MONTHYEARML20217B3951999-10-0606 October 1999 Compliance Evaluation Rept Supporting Amend 3 to Coc GDP-1 ML20210F9861999-07-28028 July 1999 Compliance Evaluation Rept Accepting Amend to Coc GDP-1 Re Criticality Accident Alarm Sys Audibility Upgrades ML20210G0511999-07-26026 July 1999 Compliance Evaluation Rept Accepting QAP Descriptions ML20205K4321999-04-0707 April 1999 Compliance Evaluation Rept Supporting Change in Title of Executive Vice President,Operations to Executive Vice President ML20202F0991999-01-31031 January 1999 Rev 1 to Compliance Evaluation Rept for Renewal of Coc GDP-1, for Paducah Gaseous Diffusion Plant,Paducah,Ky ML20202F1061999-01-31031 January 1999 Rev 1 to Compliance Evaluation Rept for Renewal of Coc GDP-2, for Portsmouth Gaseous Diffusion Plant,Piketon,Oh ML20198B3041998-12-0707 December 1998 Compliance Evaluation Rept Supporting Application Re Criticality Accident Alarm Sys Audibility Upgrades, Compliance Plan Issues 46 & 50 ML20197G6891998-12-0707 December 1998 Compliance Evaluation Rept Supporting Application Re Product & Tails Withdrawal Facilities Criticality Accident Alarm Sys ML20195J9641998-11-30030 November 1998 Compliance Evaluation Rept for Renewal of Coc GDP-1 for Paducah Gaseous Diffusion Plant,Paducah,Ky ML20195J9761998-11-30030 November 1998 Compliance Evaluation Rept for Renewal of Coc GDP-2, Portsmouth Gaseous Diffusion Plant,Piketon,Oh ML20195K1391998-11-23023 November 1998 Compliance Evaluation Rept Supporting Amend to Coc GDP-1, Revising Technical Safety Requirements (Tsrs) Re Cylinder Crane Upgrades ML20195J0631998-11-18018 November 1998 Compliance Evaluation Rept,Supporting Amend of Coc GDP-1 to Delete Technical Safety Requirements 2.3.2.1 & 2.3.3.1 ML20155B7951998-10-27027 October 1998 Compliance Evaluation Rept Accepting Amend of Cocs GDP-1 & GDP-2,reflecting Conditions of Transfer for Privatization of Us Enrichment Corp ML20153F9061998-09-22022 September 1998 Compliance Evaluation Rept Approving Proposed Rev to Technical Safety Requirement 2.2.4.13 Re Autoclave Manual Isolation Sys ML20239A2271998-08-24024 August 1998 Compliance Evaluation Rept Supporting Amend to Coc GDP-1, Supporting Addition of New Criticality Accident Alarm Sys Cluster,Changing Surveillance Frequency & Correcting Cross Reference ML20203C3711997-12-0808 December 1997 Compliance Evaluation Rept Supporting Proposed Amend of Coc GDP-1 Re Buildings C-331 & C-335 Seismic Upgrades at Paducah Gaseous Diffusion Plant ML20203C4661997-12-0808 December 1997 Compliance Evaluation Rept Supporting Amend to Coc GDP-1 Re Closure of C-360 Autoclave Isolation Valves Following Zone 1 or 4 UF6 Detection ML20199L3591997-11-25025 November 1997 Compliance Evaluation Rept Approving Cross Ref for Product & Tails Withdrawal & Cascade Facilities Criticality Accident Alarm Sys ML20211C4751997-09-15015 September 1997 Compliance Evaluation Rept Re Application Dtd 970414,as Revised 970613,0623 & 0818 Concerning Cascade Cell Trip Function Requirements.Approval of Tsr Changes,Recommended ML20211C4251997-09-15015 September 1997 Compliance Evaluation Rept Recommending That Compliance Plan Changes Re Autoclave Upgrades Be Approved ML20141H7311997-07-16016 July 1997 Compliance Evaluation Rept,Recommending That New Tsr & SAR Changes Be Approved ML20141A9451997-06-12012 June 1997 Compliance Evaluation Rept Concluding That Proposed Wording Changes to Fnmc Plan & Compliance Plan Will Be Consistent W/Longstanding & Acceptable Method of Volume Determination ML20140D9941997-06-0505 June 1997 Compliance Evaluation Rept for Application Re Rev to Tsr for Administrative Controls on Overtime ML20141B1831997-05-13013 May 1997 Compliance Evaluation Rept Recommending Approval of Tsr Changes 2.3.4.8 & 2.1.4.4 to Broaden Applicability Statement & Cover Operation of Cylinder Scale Cart Movement Prevention Sys in Toll Transfer & Sampling Facility ML20137V6851997-04-14014 April 1997 Compliance Evaluation Rept for Application Re Autoclave Containment Valves Pressure Decay Testing ML20137K7011997-03-28028 March 1997 SER Recommending That Technical Safety Requirement & SAR Changes Be Approved 1999-07-28
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217M4141999-10-15015 October 1999 Usec Proposed Changes,Certificate Amend Request,Update Application SAR Detailed Description of Change ML20217D1821999-10-0808 October 1999 Part 21 Rept Re Potential for Cyclinder to Be Overfilled as Certified Water Capacity Stamped on Cylinder Less than Specified Min Capacity.Cylinder Will Be Removed from Service to Prevent Recurrence,Once Emptied ML20217B3951999-10-0606 October 1999 Compliance Evaluation Rept Supporting Amend 3 to Coc GDP-1 ML20212H4951999-09-24024 September 1999 Revised Pages to QA Program for Paducah GDP ML20212A8821999-09-14014 September 1999 Part 21 Rept Re 990812 Discovery That 48Y Cylinder, Containing Natural UF6,sent to Usec at Paducah from Bnfl Springs,Was Not in Compliance with ANSI 14.1 ML20211K4761999-08-31031 August 1999 Revised Pages to SAR Updates ML20212A8021999-08-27027 August 1999 Revised Sar,Comprising of Rev 41 to Application for Us NRC Certification,Paducah Gaseous Diffusion Plant ML20210F9861999-07-28028 July 1999 Compliance Evaluation Rept Accepting Amend to Coc GDP-1 Re Criticality Accident Alarm Sys Audibility Upgrades ML20210G0511999-07-26026 July 1999 Compliance Evaluation Rept Accepting QAP Descriptions ML20211D6601999-07-23023 July 1999 Revised Pages for SAR Update Certificate Amend Request ML20210C5481999-07-15015 July 1999 Usec Proposed Changes,Car Update Application SAR Detailed Description of Change ML20209D3431999-06-30030 June 1999 Revised Pages for SAR Update,Certificate Amend Request ML20209B5681999-06-25025 June 1999 Revised Pages to SAR, for Paducah Gaseous Diffusion Plant Re Criticality Accident Alarm Sys Audibility Upgrades ML20210B0671999-05-26026 May 1999 Informs Commission That Usec Submitted Amend Request for Paducah Gaseous Diffusion Plant Requesting 1-yr Extension of Completion Date from 990630 to June 30,2000,for Compliance Plan Issue 36 ML20207E1161999-05-18018 May 1999 Non-proprietary Version of Rev 39 to USEC-01 Application for Us NRC Certification of Paducah Gaseous Diffusion Plant, Including Changes to Tsrs Previously Submitted & Incorporates Related Changes to SAR & Program & Plans ML20206M0451999-04-27027 April 1999 Rev 3 to Updated Probabilistic Seismic Hazard Analysis for Paducah Gaseous Diffusion Plant Paducah,Ky,Final Rept ML20205Q5331999-04-0707 April 1999 Revised Sar,Comprised of Rev 38 to Application for NRC Certification,Paducah Gaseous Diffusion Plant ML20205K4321999-04-0707 April 1999 Compliance Evaluation Rept Supporting Change in Title of Executive Vice President,Operations to Executive Vice President ML20202F0991999-01-31031 January 