__ _

Fe

! 7 emr og g

p '4 UNITED STATES j

g NUCLEAR REGULATORY COMMISSION o 2 WASHINGTON, D.c. 20666-0o01

g,, .....,/ June 5, 1997 4

DOCKET: 70-7001 CERTIFICATE HOLDER: United States Enrichment Corporation Paducah Gaseous Diffusion Plant Paducah, Kentucky F

SUBJECT:

COMPLIANCE EVALUATION REPORT: APPLICATION I DATED MARCH 31,1997, CHANGE TO TECHNICAL SAFETY

REQUIREMENTS FOR ADMINISTRATIVE CONTROLS ON <

OVERTIME E6CKGROUND 4 By letter dated March 31,1997, the United States Enrichment Corporation (USEC) requested an i amendment to the Certificate of Compliance for the Paducah Gaseous Diffusion Plant (PGDP). j The request is to revise the PGDP administrative controls on overtime specified in Technical Safety Requirement (TSR) 3.2.2.b.2 which defines the guidelines for the use of overtime at PGDP. This amendment request is submitted in accordance with Compliance Plan issue 42.

l TSR 3.2.2.b.2 in the USEC certificate application states-l l "An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, j nor more than 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> in any 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period, nor more than 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> in any 7 day period, all excluding shift tumover time."

USEC has proposed to revise TSR 3.2.2.b.2 to state:

"An individual should not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period, nor more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period, nor more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7 day l period, all excluding shift tumover time."

DISCUSSION

Administrative TSR 3.2.2.b.2 limits working hours of facility staff who perform safety functions j (operators, health physics Mrsonnel, maintenance personnel, etc.). The proposed change

! reduced the currently authorized limits of 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> in any 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period and 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> in any 7 day period, to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> period and 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7 day period, respectively. The  ;

staff has determined that these two 8-hour reductions in overtime limits will not adversely affect

safety. In fact, it may have a positive effect on safety by reducing occupational stresses and '

i burdens on facility staff who perform safety functions. The proposed TSR limits are consistent with NRC policy. Approval of this amendment will close Compliance Plan Issue 42.

9706110182 970605 PDR ADOCK 07007o0g PDR _ _ ._ -

ri 2 ,

ENVIRONMENTAL REVIEW

, issuance of the requested amendment to the Paducah Certificate of Compliance (GDP-1) to amend the administrative limits on overtime, is subject to the categorical exclusion provided in 10 CFR 51.22(c)(19) and will not have a significant impact on the human environment. Therefore, in accordance with 10 CFR 51.22(b), neither an environmental assessment nor an environmental impact statement is required for the proposed action. ,

i CONCLUSION Based on the information provided in the proposed TSR 3.2.2.b.2 amending the administrative controls on overtime of facility staff who perform safety functions, the staff recommends that the revised TSR be approved.

The Region lll Inspection staff has no objection to this proposed action.

Princioal Contributor Rocio Castaneira l

l l

1 I

DISTRIBUTION:(Control No. 220s)

Docket 70-7001 NRC File Center PUBLIC lli KO'Brien, til NMSS r# NMSS dir. ofc. r# FCSS r# FCOB SPB r# GShear, lll g \CER32026 OFC SPirO . d, SPB _

PB h SES ,, , SPR.h NAME RCas eira lj MHom ca_dley n R n on DATE N [h97 ( M97 97 8 2/97 $ /97 C = COVER E = COVER & ENCLOSURE N = NO COPY <

OFFICIAL RECORD COPY h'