ML21078A033
From kanterella
Letter Sequence RAI | |
---|---|
EPID:L-2020-LLA-0027, TSTF-52, TSTF-425 (Approved, Closed) | |
Initiation Administration | |
MONTHYEARGNRO-2020/00006, License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-02-19019 February 2020
[Table View]License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies Project stage: Request ML20076B6322020-03-16016 March 2020 NRR E-mail Capture - Grand Gulf - Acceptance Review for the LAR Associated with Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies Project stage: Acceptance Review ML20150A6012020-05-29029 May 2020 NRR E-mail Capture - Grand Gulf - Official RAI for LAR Associated with Containment ILRT Interval Change from 10 Years to 15 Years Project stage: RAI GNRO-2020/00023, Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies2020-06-26026 June 2020 Response to Request for Additional Information - License Amendment Request for Permanent Extension of Appendix J Type a Integrated Leakage Rate Test Frequencies Project stage: Response to RAI ML20343A2432020-12-0808 December 2020 Proposed License Amendment Request Revise Reactor Core Safety Limit to Reflect WCAP-17642-P-A, Revision 1 Project stage: Request ML21019A2192021-02-24024 February 2021 Issuance of Amendment No. 227 Extension of Appendix J Integrated Leakage Test Interval Project stage: Approval ML21077A1652021-02-26026 February 2021 (02/26/2021 E-mail) Draft Request for Additional Information LAR to Revise Technical Specifications for Steam Generator Inspection Frequency Project stage: Draft RAI ML21078A0332021-03-18018 March 2021 NRR E-mail Capture - Millstone Power Station, Unit 2 - Request for Additional Information - Proposed LAR to Revise TSs for Steam Generator Inspection Frequency Project stage: RAI 2020-05-29 |
ML21078A033 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 03/18/2021 |
From: | Richard Guzman NRC/NRR/DORL/LPL1 |
To: | Sinha S Dominion Generation |
References | |
L-2020-LLA-0027 | |
Download: ML21078A033 (5) | |
Similar Documents at Millstone | |
---|---|
Category:E-Mail
MONTHYEARML24213A2602024-07-31031 July 2024
[Table view]Request for Additional Information LAR to Support Implementation of Framatome Gaia Fuel ML24116A0112024-04-25025 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-13 Regarding Steam Generator Channel Head Drain Modification ML24115A2622024-04-24024 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-14 Regarding Pressurizer and Steam Generator Pressure-Retaining Welds and Full-Penetration Welded Nozzles ML24114A3192024-04-23023 April 2024 Acceptance Review Determination LAR to Extend Inspection Interval for Reactor Coolant Pump Flywheels (TSTF-421) Using the CLIIP ML24113A2502024-04-22022 April 2024 Request for Additional Information (e-mail 4/22/2024) License Renewal Commitment for Aging Management Program of Alloy 600 Components ML24092A1082024-04-0101 April 2024 3R22 RFO ISI Owners Activity Report Extension - NRC Staff Acknowledgement Email (4/1/2024) ML24065A3112024-03-0505 March 2024 Request for Additional Information (Redacted) (03/05/2025 E-mail from R. Guzman to S. Sinha) Framatome Gaia Fuel LOCA LAR ML24058A2322024-02-27027 February 2024 2/27/2024 E-mail from S. Sinha to R. Guzman P-8 Instrument Uncertainty in Support of LAR Framatome Gaia Fuel ML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staffs Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22320A5752022-11-16016 November 2022 E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel ML22298A2052022-10-25025 October 2022 Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles ML22292A3212022-10-19019 October 2022 Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program ML22297A1802022-10-0707 October 2022 Email Acknowledgement to Dominion Energy Nuclear Decommissioning Trust Fund Disbursement 30 Day Notification for Millstone Power Station Unit 1: Docket No 50-245 ML22278A0932022-10-0505 October 2022 E-mail to File - Summary of September 7, 2022, Meeting with Dominion to Discuss Proposed Supplement to the Spent Fuel Pool Criticality Safety Analysis (EPID L-2022-LRM-0059 ML22272A0332022-09-29029 September 2022 Memo E-mail to File - Summary of August 29, 2022, Meeting with Dominion to Discuss Proposed Alternative Request Post-peening follow-up Volumetric Exam of RPV Head Penetration Nozzle ML22252A1772022-09-0909 September 2022 Memo E-mail to File - Summary of August 9, 2022, Meeting with Dominion to Discuss Proposed Alternative Reqeust Recirculation Spray Pump Flow Testing (EPID L:2022-LRM-0057) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22123A0812022-05-0303 May 2022 Acceptance Review Determination for Proposed LAR for TS Change Applicable to TSTF-359, Increase Flexibility in Mode Restraints