1999 Rev 1 to Compliance Evaluation Rept for Renewal of Coc GDP-1, for Paducah Gaseous Diffusion Plant,Paducah,Ky ML20202F1061999-01-31031 January 1999 Rev 1 to Compliance Evaluation Rept for Renewal of Coc GDP-2, for Portsmouth Gaseous Diffusion Plant,Piketon,Oh ML20202G2681999-01-29029 January 1999 Revised Sar,Comprised of Rev 37,USEC-01 to Application for NRC Certification ML20199H3051999-01-19019 January 1999 Proposed Rev to Chapter 3,sections Grade 1-4 of Updated SAR ML20199H1121999-01-15015 January 1999 Rept to Congress on Gaseous Diffussion Plants Located Near Paducah,Ky & Portsmouth,Oh, Covering Period from 971001-980930 ML20199F2641999-01-0808 January 1999 Rev 35 to USEC-01, Application for NRC Certification for Paducah Gaseous Diffusion Plant ML20216D2931998-12-31031 December 1998 Rev 3 to POEF-LMUS-10, Criticality Accident Alarm Sys Coverage & Exclusions ML20198L0111998-12-23023 December 1998 Revised Sar,Comprising of Rev 34 to Application for NRC Certification ML20197G6891998-12-0707 December 1998 Compliance Evaluation Rept Supporting Application Re Product & Tails Withdrawal Facilities Criticality Accident Alarm Sys ML20198B3041998-12-0707 December 1998 Compliance Evaluation Rept Supporting Application Re Criticality Accident Alarm Sys Audibility Upgrades, Compliance Plan Issues 46 & 50 ML20195J9761998-11-30030 November 1998 Compliance Evaluation Rept for Renewal of Coc GDP-2, Portsmouth Gaseous Diffusion Plant,Piketon,Oh ML20195J9641998-11-30030 November 1998 Compliance Evaluation Rept for Renewal of Coc GDP-1 for Paducah Gaseous Diffusion Plant,Paducah,Ky ML20199G3611998-11-24024 November 1998 Seeks Commission Approval of Rept to Congress for Gaseous Diffusion Plants Located Near Paducah,Kentucky & Portsmouth, Ohio ML20195K1391998-11-23023 November 1998 Compliance Evaluation Rept Supporting Amend to Coc GDP-1, Revising Technical Safety Requirements (Tsrs) Re Cylinder Crane Upgrades ML20195J0631998-11-18018 November 1998 Compliance Evaluation Rept,Supporting Amend of Coc GDP-1 to Delete Technical Safety Requirements 2.3.2.1 & 2.3.3.1 ML20195B7821998-11-0909 November 1998 Rev 32 to Application for Us NRC Certification for Paducah Gaseous Diffusion Plant ML20155J8391998-11-0606 November 1998 Rev 31 to Application for Us NRC Certification for Paducah Gaseous Diffusion Plant ML20155K2991998-11-0606 November 1998 Usec Proposed Changes,Certificate Amend Request Update Application SAR Detailed Description of Change, Revised Pages to SAR Update Previously Transmitted ML20195B8131998-11-0505 November 1998 Certification Amend Request for Paducah Gaseous Plant ML20199E3551998-10-31031 October 1998 DOE Input to NRC Annual Rept to Congress Re Status of Environ,Safety & Health Conditions at Paducah & Portsmouth Gaseous Diffusion Plants for FY98 ML20155F5681998-10-31031 October 1998 Rev 29 to USEC-01, Application for Us NRC Certification Paducah Gaseous Diffusion Plant ML20155B7951998-10-27027 October 1998 Compliance Evaluation Rept Accepting Amend of Cocs GDP-1 & GDP-2,reflecting Conditions of Transfer for Privatization of Us Enrichment Corp ML20153F9061998-09-22022 September 1998 Compliance Evaluation Rept Approving Proposed Rev to Technical Safety Requirement 2.2.4.13 Re Autoclave Manual Isolation Sys ML20153D3981998-09-18018 September 1998 Rev 2 to Final Rept Updated Probabilistic Seismic Hazard Analysis for Paducah Gaseous Diffusion