Annual ISFSI Radioactive Effluent Release Report for 2020
ML21060B566
Person / Time
Site: Pilgrim, Holtec
Issue date: 03/01/2021
From: Sterdis A
Holtec Decommissioning International
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
HDI-PIL-21- 023
Download: ML21060B566 (1)


Text

Krishna P. Singh Technology Campus, 1 Holtec Blvd., Camden, NJ 08104 Telephone (856) 797-0900 Fax (856) 797-0909 10 CFR 72.44(d)(3)

March 1, 2021 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Pilgrim Nuclear Power Station Renewed Facility Operating License No. DPR-35 Docket No. 50-293 and 72-1044

Subject:

Annual ISFSI Radioactive Effluent Release Report for 2020 Pilgrim Nuclear Power Station (PNPS) utilizes the Holtec International HI-STORM 100 Cask System for the Independent Spent Fuel Storage Installation (ISFSI). Amendments No. 7 and 12 to Certificate of Compliance No. 1014 for the HI-STORM 100 Spent Fuel Storage Casks Section 5.4 requires the submittal of an Annual Radioactive Effluent Release Report pursuant to Title 10 Code of Federal Regulations 72.44(d)(3). The purpose of this letter is to document radioactive effluent releases for calendar year 2020 from the PNPS ISFSI spent fuel storage casks.

The HI-STORM 100 Cask System does not create any radioactive materials or have any radioactive waste treatment systems. Therefore, specific operating procedures for the control of radioactive effluents are not required. The HI-STORM 100 Cask System is also designed and fabricated with a totally seal-welded pressure vessel such that leakage from the confinement boundary is not considered to be a credible occurrence. Therefore, there were no radionuclides released to the environment in liquid or gaseous effluents from the ISFSI at PNPS during the reporting period of January 1, 2020 to December 31, 2020. Since there were no radioactive effluent releases, there were also no offsite effluent dose consequences.

There are no regulatory commitments in this letter.

Should you have any question or require further information, please contact me at (856) 797-0900 x 3813.

Respectfully, Andrea Digitally signed by Andrea Sterdis DN: cn=Andrea Sterdis, c=US, o=Holtec Decommissioning Sterdis International, ou=HDI, email=a.sterdis@holtec.com Date: 2021.03.01 16:26:50 -05'00' Andrea L. Sterdis Vice President, Regulatory and Environmental Affairs Holtec Decommissioning International, LLC cc: