10/08/1999, U.S. Nticlear Regulatory Commission Qperations Center Event Report Page1 i
G;ntralInformation or Oth:r (PAR)
Event #
36273 Rep Org: BRITISH NUCLEAR FUELS, PLC Notification Date / Time:10/08/1999 08:14 (EDT)
Supplier: BRITISH NUCLEAR FUELS, PLC Event Date / Time:08/19/1999 (EST)
Last Modification:10/08/1999 Region:
Docket #:
City:
Agreement State: No County:
License #:
State:
NRC Notifled by: EUR ING MIKE R A SMIT Notifications: JOHN KINNEMAN R1 HQ Ops Officer: LEIGH TROCINE BRIAN BONSER R2 Emergency Class: NON EMERGENCY JOHN JACOBSON R3 10 CFR Section:
'KRISS KENNEDY R4 21 21 UNSPECIFIED PARAGRAPH KEVIN RAMSEY NMSS l
1 I
l I
i 10 CFR PART'?1 NOTIFICATION REGARDING THE POTENTIAL FOR A CYLINDER (MANUFACTURED BY STARVELEY'S LIMITED AND SUPPLIED BY BNFL TO USEC FOR ENRICHMENT) TO BE OVERFILLED BECAUSE THE CERTIFIED WATER CAPACITY STAMPED ON THE CYLINDER IS LESS THAN THE i
SPECIFIED MINIMUM CAPACITY
/
Th3 following text is a portion of a facsimile received from Eur Ing Mike R. A. Smith, MRA Smith BSc CEng MIES, t
Head of Magnox and Hex Business, British Nuclear Fuels (BNFL), Fuel Business Group:
"[10 CFR 21.21(4)(ii)- Identification of the facility, the activity, or the basic component supplied for such facility or such activity within the U.S. which fails to comply or contains a defect:] 48Y Cylinder no.1122/0690 containing 12,155.5 kg of UF6 supplied to [ United States Enrichment Corporation (USEC)] by BNFL Fuel for enrichment."
"[10 CFR 21.21(4)(iii)-Identification cf the firm constructing the facility or supplying the basic component which fails to comply or contains a defect:] Cylinder manufactured by Staveley's Limited, Manchester, England in 1978.
b
"[10 CFR 21.21(4)(iv)- Nature of the defect or failure to comply and the safety hazard which is created or could be cr:ated by such defect or failure to comply:] The certified water capacity stamped on the cylinder as part of the name plate data is less than the minimum capacity specified in ANSI N14.1, Table 1, standard cylinder data for a 48Y cylinder. [The] required minimum capacity [is) 142.7 ft$[, and the] actual certified water capacity [is] 4,019 kg; equivalent to.142.1 ft*. The cylinder, in its current condition, represents no safety hazard since the actual contents of 2,155.5 kg of UFO still allows a cylinder ullage of 7.2%. The cylinder has the potential to be overfilled if the normal maximum fill limit for a 453Y was reached (12,501 kg of UF6 as specified in ANSI N14.1)."
-7D l
b
"[10 CFR 21.21(4)(v)- The date on which the information of such defect or failure to comply was obtained:] A i
l memo was sent from USEC on 19 August 1999, informing BNFL Fuel that they had noted the certified water cap city was less than the ANSI-N14.1 minimum."
"[10 CFR 21.21(4)(vi)-In the case of a basic component which contains a defect or fails to comply, the number cnd location of all such components in use at, supplied for, or being supplied for one or more facilities or activities subject to ine regulations in this part:] Cylinder 1122/0690 is one of a batch of 108 cylinders purchased from 7
9910150053 991008 PDR ADOCK 07007001 C
PDR L~
yW1999 U.S. Nuclear Regul: tory Commission Operations Center Event Report Page 2 din:ralInformation or Oth:r (PAR)
Event #
36273 Staveleys in 1978. All other 48Y Type Cylinders 1122/0600 to 1122/0707 inclusive, numbering 107, are located on lic nsed sites in the UK."
"[10 CFR 21.21(4)(vii)- The corrective action which has been, is being, or will be taken; the name of the individual or organization responsible for the action; and the length of time that has been or will be taken to complete the action:] Having established that cylirider 1122/0690 is safe to feed; it is proposed to discuss with USEC the possibility of proceeding with the feed to their diffusion plant, as planned. Alternatively, should USEC be unwilling to proceed then concession will be sought to transfer the cylinder back to BNFL in the UK."
"Once emptied, the cylinder will be removed from service to prevent any possibility of a re-occurrence."
"Th3 Head of Site at BNFl. Springfields has commissioned a Working Party, which includes an independent senior engineer, independent selior operations manager, and standards / surveillance engineers."
"ThD Working Party:
a) Has already independently verified that there are no other under capacity cylinders located in the U.S.;
b) Will independently verify whether or not any other BNFL cylinders are under capacity; c) In the event that the independent verification does reveal any further such defective cylinders, willinitiate cppropriate action to remove such cylinders from service; d) Will monitor the implementation of any such. actions through to completion; e) [Has] already examined and modified BNFL's cylinder filling procedures to prevent an under capacity cylinder from being filled in the future; [and]
f) [Is] in the process of reviewing our cylinder purchase specification to prevent any further under capacity cylinders from being supplied."
"[10 CFR 21.21(4)(viii) - Any advice related to the defect or failure to comply about the facility, activity, or basic component that has been, is being, or will be given to purchasers or licensees:] The UK Nuclear Installations Inspectorate (Nil) and Departmelt of the Environment, Transport, and Regions (DETR) have been advised of this notification."
......................................................'mation.)
(Call the NRC operations officer for contact infor DRAFT lE a
Miscellaneous info: Events 36273 E
i
{
Name and address of individual making notification:
l l
l Eur Ing Mike R. A. Smith MRA Smith BSc CEng MIES l
1
}
Head of Magnox and Hex Business BNFL l
Fuel Business Group l
Springfields Salwick Plaston Lancashire l
PR4 OXJ United Kingdom Telephone 44-17-72-764392 Fax 44-17-72-762844 l
1 I
)
' i
s
' \\Q
{L, British Nuclear Fuels plc g
D I
FuIl Business Group Fuel Sa
- S"*
gl EE
.#3bL
\\
LanCashke PR4 0)U Tek 01772 762000 Notification of Failure to Comply or Existence of a Defect and its Evaluation The Information required for the ' written report ' required by.10 CFR Ch.1 Clause 21.21 section 4(i) through to 4(viii) is provided as follows.
(4)
(i)
Eur Ing Mike R. A. Smith MRA Smith BSc CEng MIEE Head of Magnor and Hex Business BNFL I
Fuel Business Group Springfields Salwick Preston I
Lancashire PR4 OXJ United Kingdos Telephone 44 17 72 764398 Fax 44 17 72 762844 (ii) 48Y Cylinder no.ll22/0690 containing 12155.5 kg of UF4 supplied to 1JSEC by DNFL Fuel for enricinnent.
(iii)
Cylinder manufactured by Staveley's Litnited, Manchester, England in 1978.
(iv)
The certified water capucity stamped on the cylinder as part of the nameplate data is less than the minimum capacity specified in ANSI N14.1 Table 1, standard cylinder data for a 48Y cylinder, Required minimum capacity 142.7 ft);
Actual certi0ed water capacity 4019 kg equivalent to 142.1 d' The cylinder in its current condition represents nu afety haard since the actual contents of 12,155.5 kg of UF, still allows a cylinder ullage of 7.2 %.
4 Registered la Engisad a*.100:A07 Registered Offica R$ey ww4nr.on Cheshire WA3 6A$
F i
.a 1
Page 2 cf 2 8 October 1999 The cylinder has the potential to be overfilled if the normal maimum 011 limit for a 48Y was reached, (12501 kg of UFr, as specified in ANSI N14,1.)
(v)
A memo was sent from USEC on 19 August 1999, informing HNFl. Fuel that they had noted the certified water capacity was less than the ANSI N14.1 minimum.
(vi)
Cylinder 1122/0090 is one of a batch of 108 cylinders purchased from Staveley's in 1978. All other 48Y Type Cylinders 1122/0600 to i122/0707 inclusive, numbering 107, are located on licensed sites in the UK.
(vii)
Having established that cylinder 1122/0690 is safe to feed; it is proposed to discuss with USEC the possibility of proceeding with the feed to their difTusion plant, as planned.
Alternatively should USEC be unwilling to proceert then a concession will be sought to transfer the cylinder back to BNFL in the UK.
Once emptied, the cylinder will be removed Dom seivice to prevent any possibility of a re-occurrCnCc.
The Head of Site at BNFL Springfields has commissioned a Working Party, which includes an independent senior engineer, independent senior operations manager and standards / surveillance engineers.
The Working Party; a) Has already independently verided that there are no other under capacity cylinders located in the US; b) Willindependently verify whether or not any other DNFL cylinders are under capacity; c) In the event that the independent veri 0 cation does reveal any further such defective cylinders, will initiate appropriate action to remove such cylinders from service; d) Will monitor the implementation of any such actions through to completion; c) IInvc already exainined und modi $ed BNFL's cylinder filling procedures to j
prevent an under capacity cylinder from being Siled in tlic futuie, f) Are in the process of reviewing our cylinder purchase specification to prevent any further under capacity cylinders from being supplied.
(vin) The UK Nuclear Installations inspectorate (Nil) and Department of the Envir'onment, Transport and Regions (lETR) have been advised of this notification.
I McWP Final kaponLH. sos a