ML22069A7192022-03-10010 March 2022 E-mail from R. Guzman to S. Sinha - Millstone Unit 3 Steam Generator Outage Conference Call ML22020A4122022-01-11011 January 2022 1/11/2022 State Consultation E-mail, R. Guzman to J. Semancik Millstone Power Station, Unit 3 Planned Issuance of Amendment to Clarify Shutdown Bank TS and Add Alternate Control Rod Position Monitoring Requirements ML21348A7392021-12-14014 December 2021 E-mail - Acceptance Review Determination Alternative Request IR-4-09 for Use Alternative Brazed Joint Assessment Methodology for Class 3 Moderate Energy Piping ML21347A9412021-12-13013 December 2021 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Safety Evaluation for Amendment No. 280 Measurement Uncertainy Recapture Power Uprate ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21297A0072021-10-19019 October 2021 E-mail from R. Guzman to S. Sinha - Acknowledgemnt of Error in SE for Millstone Power Station, Unit 3, Amendment No. 279 Addition of Analytical Methodology to the COLR for LBLOCA ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA ML21200A2562021-07-19019 July 2021 7/19/2021 E-mail Pressurizer Steam Space Line Classification ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code 2024-07-31 Category:Request for Additional Information (RAI) MONTHYEARML24213A2602024-07-31031 July 2024
[Table view]Request for Additional Information LAR to Support Implementation of Framatome Gaia Fuel IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 ML24113A2502024-04-22022 April 2024 Request for Additional Information (e-mail 4/22/2024) License Renewal Commitment for Aging Management Program of Alloy 600 Components ML24065A3112024-03-0505 March 2024 Request for Additional Information (Redacted) (03/05/2025 E-mail from R. Guzman to S. Sinha) Framatome Gaia Fuel LOCA LAR ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23073A1802023-03-14014 March 2023 Notification of Commercial Grade Dedication Inspection (05000336/2023010 and 05000423/2023010) and Request for Information ML22251A1292022-09-0909 September 2022 Request for Additional Information Related to Response to Generic Letter 2004-04 ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML21225A5022021-08-13013 August 2021 Request for Additional Information for North Anna Power Station, Units 1 and 2, Surry Power Station, Units 1 and 2, and Millstone Power Station, Units 2 and 3, Appendix E of Fleet Report Com-Naf-2 (EPID:L02021-LLT-0000) Public Version ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code ML21182A2902021-07-0101 July 2021 7/1/2021 E-mail - Request for Additional Information Alternative Frequency to Supplemental Valve Position Verification Testing Requirements ML21112A3082021-04-22022 April 2021 Request for Additional Information (E-mail Dated 4/22/2021) License Amendment Request for Measurement Uncertainty Recapture Power Uprate ML21105A1152021-04-15015 April 2021 Request for Additional Information (e-mail Dated 4/15/2021) Proposed LAR for Addition of Analytical Methodology to the Core Operating Limits Report for a LBLOCA ML21078A0332021-03-18018 March 2021 NRR E-mail Capture - Millstone Power Station, Unit 2 - Request for Additional Information - Proposed LAR to Revise TSs for Steam Generator Inspection Frequency ML21076A4622021-03-17017 March 2021 NRR E-mail Capture - Draft RAI for Versatile Internals and Component Program for Reactors Vipre Code Review (L-2021-LLT-0000) ML21077A1652021-02-26026 February 2021 (02/26/2021 E-mail) Draft Request for Additional Information LAR to Revise Technical Specifications for Steam Generator Inspection Frequency ML21034A5762021-02-0303 February 2021 Request for Additional Information (e-mail Dated 1/3/2021) Alternative Request RR-05-06 Inservice Inspection Interval Extension for Steam Generator Weld Inspections ML20246G5612020-09-0202 September 2020 Request for Additional Information (E-mail Dated 9/2/2020) License Amendment Request for a One-Time Deferral of the Steam Generator Inspections ML20244A2902020-08-31031 August 2020 Request for Additional Information (E-mail Dated 8/31/2020) License Amendment Request to Revise Battery Surveillance Requirements ML20231A7172020-08-18018 August 2020 Request for Additional Information (e-mail Dated 8/18/2020) License Amendment Request to Revise TS Table 3.3-11 Accident Monitoring Instrumentation ML20184A0052020-07-0202 July 2020 Request for Additional Information (E-mail Dated 7/2/2020) Relief Request IR-3-33 for Limited Coverage Examiniations ML20075A0322020-03-15015 March 2020 Request for Additional Information (E-mail Dated 3/15/2020) Alternative Request IR-4-03 for Use of an Alternative Non-Code Methodology to Demonstrate Structural Integrity ML20050F9212020-02-19019 February 2020 Request for Additional Information (E-mail Dated 2/19/2020) Proposed LAR to Revise TS 3.8.1.1, AC Sources Operating ML20023D0372020-01-23023 January 2020 Request for Additional Information (E-mail Dated 1/23/2020) Proposed LAR to Revise TS 3.8.1.1, AC Sources Operating ML19361A0382019-12-23023 December 2019 12/23/19 E-mail from R.Guzman to S. Sinha - Draft Request for Additional Information Planned Audit of LAR to Revise TS 3.8.1.1 ML19277B9082019-10-0707 October 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action Extension of Technical Specification 3.8.1.1, A.C. Sources - Operating, Allowed Outage Time ML19248D7552019-09-0505 September 2019 Request for Additional Information Via E-mail from R.Guzman to S. Sinha Proposed License Amendment Request to Adopt 10 CFR 50.69 ML19169A0962019-06-17017 June 2019 NRR E-mail Capture - Request for Additional Information Emergency Action Level Scheme Change for Millstone Power Station - Units 1, 2, and 3, North Anna Power Station - Units 1 and 2, and Surry Power Station - Units 1 and 2 ML19162A0052019-06-10010 June 2019 NRR E-mail Capture - Draft RAIs for Dominion EAL Scheme Change ML19042A1822019-02-11011 February 2019 Request for Additional Information LAR for TS Changes to Spent Fuel Storage and New Fuel Storage, 02/11/2019 E-mail from R. Guzman to S. Sinha ML18291B3262018-10-18018 October 2018 Request for Additional Information LAR Regarding Proposed Technical Specification Changes for Spent Fuel Pool Storage and New Fuel Storage, E-mail from R.Guzman to S.Sinha ML18277A1762018-10-0404 October 2018 Request for Additional Information LAR to Revise TS Action Statement for Loss of Control Building Inlet Ventilation Rad Monitor Instrumentation Channels (e-mail from R.Guzman to M.Whitlock, EPID: L-2018-LLA-0099) ML18213A1152018-08-0101 August 2018 Request for Additional Information Alternative Request P-06 'C' Charging Pump (08/01/2018 E-mail from R. Guzman to M. Whitlock) ML18171A1532018-06-20020 June 2018 Request for Additional Information Via E-mail from R.Guzman to W.Craft Alternative Requests for Inservice Testing Program (E-mail from R.Guzman to W.Craft) (EPID: L-2018-LLR-0012-LLR-0022) ML18137A3132018-05-17017 May 2018 Request for Additional Information Via E-mail from R.Guzman to W.Craft Proposed License Amendment Request to Revise ILRT Type a and Type C Test Intervals ML17297A8472017-10-27027 October 2017 Request for Supplemental Information Regarding Generic Letter 2016-01, Monitoring of Neutron Absorbing Materials in Spent Fuel Pools (CAC No. MF9430; EPID L-2016-LRC-0001) ML17033B6142017-02-0202 February 2017 Request for Additional Information, 2017/02/02 E-mail from R.Guzman to W.Craft Proposed Alternative RR-04-24 and IR-3-30 for the Elimination of Reactor Pressure Vessel Threads in Flange Examination (CAC Nos. MF8468/MF8469) ML17005A3282017-01-0505 January 2017 MPS2 EOC-23 and MPS3 EOC-17 Steam Generator Tube Inspection Reports - Requests for Additional Information ML16260A0062016-09-16016 September 2016 2016/09/16 E-mail from R. Guzman to W. Craft Request for Additional Information - License Amendment Request Realistic Large Break Loss of Coolant Accident Analysis (MF7761) ML16267A0022016-09-12012 September 2016 2016/09/12 E-mail from R.Guzman to W.Craft Request for Additional Information - LAR to Revise ECCS TS and FSAR Ch. 14 to Remove Charging (MF7297) ML16133A3562016-05-12012 May 2016 E-mail from R. Guzman to C. Sly Request for Additional Information Supporting License Amendment Request to Remove Charging Credit ML16068A4142016-03-0808 March 2016 Request for Additional Information - Relief Request RR-04-19 Examination Cat R-A, Risk-Informed Piping Examinations (MF6569) ML16055A5302016-02-24024 February 2016 2016/02/24 E-mail from R.Guzman to W.Craft Request for Additional Information - LAR to Adopt Dominion Core Design and Safety Analysis Methods (MF6251) ML16047A1712016-02-16016 February 2016 2016/02/16 E-mail from R.Guzman to M. Whitlock Request for Additional Information - Small Break Loss of Coolant Accident Re-Analysis (MF6700) ML16043A5232016-02-12012 February 2016 Request for Additional Information 2016/02/12 E-mail from R. Guzman to M.Whitlock Relief Requests IR-3-22 and IR-3-23 (CAC Nos. MF6573 and MF6574) ML16013A4772016-01-13013 January 2016 NRR E-mail Capture - Millstone Power Station, Units 2 and 3 - Request for Additional Information License Amendment Request for Removal of Severe Line Outage Detection (Slod) from the Offsite Power System - (MF6430, MF6431) ML16011A5172016-01-11011 January 2016 NRR E-mail Capture - Millstone Power Station, Unit 3, Reactor Vessel Surveillance Capsule Withdrawal Schedule - Request for Additional Information 2024-07-31 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML21078A033&oldid=3398673"