quad Cities Nuclear Power Station - Proposed Alternative to Extend Reactor Pressure Vessel Safety Relief Valve Testing Frequency | Grace period |
ML19350A015 | 19 December 2019 | Correction to Relief Request I5R-10 Dated December 2, 2019, Errors Introduced During the Issuance of Relief from the ASME Code Dated December 2, 2019 | VT-2 Incorporated by reference |
ML19330C644 | 2 December 2019 | Issuance of Relief Request Examination of Standby Liquid Control Nozzle Inside Radius Section in Lieu of Specific ASME Code Requirements | VT-2 Incorporated by reference |
ML19308A011 | 31 October 2019 | Relief Request I4R-63 Associated with the Fourth Inservice Inspection (ISI) Interval | |
ML19269C534 | 27 September 2019 | Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques | Incorporated by reference |
ML19149A239 | 11 June 2019 | Issuance of Relief Request Examination of Standby Liquid Control Nozzle Inside Radius Section in Lieu of Specific ASME Code Requirements | VT-2 Incorporated by reference |
ML19161A257 | 4 June 2019 | BWR Fleet Msv/Srv - Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 | Incorporated by reference |
ML19098A034 | 30 April 2019 | Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins | |
JAFP-19-0023, Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds | 15 February 2019 | Relief Request Associated with the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Piping Welds | Dissimilar Metal Weld |
ML18346A500 | 21 December 2018 | Issuance of Relief Request Use of ASME Code Case N-513-3 in Lieu of Specific ASME Code Requirements | Through-Wall Leak |
ML18331A216 | 21 December 2018 | Issuance of Alternative Requests Related to the Fifth Inservice Inspection Interval | Hydrostatic Nondestructive Examination Incorporated by reference |
ML18327A062 | 10 December 2018 | Issuance of Relief Request Use of ASME Code Case N-513-4 in Lieu of Specific ASME Code Requirements | Through-Wall Leak Through-Wall Leakage |
JAFP-18-0052, Proposed Alternative to Utilize Code Case N-879 | 30 May 2018 | Proposed Alternative to Utilize Code Case N-879 | Nondestructive Examination |
ML18141A600 | 30 May 2018 | Safety Evaluation of Relief Request GVRR-2 Regarding the Fifth 10-Year Interval of the Inservice Testing Program | |
JAFP-18-0053, Proposed Alternative to Utilize Code Cases N-878 and N-880 | 30 May 2018 | Proposed Alternative to Utilize Code Cases N-878 and N-880 | Nondestructive Examination |
ML18109A116 | 19 April 2018 | Relief Requests Associated with the Fifth Inservice Inspection Interval | |
ML18107A760 | 17 April 2018 | Acceptance Review for Peach Bottom - Relief Requests from ASME Section XI Code - 5th ISI Interval Code Cases N-513-3 and N-513-4 | |
ML18086B110 | 26 March 2018 | Relief Requests Associated with the Use of Code Cases N-513-4 and N-513-3 for the Fifth Inservice Inspection Interval | Through-Wall Leak |
ML18036A156 | 7 February 2018 | Safety Evaluation of Relief Request 01A-VRR-3 Regarding the Fifth 10-Year Interval of the Inservice Testing Program | Incorporated by reference Grace period |
ML17332A019 | 7 December 2017 | Safety Evaluation of Relief Request 01A-VRR-4 Regarding the Fifth 10-Year Interval of the Inservice Testing Program | Probabilistic Risk Assessment Surveillance Frequency Control Program Cold shutdown justification |
ML17170A013 | 26 June 2017 | Proposed Alternative to Eliminate Examination of Threads in Reactor Pressure Vessel Flange (CAC Nos. MF8712-MF8729 and MF9548) | |
ML16230A237 | 6 September 2016 | Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) | Incorporated by reference Through-Wall Leak |
ML15225A592 | 13 August 2015 | Responds to Request for Additional Information Regarding Proposed Relief Request Associated with the Common Emergency Service Water (Esw)System Piping | Mission time |
ML15210A750 | 29 July 2015 | Proposed Relief Request Associated with the Common Emergency Service Water (ESW) System Piping | Safe Shutdown Time of Discovery Non-Destructive Examination Weld Overlay Nondestructive Examination FLEX Through-Wall Leak |
ML12121A637 | 10 May 2012 | Request to Use Code Case N-789 | |
ML081790539 | 3 September 2008 | Requests for Relief Associated with the Fourth Inservice Testing Interval | Stroke time |
ML080980311 | 30 April 2008 | Relief Request to Use Boiling Water Reactor Vessel & Internals Project Guidelines.. | Incorporated by reference EVT-1 |
ML072910699 | 25 October 2007 | Requests for Relief from ASME OM Code 5-year Test Interval for Safety Relief Valve/Safety Valves, Relief Request (RR) 01A-VRR-2 |