Plant Paducah,Ky ML20239A2271998-08-24024 August 1998 Compliance Evaluation Rept Supporting Amend to Coc GDP-1, Supporting Addition of New Criticality Accident Alarm Sys Cluster,Changing Surveillance Frequency & Correcting Cross Reference ML20217D1641998-04-15015 April 1998 Vols 1,2 & 3 to Rev 24 to USEC-01, Application for Us NRC Certification,Paducah Gaseous Diffusion Plant ML20216H9111998-04-14014 April 1998 Rev 24 to USEC-01,application for NRC Certification for Paducah Gaseous Diffusion Plant.Rev 24 Incorporates Changes to Sar,Qa Program Description,Emergency Plan,Fnmcp Transportation Security Plan & Physical Security Plan ML20217Q5991998-03-0505 March 1998 Rev 1 to Updated Probabilistic Seismic Hazard Analysis for Paducah Gaseous Diffusion Plant in Paducah,Ky,Final Rept ML20203C4661997-12-0808 December 1997 Compliance Evaluation Rept Supporting Amend to Coc GDP-1 Re Closure of C-360 Autoclave Isolation Valves Following Zone 1 or 4 UF6 Detection ML20203C3711997-12-0808 December 1997 Compliance Evaluation Rept Supporting Proposed Amend of Coc GDP-1 Re Buildings C-331 & C-335 Seismic Upgrades at Paducah Gaseous Diffusion Plant ML20199L3591997-11-25025 November 1997 Compliance Evaluation Rept Approving Cross Ref for Product & Tails Withdrawal & Cascade Facilities Criticality Accident Alarm Sys ML20202E0531997-11-24024 November 1997 Updated Probabilistic Seismic Hazard Analysis for Paducah Gaseous Diffusion Plant in Paducah,Ky,Final Rept. Page 4-35 of Incoming Submittal Was Not Included 1999-09-24
[Table view] |
Text
. _ _ . _ __ .. . _
Y%.
- 5 E NUCLEAR REGULATORY COMMISStON I f
- WASHINGTON. D.C. 205564001 o , . . . ,& July 16, 1997 l
. DOCKET: 70-7001 !
I CERTIF!CATE HOLDER:
United States Enrichment Corporation l l Paducah Gaseous Diffusion Plant l Paducah, KY l
SUBJECT:
COMPLIANCE EVALUATION REPORT: APPLICATION DATED ;
L OCTOBER 31,1996, REVISED FEBRUARY 14, AND JUNE 16, 1997, AUTOCLAVE MANUAL ISOLATION SYSTEM l
BACKGROUND I By letter dated October 31,1996, the United States Enrichment Corporation (USEC) '
(
requested an amendment to the proposed certificate of compliance for the Paducah Gaseous Diffusion Plant (PGDP). The request was based on the proposed certificate because the final certificate was not issued until November 26,1996. The request is to incorporate a new Technical Safety Requirement (TSR) 2.4.4.13 associated with the Autoclave Manual isolation System and to revise the appropriate pages in the Safety Analysis Report (SAR) By letters dated January 15,1997, the staff requested additional l
information. Staff review of the February 14,1997, USEC response, generated a second l request for additional information dated May 1,1997. USEC responaed to the second request by lotters dated May 16, and June 16,1997. This amendment request was '
submitted in accordance with Compliance Plan issue 3.
DISCUSSION in Compliance Plan issue 3, Action 1, USEC committed to install manual push buttons which would be used to place the feed f acility autoclaves into containment upon confirmation of a uranium hexafluoride release. The push buttons were to be installed at I the Operations Monitoring Room (OMR) door and at the crane bay exit near the local i
cylinder yard and would be activated 'oy the operator as the operator left the area upon
! seeing a release. A third push button was to be installed in the Area Control Room (ACR).
The Compliance Plan required USEC to submit a TSR for the autoclave manual isolation system.
t The autoclave manualisolation system provides a mechanism to remotely isolate all the l
autoclaves in the feed f acility in the event of a uranium hexafluoride release from piping >
! outside the autoclave. The manual isolation device allows the simultaneous isolatio autoclaves in the affected f acility. Previously this was conducted individually for each l autoclave by simulating a high-high conductivity signal which would place the autoclave ll i
' into containment mode. Placing th2 autoclave into containment eliminates the source of uranium hexafluoride available for release thus terminating the release.
The system, as installed, consists of two local (within the feed f acilities) actuation devices (pull buttons) located in the OMR and at the cylinder yard crane bay exit, and one remotely 9700010117 970716 ~
l PDR ADOCK 07007001 C PDR
.- . - ~ - - . . . .-
l i .
l
, 2 l
located actuation device in the associated cascade building ACR. The cylinder yard crane bay exit is the most likely point of egress from the autoclave area in the event of a release.
(Note that USEC installed pull buttons versus the push buttons designated in the j l
i compliance plan to reduce the potential for inadvertent actuation; the staff finds the pull l l buttons to be an acceptable alternative). The remainder of the system consists of the j programmable logic controller, the autoclave isolation valves, and the interconnections '
l between the components. The actuation device sends a signal to the programmable logic controller which then sends a signal to close the isolation valves on the autoclaves. l TSR 2.2.4.13 requires the autoclave manual isolation system actuation devices to be operable while the autoclave is in the closed mode or in a heating, feeding, or heeling i l operational mode. If only one local cevice is available, an operator is appropriately i etationed, within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, to activate the operable actuation device. If both local devices are inoperable, one device must be restored to an operable status within 4 houcs. If l operability is not restored within the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> window, actions must be immediately taken to l close containment valves or place the autoclave in an open or out of service mode, or -
operations can continue by establishing radio communication with the ACR to ensure immediate capability to actuate the system from the ACR in the event of a release and ,
l restoring operability within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Since at least one of the actuation devices is l available during operations and there is a UF, release detection system in the area, the 4 l hour window is acceptable. The surveillance required by this TSR is an annual functional test of the system actuation devices. The actuation device and the signal sent from the .
l actuation device to the programmable logic controller are tested annually. The l l programmable logic controller, valve closure signal, and the isolation valves are tested quarterly as part of the surveillance for the autoclave high pressure isolation system. An annual surveillance is acceptable for testing the system under this TSR.
USEC also submitted changes to the SAR to remove the Compliance Plan references and to make the system a O system under the quality assurance program. As part of the original l amendment package, USEC submitted changes to the Compliance Plan to reflect pull button actuation devices versus the push button type specified in the Compliance Plan.
The staff has determined a revision to the Compliance Plan is not necessary and therefore j will not include the Compliance Plan changes M the amendment to thq Certificate.
ENVIRONMENTAL REVIEW lssuance of an amendment to Certificate of Compliance GDP-1 to include a new TSR that addresses the autoclave manual isolation system is subject to the categorical exclusion l
j provided in 10 CFR 51.22(c)(19). Therefore, neither an environmental assessment nor an i I environmental impact statement is required for the proposed action.
1 i
i I
s J
l
CONCLUSION The proposed TSR 2.4.4.13 on the Autoclave Manual isolation System provides a means to remotely isolate all facility autoclaves in the event of a uranium hexafluoride release from the piping outside the autoclave. This system is considered an enhancement in support of the mitigation of a release. The staff recommends that the new TSR and the SAR changes be approved. Issuance of the certificate amendment will close Action 1 of Compliance Plan issue 3.
The Region ill Inspection staff have no objection to this proposed action.
1 Princioal Contributor Merri Horn '
i l
l l
DISTRIBUTION: (Control No. 0305)
Docket 70-7001 NRC File Center PUBLIC Rfil KO'3rien, Rlli NMSS r/f NMSS dir. ofc. r/f FCSS r/f FCOB SPB r/f PHiland Ritt A:\CER2. PAD OFC SPB L [ PPB h .SPB_ [ SPBA NAME TtkHorn:ij oadley artin Rk rson DATE ') /j/97 f /97 ) /97 ][{ 97 C = COVER E = COVE 1 & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY l