unq p k UNITED STATES

, 's* j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2066tK1001

)

\*****/

June 12, 1997 DOCKET: 70-7001 CERTIFICATE HOLDER: United States Enrichment Corporation Paducah Gaseous Diffusion Plant Paducah, Kentucky l

SUBJECT:

COMPLIANCE EVALUATION REPORT: APPLICATION DATED l MARCH 4,1997, REVISIONS TO FUNDAMENTAL NUCLEAR MATERIAL CONTROL PLAN AND COMPLIANCE PLAN BACKGROUND By letter dated March 4,1997, the United States Enrichment Corporation (USEC) requested an amendment to the Certificate of Compliance for the Paducah Gaseous Diffusion Plant (PGDP).

The request pertains to revisions to the Fundamental Nuclear Material Control (FNMC) Plan and

! the Compliance Plan associated with the use of dimensional measurement calculations to i determine equipment volumes in the C-400 building. Specifically, proposed wording changes to l Section 4.4.3 of the FNMC Plan and related issue A.2 of the Compliance Plan were submitted to  !

be consistent with Section 4.1.1 of the FNMC Plan and to reflect current and approved practices.

DISCUSSION Section 4.1.1, " Equipment Volumes," of the PGDP's FNMC Plan states that system volumes will be determined by dimensional measurement calculations. This conforms to the facility's current and longstanding method and practices in the determination of tank volumes in the C-400 buiMing. PGDP uses a standardized formula for standard disk head on tanks from the Chemical Engineers' Handbook (page 6 Fifth edition - McGraw-Hill Book Co. - Robert Peny & Cecil ,

Chilton) to calculate volumes of partially filled horizontal cylinders. In addition, with the aid of a Lotus spreadsheet calculation program and Procedure CP4-CU-CH1476, " Nuclear Material l Inventories," the facility performs monthly inventories on a total of 55 tanks in the C-400 building, including error calculations supported by the Nuclear Material Control & Accounting (NMC&A) group. This routine method provides adequate results and no anomalies were observed.

However, Section 4.4.3 of the FNMC Plan along with Change A of Issue A.2 in the Compliance Plan, which addressed items of noncompliance, did not clearly define and describe the current method of tank volume determination, and consequently was not consistent with the commitment specified in Section 4.1.1 of the FNMC Plan. Therefore, these wording changes have been requested, and no other modifications or changes in equipment or practices are involved.

ENVIRONMENTAL REVIEW lssuanco of an amendment to Certificate of Compliance GDP-1 to revise the FNMC plan and the Compliance Plan on the tank volume determination is subject to the categorical exclusion provided in 10 CFR 51.22(c)(19). Therefore, neither an environmental assessment nor an environmental impact statement is warranted for this action.

~

9706230222 970612 PDR ADOCK 07007001 C PDR

i l

1-l

. 2 l

CONCLUSION

! The staff concludes that the proposed wording changes to the FNMC Plan and the Compliance l

Plan will be consistent witis a longstanding and acceptable method of volume determination and do not decrease the effectiveness of the facility's safeguards program. The staff recommends that the revised changes be approved.

I The Operations Branch (FCOB) and Region 111 inspection staffs have no objection to this proposed action.

Princioal Contributor I Thomas N. Pham l

l DISTRIBUTION: (Control No. 090M)

Docket 70-7001 PUBLIC NRC File Center Region Ill SPB R/F FCSS R/F NMSS R/F FCOB PHiland, Rlli KO'Brien, Rlli G:\CER6. PAD

  • See previous concurrence OFC *FCLB E *SPB E *SPB C SP87 , SPB ,

NAME TPhamlij DHoadley MHorn /MIItin RPit t!on DATE 6/3/97 6/4/97 6/3/97 6/f /97 6/ l, /97 C = COVER E = COVER & ENCLOSURE N = NO COPY ,

OFFICIAL RECORD COPY

l

, 2 N.. I CGhlCLUSION

)

The staff udes that the proposed wording chang to the FNMC Plan and the Compliance Plan provide t onsistency with a longstanding d acceptable method in volume determination and t decrease the effectiv ess of the facility's safeguards program. The i staff recommends that th vised changes approved.  !

l The Operations Branch (FCOB) an gion 111 inspection staffs have no objection to this l l proposed action. l l Principal Contributor i Thomas N. Pham i

l I

i

)

DISTRIBUTION: (Control No. 090M)

Docket 70-7001 PUBLIC NRC File Center Region lli SPB R/F FCSS R/F NMSS R/F FCOB PHiland, Rlli KO'Brien, Rlll G:\CER6. PAD OFC FCLB y E SPhj (, SPB SPB SPB NAME TPha#n hij j hdley MS$$ DMartin RPierson DATE 6/ 0] /97 6/ k /97 6/ 3 /97 6/ /97 6/ /97 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY l