ML21125A503

From kanterella
Revision as of 16:01, 20 January 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
0 to Updated Final Safety Analysis Report, Chapter 14.4, Figures 14.4.2-1 to 14.4.9-2 (Unit 2)
ML21125A503
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/19/2021
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21126A238 List: ... further results
References
AEP-NRC-2021-19
Download: ML21125A503 (22)


Text

UFSAR Revision 30.0 16.4 REVISED PER 98-UFSAR-0779 UNIT 2 REV. NO. DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER Isometric Mainsteam from Steam Turbine to COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP Containment Penetration Sleeve Unit No.2 BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.2-1 SH 1 of 1

UFSAR Revision 30.0 30" Line Break 30" Line Break 30" Line Break 30" Line Break 4" Line Break 4" Line Break

1. This drawing is to show the High Energy Line Break Locations only and cannot be used for any construction purposes. For detail information and dimensions see Piping Iso.'s.

High Energy Line Break Locations are labeled as shown with Symbol 4"/30" Line Break.

2. All dimensions & Elevations are Reference only.

16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER Isometric Mainsteam From Steam Turbine to COOK NUCLEAR PLANT Containment Penetration Sleeve for Unit 1 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.2-1A SH 1 of 1

UFSAR Revision 30.0 16.4 REVISED PER 98-UFSAR-0779 UNIT 2 REV. NO. DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER Isometric of Feedwater from Heaters # 6A &

COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP 6B to Steam Generators Unit No. 2 BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.2-2 SH 1 of 1

UFSAR Revision 30.0 6" Line Break 14" Line Break 6" Line Break 14" Line Break 14" Line Break 6" Line Break 14" Line Break 6" Line Break

1. This drawing is to show the High Energy Line Break Locations only and cannot be used for any construction purposes. For detail information and dimensions see Piping Iso.'s.

High Energy Line Break Locations are labeled as shown with Symbol 6"/14" Line Break.

2. All dimensions & Elevations are Reference only.

16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER Isometric Feedwater from Heaters 6A and 6B to Steam COOK NUCLEAR PLANT Generators for Unit 1 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.2-2A SH 1 of 1

UFSAR Revision 30.0 16.6 16.6 REVISED PER UCR 99-UFSAR-1307 HI ENERGY LINE BREAK EQUIP/SOURCE ARRG'T MEZZANINE FL. EL. 609'-0" UNITS NO. 1 & 2 FSAR FIG. 14.4.2 - 7 UNIT 2

UFSAR Revision 30.0 16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER Schematic of West Steam Enclosure/Main Steam COOK NUCLEAR PLANT Accessway NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-1 SH 1 of 1

UFSAR Revision 30.0 16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER TMD Network for West Steam Enclosure/Main Steam COOK NUCLEAR PLANT Accessway NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-2 SH 1 of 1

UFSAR Revision 30.0 16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER Schematic of East Steam Enclosure COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-3 SH 1 of 1

UFSAR Revision 30.0 16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER TMD Network for East Steam Enclosure COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-4 SH 1 of 1

UFSAR Revision 30.0 16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER Peak Environmental Parameters (West Main Steam COOK NUCLEAR PLANT Enclosure and Accessway) (Structural Qualification)

NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-5 SH 1 of 1

UFSAR Revision 30.0 16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER Peak Environmental Parameter (East Main Steam COOK NUCLEAR PLANT Enclosure) (Structural Qualification)

NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-6 SH 1 of 1

UFSAR Revision 30.0 16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER East Main Steam Enclosure Pressure Profile in COOK NUCLEAR PLANT Elements 2 and 3 NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-8 SH 1 of 1

UFSAR Revision 30.0 16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER Feedwater Line Break in Main Steam Accessway COOK NUCLEAR PLANT (Element 7) Pressure VS. Time NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.6-11 SH 1 of 1

UFSAR Revision 30.0 UNIT 2 16.6 Revised per 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE LAYOUT AND IDENTIFICATION OF WALLS AND SLABS FOR EAST MAIN COOK NUCLEAR PLANT STEAM ENCLOSURE, WEST MAIN STEAM ENCLOSURE, MAIN STEAM NUCLEAR GENERATION GROUP ACCESSWAY BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-1 SH 1 of 1

UFSAR Revision 30.0 16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER Isometric View of Main Steam Enclosure Accessway COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP West of Containment BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-2 SH 1 of 1

UFSAR Revision 30.0 16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Yield Line Pattern for Panels with Three Edges Fixed & One Edge COOK NUCLEAR PLANT Unsupported Subjected to Uniformly Distributed Load NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-3 SH 1 of 1

UFSAR Revision 30.0 16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Yield Line Pattern for Panels with Four Edges Fixed Subjected to COOK NUCLEAR PLANT Uniformly Distributed Load NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-4 SH 1 of 1

UFSAR Revision 30.0 16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Yield Line Pattern for Panels with Four Edges Fixed Subjected to COOK NUCLEAR PLANT Concentrated Point Load NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-5 SH 1 of 1

UFSAR Revision 30.0 16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Yield Line Pattern for Panels with Three Edges Fixed and Fourth COOK NUCLEAR PLANT Edge Free Subjected to a Concentrated Point Load at the Free NUCLEAR GENERATION GROUP Edge BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-6 SH 1 of 1

UFSAR Revision 30.0 16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS AMERICAN ELECTRIC POWER TITLE Yield Line Patterns for Panels with Three Edges Fixed and Fourth COOK NUCLEAR PLANT Edge Free Subjected to a Concentrated Point Load at Interior NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.8-7 SH 1 of 1

UFSAR Revision 30.0 16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER East Steam Enclosure COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.9-1 SH 1 of 1

UFSAR Revision 30.0 1 of 4 1 of 8 16.6 REVISED PER 99-UFSAR-1345 UNIT 2 REV. NO. DESCRIPTION REVISIONS TITLE AMERICAN ELECTRIC POWER West Steam Enclosure COOK NUCLEAR PLANT NUCLEAR GENERATION GROUP BRIDGMAN, MICHIGAN DWG. NO. FSAR FIG. 14.4.9-2 SH 1 of 1