Letter Sequence Acceptance Review |
---|
EPID:L-2021-LLR-0007, 10 CFR 50.55a Request Numbers VR-3 and VR-5, Valve Testing Extension (Approved, Closed) EPID:L-2021-LLR-0008, (Open) EPID:L-2021-LLR-0009, 10 CFR 50.55a Request Number VR-7, Revision 0, Check Valve Testing Extension (Approved, Closed) EPID:L-2021-LLR-0010, 10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension (Approved, Closed) EPID:L-2021-LLR-0011, 10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension (Approved, Closed) EPID:L-2021-LLR-0012, 10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension (Approved, Closed) |
|
MONTHYEARL-21-047, 10 CFR 50.55a Request Numbers VR-3 and VR-5, Valve Testing Extension2021-01-28028 January 2021 10 CFR 50.55a Request Numbers VR-3 and VR-5, Valve Testing Extension Project stage: Request L-21-054, 10 CFR 50.55a Request Number VR-7, Revision 0, Check Valve Testing Extension2021-01-29029 January 2021 10 CFR 50.55a Request Number VR-7, Revision 0, Check Valve Testing Extension Project stage: Request L-21-045, 10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension2021-02-0808 February 2021 10 CFR 50.55a Request Number VR-4, Revision 0, Exercising Test Frequency, VR-6, Revision 0, Position Verification Testing, and VR-8, Revision 0, Valve Test Frequency Extension Project stage: Request ML21054A1742021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Requests Regarding VR-3 and VR-5 Valve Testing Extensions Project stage: Acceptance Review ML21054A1802021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Requests Regarding VR-4, VR-6, and VR-8 Valve Testing Extensions Project stage: Acceptance Review ML21054A1782021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Request Regarding VR-7 Check Valve Testing Extension Project stage: Acceptance Review ML21050A1032021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-3, Rev. 0 and VR-5, Rev. 0 Project stage: RAI ML21050A1112021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-4, Rev. 0 and VR-6, Rev. 0 Project stage: RAI ML21050A1072021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request VR-7, Rev. 0 Project stage: RAI L-21-080, Response to Requests for Additional Information Re 10 CFR 50.55a Request Numbers VR-3. VR-4. VR-5, VR-61 and VR-7 (EPID Numbers L-2021-LLR-0007, L-2021-LLR-0008, L-2021-LLR-0009, L-2021-LLR-0010, and L-2021-LLR-0011)2021-02-22022 February 2021 Response to Requests for Additional Information Re 10 CFR 50.55a Request Numbers VR-3. VR-4. VR-5, VR-61 and VR-7 (EPID Numbers L-2021-LLR-0007, L-2021-LLR-0008, L-2021-LLR-0009, L-2021-LLR-0010, and L-2021-LLR-0011) Project stage: Response to RAI ML21063A1932021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-5, Revision 0 Project stage: Other ML21063A1962021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-7, Revision 0 Project stage: Other ML21063A1912021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-3, Revision 0 Project stage: Other ML21063A1982021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-8, Revision 0 Project stage: Other ML21063A1952021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-6, Revision 0 Project stage: Other ML21063A1922021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-4, Revision 0 Project stage: Other ML21077A0012021-03-17017 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Correction to Acceptance of Relief Requests Regarding VR-3 VR-4, VR-5, VR-6, VR-7, and VR-8 Valve Testing Extensions (Epids: L-2021-LLR-0007 Through L-2021-LLR-0012) Project stage: Acceptance Review ML21110A6092021-04-26026 April 2021 Issuance of Relief Requests Vr 3, Revision 0, and Vr 5, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval Project stage: Approval ML21123A2892021-05-0404 May 2021 Issuance of Relief Request Vr 7, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval Project stage: Approval ML21123A2172021-05-0505 May 2021 Issuance of Relief Requests Vr 4, Revision 0, Vr 6, Revision 0, and Vr 8, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval (EPIDs L 2021 Llr 0010, L 2021 Llr 0011, L 2021 Llr 0012 COVID-19 Project stage: Approval 2021-02-08
[Table View] |
Similar Documents at Perry |
---|
Category:E-Mail
MONTHYEARML24276A1002024-10-0202 October 2024 Email: Perry LRA - Requests for Confirmatory Information (RCI) ML24276A1282024-10-0202 October 2024 LRA - Requests for Additional Information - Round 1 (Set 3) - Email to Applicant ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) ML24241A1012024-08-28028 August 2024 LRA - Requests for Additional Information - Round 1 (Set 2)_Email to Applicant ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24192A2222024-07-0909 July 2024 LRA Changes - Selective Leaching Program (AMP XI.33) ML24192A2232024-07-0808 July 2024 License Renewal Clarification (AMP XI.33) ML24103A1262024-05-0808 May 2024 Email to Phil Lashley Decision on the Exemption Request for Perry ML24127A1992024-05-0606 May 2024 NRR E-mail Capture - (External_Sender) Perry License Renewal Scoping and Screening Breakout Question B.2.24 (Partial TRP-55) ML24103A1272024-05-0303 May 2024 Email to Phil Lashley Availability of Environmental Assessment for the Perry Exemption ML24120A3222024-04-26026 April 2024 Response from State of Oh Regarding Review of Environmental Assessment for Perry HI-STORM Exemption Request ML24120A3212024-04-25025 April 2024 Email to State of Oh Requesting Review of EA for Perry HI-STORM Exemption Request ML24061A1002024-03-29029 March 2024 Energy Harbor Fleet- Closing of Transaction Between Vistra Operations Company LLC and Energy Harbor Nuclear Corporation (Email) ML24080A3922024-03-20020 March 2024 NRR E-mail Capture - Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Power Station Unit No. 1, and Perry Nuclear Power Plant, Unit No. - Acceptance of Requested Licensing Action Exemption for Final Safety Analysis Report Update ML24074A4272024-03-14014 March 2024 NRR E-mail Capture - Final RAI - Perry Request for Relief - Proposed Inservice Inspection Alternative VR-9 ML24052A0092024-02-16016 February 2024 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-264 ML24017A2392024-01-17017 January 2024 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Valve Testing Frequency Alternative VR-9 ML23226A0742023-08-14014 August 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical Specifications ML23180A2322023-06-29029 June 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-276-A, Revision 2 ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23095A3442023-04-0505 April 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Licensing Action Request Regarding Irradiated Fuel Management Plan ML23010A2892023-01-10010 January 2023 NRR E-mail Capture - Perry Nuclear Power Plant - Delay in Issuance of License Amendment Regarding Revising the Methodology Used for Flood Hazard Analysis ML22341A0322022-11-30030 November 2022 10 CFR Part 21 Notification from Curtiss-Wright Nuclear Division for Qualtech Np Supplied Eaton TRM5 Timing Relays ML22241A0362022-08-29029 August 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Adopt TSTF-541, Revision 2 ML22167A1002022-06-16016 June 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Delay in Issuance of License Amendment and Exemptions Regarding Revising the Methodology Used for Flood Hazard Analysis (EPIDs No.L-2021-LLA-0067, L-2021-LLE-0022, L-2021-LLE-0023) ML22136A2122022-05-16016 May 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 ML22089A2452022-03-30030 March 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request VR-12 ML22020A0702022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Inservice Inspection Alternative IR-063 ML22020A0712022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Proposed Alternative VR-12 ML22020A0722022-01-18018 January 2022 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Alternative Requests Regarding VR-10 and VR-11 Inservice Valve Testing ML21140A2802021-05-20020 May 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment and Exemptions Regarding Revising the Methodology Used for Flood Hazard Analysis (Epids: L-2021-LLA-0067, L-2021-LLE-0022, L-2021-LLE-0023) ML21110A6852021-04-19019 April 2021 NRR E-mail Capture - Final RAI - Perry - Request to Review the Emergency Plan ML21084A2562021-03-25025 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of License Amendment Request to Adopt TSTF-002, Revision 1 ML21077A0012021-03-17017 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Correction to Acceptance of Relief Requests Regarding VR-3 VR-4, VR-5, VR-6, VR-7, and VR-8 Valve Testing Extensions (Epids: L-2021-LLR-0007 Through L-2021-LLR-0012) ML21070A4042021-03-11011 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant -Acceptance of License Amendment Request to Adopt TSTF-230, Revision 1 ML21063A1922021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-4, Revision 0 ML21063A1982021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-8, Revision 0 ML21063A1962021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-7, Revision 0 ML21063A1952021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-6, Revision 0 ML21063A1912021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-3, Revision 0 ML21063A1932021-03-0404 March 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Verbal Authorization of Request VR-5, Revision 0 ML21063A1342021-03-0404 March 2021 E-Mail Concurrence - SR-2 SE ML21050A1032021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-3, Rev. 0 and VR-5, Rev. 0 ML21050A1072021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request VR-7, Rev. 0 ML21050A1112021-02-18018 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Requests VR-4, Rev. 0 and VR-6, Rev. 0 ML21054A1742021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Requests Regarding VR-3 and VR-5 Valve Testing Extensions ML21054A1782021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Request Regarding VR-7 Check Valve Testing Extension ML21054A1802021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Acceptance of Relief Requests Regarding VR-4, VR-6, and VR-8 Valve Testing Extensions ML21049A2702021-02-16016 February 2021 NRR E-mail Capture - Perry Nuclear Power Plant - Request for Additional Information for Proposed Alternative Request SR-2, Rev. 0 (EPID: L-2021-LLR-0005) (2nd Round RAI) ML21032A3422021-02-0101 February 2021 NRR E-mail Capture - Final RAI - Perry Request for Relief - Proposed Alternative Request SR-2, Rev. 0 2024-09-06
[Table view] |
Text
From: Wall, Scott Sent: Wednesday, March 17, 2021 3:53 PM To: Lashley, Phil H (EH)
Cc: Morgan, Jeffrey D.
Subject:
Perry Nuclear Power Plant - Correction to Acceptance of Relief Requests Regarding VR-3 VR-4, VR-5, VR-6, VR-7, and VR-8 Valve Testing Extensions (EPIDs: L-2021-LLR-0007 through L-2021-LLR-0012)
Dear Mr. Lashley:
By letters dated January 28, 2021, January 29, 2021, and February 8, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML21028A796, ML21031A002, and ML21039A409, respectfully), Energy Harbor Nuclear Corp (the licensee) submitted relief requests VR-3, VR-4, VR-5, VR-6, VR-7, and VR-8 for Perry Nuclear Power Plant (Perry) proposing one-time extensions of testing for certain Perry valves scheduled for the spring 2021 refueling outage.
By emails dated February 16, 2021 (ADAMS Accession Nos. ML21054A174, ML21054A178, and ML21054A180), provided the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of these relief requests. The NRC staff concluded that the submittals provided technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed exemption in terms of regulatory requirements and the protection of public health and safety and the environment. Based on the information provided in the submittals and the assumption that the NRC would issue its regulatory decision by a written safety evaluation, the NRC staff expected to complete the reviews by March 31, 2021. On March 3, 2021, the NRC provided verbal authorizations of the proposed alternative VR-3, VR-4, VR-5, VR-6, VR-7, and VR-8 (ADAMS Accession Nos. ML21063A191, ML21063A192, ML21063A193, ML21063A195, ML21063A196, and ML21063A198, respectfully). These verbal authorizations signify the completion of the NRC initial review of the requests.
The purpose of this e-mail is to provide a corrected schedule for the completion of the staffs final written evaluations. Consistent with NRC Office Instruction LIC-102, Revision 3, Review of Relief Requests, Proposed Alternatives, and Requests to Use Later Code Editions and Addenda, the staff will issue the written evaluations within 150 calendar days after giving verbal authorization. As such, for all the submittals, the staffs final written evaluation is expected to be completed no later than July 31, 2021. If there are emergent complexities or challenges in our review that would cause changes to this forecasted completion date, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
If you have any questions, please contact me at (301) 415-2855 or e-mail at Scott.Wall@nrc.gov.
Scott P. Wall, LSS BB, BSP Senior Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301.415.2855 Scott.Wall@nrc.gov
Hearing Identifier: NRR_DRMA Email Number: 1075 Mail Envelope Properties (SA0PR09MB60588FDD52F7B2D4D736F304926A9)
Subject:
Perry Nuclear Power Plant - Correction to Acceptance of Relief Requests Regarding VR-3 VR-4, VR-5, VR-6, VR-7, and VR-8 Valve Testing Extensions (EPIDs: L-2021-LLR-0007 through L-2021-LLR-0012)
Sent Date: 3/17/2021 3:53:19 PM Received Date: 3/17/2021 3:53:21 PM From: Wall, Scott Created By: Scott.Wall@nrc.gov Recipients:
"Morgan, Jeffrey D." <jdmorgan@energyharbor.com>
Tracking Status: None "Lashley, Phil H (EH)" <phlashley@energyharbor.com>
Tracking Status: None Post Office: SA0PR09MB6058.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2783 3/17/2021 3:53:21 PM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: