|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211D1001999-08-20020 August 1999 Notification of 990908 Meeting with Util to Discuss Status of Limerick & Peach Bottom Licensing Issues.Meeting Held in Rockville,Md ML20210G6161999-07-28028 July 1999 Notification of Significant Licensee Meeting 99-44 with Util on 990812 to Discuss Results of NRC Plant Performance Review of Beach Bottom Atomic Power Station Issued on 990409 ML20212H9491999-06-23023 June 1999 Forwards Draft Request for Addl Info Re PECO Request to Reduce re-insp Frequency of Certain Core Shroud Welds for Pbaps,Unit 3.RAI Transmitted by Facsimile on 990623 to J Hufnagel as follow-up to 990621 Telcon ML20206U2041999-05-19019 May 1999 Informs That Attached Request for Addl Info Transmitted by Facsimile on 990519 to T Loomis of Licensee Staff.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20205J3551999-03-16016 March 1999 Forwards Request for Addl Info Re GL 95-05, Periodic Verification of Motor-Operated Valves ML20155G7751998-11-0404 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Limerick Generating Station,Units 1 & 2 & Peach Bottom Atomic Power Station,Units 2 & 3 Ampacity Validation Analyses ML20155G5931998-11-0303 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Plant,Units 2 & 3 Design Basis for Pumps Net Positive Suction Head.Agenda Encl ML20153B9721998-09-14014 September 1998 Requests Publication in Biweekly Fr Notice for Notice of Issuance of Amend 9 to License DPR-12 ML20153E3601998-09-0303 September 1998 Forwards Certified License Application for DA Buckley as Stated in Note Section of Memo Sent 980825 ML20248H8201998-06-0404 June 1998 Requests That Attached Copy of Peach Bottom Unit 1 Updated FSAR Be Made Available for Public Review Until Jul 1998 in Lpdr.Nrc Planning to Hold Public Meeting on 980629 in Delta, Pa.W/O Encl ML20248D6351998-05-29029 May 1998 Forwards Signed Original of Fr Notice for Transmittal to Ofc of Fr for Publication ML20216C4271998-04-17017 April 1998 Notification of 980521 Meeting W/Peco Energy Co in King of Prussia,Pennsylvania to Discuss Reactor Feed Pump Trip Operability & Core Spray Pump Foreign Matl Exclusion - Predecisional Enforcement Conference ML20216C9251998-04-0707 April 1998 Forwards Exam Rept W/As Given Written Exam for Test Administered on 970922-26 at Facility ML20236N4201998-01-30030 January 1998 Forwards NMSS Items of Interest for Wk Ending 980130.Items Include Meeting W/Ge on 980121,insp at Amersham on 980122-23,US EPA Meeting on 980122 to Discuss Groundwater C/A Program at Church Rock & Visit to Flawtech on 980122 ML20211A5361997-09-12012 September 1997 Notification of 970915 Meeting W/Util in North Bethesda,Md to Discuss Plant ECCS Pump Suction Strainer Mod Issues ML20210K3001997-08-15015 August 1997 Notification of 970820 Meeting W/Util in North Bethesda,Md to Discuss Plants Project Mgt Issues Including Planned TSs Submittals & Generic Licensing Issue Status ML20151L7771997-08-0101 August 1997 Notification of Meeting W/Peco Energy Co on 970805 in Rockville,Md to Discuss Plans & Schedules for Resolving thermo-lag Fire Barrier Issues at Mentioned Plants IR 05000277/19970991997-07-21021 July 1997 Notification of Significant Licensee Meeting 97-85 W/Util on 970729 in Delta,Pa to Discuss SALP for Period Covering 951015-970606,as Documented in NRC SALP Repts 50-277/97-99 & 50-278/97-99 ML20148F7201997-05-30030 May 1997 Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs ML20138D9521997-04-25025 April 1997 Forwards Background Document Re Station Blackout Issues, Provided by Licensee,In Response to Unresolved Insp Items Noted in Insp Repts 50-277/96-06,50-278/96-06 & 50-277/96-07 & 50-278/96-07 ML20236N0521997-04-0909 April 1997 Forwards TIA Response by NRR Re Scope of Channel Functional Testing Required by Plant TSs ML20137G7241997-03-25025 March 1997 Corrects Notification of 970414 Meeting W/Util in Bethesda, MD to Discuss Util Plans & Schedules for Resolution of Thermo-Lag Fire Barrier Issues at Plants ML20136G5821997-03-14014 March 1997 Notification of 970410 Meeting W/Util in North Bethesda,Md to Discuss Util Plan to Build Spent Fuel Dry Storage Facility at Plant,Units 1 & 2 ML20136G0391997-03-13013 March 1997 Notification of 970414 Meeting W/Util in North Bethesda,Md to Discuss PECO Plans & Schedules for Resolution of Thermo Lag Fire Barrier Issues at Peach Bottom & Limerick ML20138L8021997-02-19019 February 1997 Forwards Background Documents Re Channel Functional Test Technical Interface Agreement for Plant,Units 1 & 2 ML20236M9831997-02-18018 February 1997 Forwards TIA Response to 961030 Region I Request to Review Issue Related to Scope of Channel Functional Testing Required by Ts.Memo Supersedes Memo ML20236M9241997-01-30030 January 1997 Forwards TIA Response to 961030 Region I Request to Review Issue Re Scope of Channel Functional Testing Required by TS ML20236M0571996-12-0303 December 1996 Responds to 961126 Note Requesting Written Interpretation of TS for Plant,Units 2 & 3.Specifically,under What Plant Conditions,Including Reference to DG Testing Conditions,Sr 3.8.1.17 Must Be Met ML20134N0011996-11-19019 November 1996 Notification of Significant Licensee Meeting 96-106 W/Util on 961206 to Discuss Interactions That Were Introduced During Prior Modifications,Between Emergency Diesel Generators & Associated Residual Heat Removal Sys Pumps ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129H4641996-10-31031 October 1996 Notification of Significant Licensee Meeting 96-106 & 96-346 W/Util on 961211 to Discuss Interactions That Were Introduced During Prior Mods,Between Emergency DG & Associated RHR Sys Pumps ML20129H3881996-10-31031 October 1996 Notification of Significant Licensee Meeting 96-105 W/Util on 961115 to Address Maint Rule Implementation Issues at Peach Bottom as Identified in Maint Rule Team Insp 50-277/96-07 & 50-278/96-07 ML20129H9551996-10-30030 October 1996 Notification of Peach Bottom full-participation Exercise Scheduled for 961119 on Site.Forwards Lodging Arrangements, Roster Assignments & Schedule of Key Events ML20129B5541996-10-18018 October 1996 Notification of 961025 Meeting W/Util in Delta,Pa to Discuss Status of Open & Planned Licensing Actions for Pbaps,Units 2 & 3 & Limerick Generating Station,Units 1 & 2 ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag IR 05000227/20030301995-03-0606 March 1995 Discusses Pse&G Intent to Perform Organization Effectiveness Review During 950227-0330.Telcon of 950306 Between T Martin & L Eliason to Discuss Objectives,Scope & Depth,Methodology & Plan Also Discussed NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20058E4131993-12-0101 December 1993 Notification of Significant Licensee Meeting 93-290 W/Util on 931210 Re Enforcement Conference Concerning Licensee Failure to Comply W/Radiation Area Control Procedures ML20059F8771993-10-28028 October 1993 Notification of 931103 Meeting W/Util in Rockville,Md Re Results of Core Shroud Insp at Plant ML20057F8771993-10-14014 October 1993 Notification of 931103 Meeting W/Util in Rockville,Md to Discuss Certain Cost Beneficial Licensing Actions ML20056G0561993-08-26026 August 1993 Notification of 930902 Meeting W/Util in Rockville,Md to Discuss Planned Installation of Certain Analog to Digital Retrofit Modifications During Refueling Outage Scheduled to Begin 930918 ML20056E0461993-08-17017 August 1993 Notification of 930824 Meeting W/Util in Rockville,Md to Discuss Control & Maint Qualifications & License Status for Lsros to Fuel Handling Licensed at Pbaps,Units 2 & 3 & LGS, Units 1 & 2 ML20236K8531993-04-16016 April 1993 Responds to 930212 Note Re Operability Issues During Lsft. Based on Review of Info Provided Re IR 50-277/92-32 Agree That Licensee Does Not Conform to Guidance in GL 91-18 ML20128P5341993-02-19019 February 1993 Notification of 930225 Meeting W/Util in Wayne,Pa to Discuss Evaluation for Conversion to 24-month Fuel Cycle from Current 18-month Period ML20128P5561993-02-12012 February 1993 Notification of Significant Licensee Meeting 93-19 W/Util on 930226 to Discuss QA Change Request for Facilities ML20128K2651993-02-11011 February 1993 Notification of 930222 Meeting W/Util in Rockville,Md to Discuss Planned Mod to on-site Power Distribution Sys at Plant ML20128H0421993-02-0909 February 1993 Forwards Proprietary Rev 0 to PED-18-0389, PECO Peach Bottom 2 & 3 Nuclear Power Plants...Mg Set Missile Generation Study, for Use in Review of ABWR Ssar.Encl Withheld ML20127F3901992-12-31031 December 1992 Notification of 930120 Peach Bottom SALP Mgt Meeting 92-186 on 930120 in Delta,Pa to Present NRC Assessment of Util Performance for Period 910804 - 921031 ML20127L0861992-12-29029 December 1992 Notification of Significant Licensee Meeting 92-188 on 930107 in King of Prussia,Pa to Discuss Common Emergency Plan for Plants ML20126B4721992-12-10010 December 1992 Notification of Significant Licensee Meeting 92-180 W/Util on 921218 to Discuss Needs Program.Meeting Closed to Public Due to Sensitive Personnel Related Issues 1999-08-20
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211D1001999-08-20020 August 1999 Notification of 990908 Meeting with Util to Discuss Status of Limerick & Peach Bottom Licensing Issues.Meeting Held in Rockville,Md ML20210G6161999-07-28028 July 1999 Notification of Significant Licensee Meeting 99-44 with Util on 990812 to Discuss Results of NRC Plant Performance Review of Beach Bottom Atomic Power Station Issued on 990409 ML20212H9491999-06-23023 June 1999 Forwards Draft Request for Addl Info Re PECO Request to Reduce re-insp Frequency of Certain Core Shroud Welds for Pbaps,Unit 3.RAI Transmitted by Facsimile on 990623 to J Hufnagel as follow-up to 990621 Telcon ML20206U2041999-05-19019 May 1999 Informs That Attached Request for Addl Info Transmitted by Facsimile on 990519 to T Loomis of Licensee Staff.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20205J3551999-03-16016 March 1999 Forwards Request for Addl Info Re GL 95-05, Periodic Verification of Motor-Operated Valves ML20155G7751998-11-0404 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Limerick Generating Station,Units 1 & 2 & Peach Bottom Atomic Power Station,Units 2 & 3 Ampacity Validation Analyses ML20155G5931998-11-0303 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Plant,Units 2 & 3 Design Basis for Pumps Net Positive Suction Head.Agenda Encl ML20153B9721998-09-14014 September 1998 Requests Publication in Biweekly Fr Notice for Notice of Issuance of Amend 9 to License DPR-12 ML20153E3601998-09-0303 September 1998 Forwards Certified License Application for DA Buckley as Stated in Note Section of Memo Sent 980825 ML20248H8201998-06-0404 June 1998 Requests That Attached Copy of Peach Bottom Unit 1 Updated FSAR Be Made Available for Public Review Until Jul 1998 in Lpdr.Nrc Planning to Hold Public Meeting on 980629 in Delta, Pa.W/O Encl ML20248D6351998-05-29029 May 1998 Forwards Signed Original of Fr Notice for Transmittal to Ofc of Fr for Publication ML20216C4271998-04-17017 April 1998 Notification of 980521 Meeting W/Peco Energy Co in King of Prussia,Pennsylvania to Discuss Reactor Feed Pump Trip Operability & Core Spray Pump Foreign Matl Exclusion - Predecisional Enforcement Conference ML20216C9251998-04-0707 April 1998 Forwards Exam Rept W/As Given Written Exam for Test Administered on 970922-26 at Facility ML20236N4201998-01-30030 January 1998 Forwards NMSS Items of Interest for Wk Ending 980130.Items Include Meeting W/Ge on 980121,insp at Amersham on 980122-23,US EPA Meeting on 980122 to Discuss Groundwater C/A Program at Church Rock & Visit to Flawtech on 980122 ML20211A5361997-09-12012 September 1997 Notification of 970915 Meeting W/Util in North Bethesda,Md to Discuss Plant ECCS Pump Suction Strainer Mod Issues ML20210K3001997-08-15015 August 1997 Notification of 970820 Meeting W/Util in North Bethesda,Md to Discuss Plants Project Mgt Issues Including Planned TSs Submittals & Generic Licensing Issue Status ML20151L7771997-08-0101 August 1997 Notification of Meeting W/Peco Energy Co on 970805 in Rockville,Md to Discuss Plans & Schedules for Resolving thermo-lag Fire Barrier Issues at Mentioned Plants IR 05000277/19970991997-07-21021 July 1997 Notification of Significant Licensee Meeting 97-85 W/Util on 970729 in Delta,Pa to Discuss SALP for Period Covering 951015-970606,as Documented in NRC SALP Repts 50-277/97-99 & 50-278/97-99 ML20148F7201997-05-30030 May 1997 Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs ML20138D9521997-04-25025 April 1997 Forwards Background Document Re Station Blackout Issues, Provided by Licensee,In Response to Unresolved Insp Items Noted in Insp Repts 50-277/96-06,50-278/96-06 & 50-277/96-07 & 50-278/96-07 ML20236N0521997-04-0909 April 1997 Forwards TIA Response by NRR Re Scope of Channel Functional Testing Required by Plant TSs ML20137G7241997-03-25025 March 1997 Corrects Notification of 970414 Meeting W/Util in Bethesda, MD to Discuss Util Plans & Schedules for Resolution of Thermo-Lag Fire Barrier Issues at Plants ML20136G5821997-03-14014 March 1997 Notification of 970410 Meeting W/Util in North Bethesda,Md to Discuss Util Plan to Build Spent Fuel Dry Storage Facility at Plant,Units 1 & 2 ML20136G0391997-03-13013 March 1997 Notification of 970414 Meeting W/Util in North Bethesda,Md to Discuss PECO Plans & Schedules for Resolution of Thermo Lag Fire Barrier Issues at Peach Bottom & Limerick ML20138L8021997-02-19019 February 1997 Forwards Background Documents Re Channel Functional Test Technical Interface Agreement for Plant,Units 1 & 2 ML20236M9831997-02-18018 February 1997 Forwards TIA Response to 961030 Region I Request to Review Issue Related to Scope of Channel Functional Testing Required by Ts.Memo Supersedes Memo ML20236M9241997-01-30030 January 1997 Forwards TIA Response to 961030 Region I Request to Review Issue Re Scope of Channel Functional Testing Required by TS ML20236M0571996-12-0303 December 1996 Responds to 961126 Note Requesting Written Interpretation of TS for Plant,Units 2 & 3.Specifically,under What Plant Conditions,Including Reference to DG Testing Conditions,Sr 3.8.1.17 Must Be Met ML20134N0011996-11-19019 November 1996 Notification of Significant Licensee Meeting 96-106 W/Util on 961206 to Discuss Interactions That Were Introduced During Prior Modifications,Between Emergency Diesel Generators & Associated Residual Heat Removal Sys Pumps ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129H4641996-10-31031 October 1996 Notification of Significant Licensee Meeting 96-106 & 96-346 W/Util on 961211 to Discuss Interactions That Were Introduced During Prior Mods,Between Emergency DG & Associated RHR Sys Pumps ML20129H3881996-10-31031 October 1996 Notification of Significant Licensee Meeting 96-105 W/Util on 961115 to Address Maint Rule Implementation Issues at Peach Bottom as Identified in Maint Rule Team Insp 50-277/96-07 & 50-278/96-07 ML20129H9551996-10-30030 October 1996 Notification of Peach Bottom full-participation Exercise Scheduled for 961119 on Site.Forwards Lodging Arrangements, Roster Assignments & Schedule of Key Events ML20129B5541996-10-18018 October 1996 Notification of 961025 Meeting W/Util in Delta,Pa to Discuss Status of Open & Planned Licensing Actions for Pbaps,Units 2 & 3 & Limerick Generating Station,Units 1 & 2 ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag IR 05000227/20030301995-03-0606 March 1995 Discusses Pse&G Intent to Perform Organization Effectiveness Review During 950227-0330.Telcon of 950306 Between T Martin & L Eliason to Discuss Objectives,Scope & Depth,Methodology & Plan Also Discussed NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20058E4131993-12-0101 December 1993 Notification of Significant Licensee Meeting 93-290 W/Util on 931210 Re Enforcement Conference Concerning Licensee Failure to Comply W/Radiation Area Control Procedures ML20059F8771993-10-28028 October 1993 Notification of 931103 Meeting W/Util in Rockville,Md Re Results of Core Shroud Insp at Plant ML20057F8771993-10-14014 October 1993 Notification of 931103 Meeting W/Util in Rockville,Md to Discuss Certain Cost Beneficial Licensing Actions ML20056G0561993-08-26026 August 1993 Notification of 930902 Meeting W/Util in Rockville,Md to Discuss Planned Installation of Certain Analog to Digital Retrofit Modifications During Refueling Outage Scheduled to Begin 930918 ML20056E0461993-08-17017 August 1993 Notification of 930824 Meeting W/Util in Rockville,Md to Discuss Control & Maint Qualifications & License Status for Lsros to Fuel Handling Licensed at Pbaps,Units 2 & 3 & LGS, Units 1 & 2 ML20236K8531993-04-16016 April 1993 Responds to 930212 Note Re Operability Issues During Lsft. Based on Review of Info Provided Re IR 50-277/92-32 Agree That Licensee Does Not Conform to Guidance in GL 91-18 ML20128P5341993-02-19019 February 1993 Notification of 930225 Meeting W/Util in Wayne,Pa to Discuss Evaluation for Conversion to 24-month Fuel Cycle from Current 18-month Period ML20128P5561993-02-12012 February 1993 Notification of Significant Licensee Meeting 93-19 W/Util on 930226 to Discuss QA Change Request for Facilities ML20128K2651993-02-11011 February 1993 Notification of 930222 Meeting W/Util in Rockville,Md to Discuss Planned Mod to on-site Power Distribution Sys at Plant ML20128H0421993-02-0909 February 1993 Forwards Proprietary Rev 0 to PED-18-0389, PECO Peach Bottom 2 & 3 Nuclear Power Plants...Mg Set Missile Generation Study, for Use in Review of ABWR Ssar.Encl Withheld ML20127F3901992-12-31031 December 1992 Notification of 930120 Peach Bottom SALP Mgt Meeting 92-186 on 930120 in Delta,Pa to Present NRC Assessment of Util Performance for Period 910804 - 921031 ML20127L0861992-12-29029 December 1992 Notification of Significant Licensee Meeting 92-188 on 930107 in King of Prussia,Pa to Discuss Common Emergency Plan for Plants ML20126B4721992-12-10010 December 1992 Notification of Significant Licensee Meeting 92-180 W/Util on 921218 to Discuss Needs Program.Meeting Closed to Public Due to Sensitive Personnel Related Issues 1999-08-20
[Table view] |
Text
15 00T 1988 Docket Nos. 50-277 50-278 MEMORANDUM FOR: William F. Kane, Director, Division of Reactor Prw acts FROM: J. C. Linville, Chief, Reactor Projects Section 2.,
SUBJECT:
PEACH BOTTOM ATOMIC POWER STATION STATUS REPORT FOR THE PERICO OCTOBER 3 TO OCTOBER 19, 1988 Enclosed is the Peach Bottom periodic status report froa .ne NRC Resident Office at Peach Bottom. Three NRC resident inspectors monitored activities at the plant during the report period.
These status reports are intended to provide NRC management and the public with an overview of plant activities and NRC inspection activities.
Subsequent inspection reports will address many of these topics in more detail.
f%f t'M
[JnesC.Lnvlille,Ch/f
/
(, 7 actor Drojects Sect (4n 2A
Enclosure:
As Stated 0FFICIAL RECORD COPY PB STATUS REPORT - 0001.0.0 ;
G31101o423 gg g g s, MW j
- w awen owogy f( o;n ,
William F. Kane 2 25 00T 1988 L cc w/ enc 1:
C. A. McNeill, Executive Director, Nuclear John S' Kemper, Sr., Senior Vice President-Nuclear Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station J. F. Franz, Plant Manager J. W. Gallagher, Vice President, Nuclear Services E. C. Kistner, Chairman, Ni!: lear Review Board Troy B. Conner, Jr., Esqvsre Jack Urban, General Manager, Fuels Department, Delmarva Power W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric B. W. Gorman, Manager - External Affairs, PSE&G Eugene J. Bradley, Esquire, Assistant General Counsel Raymond L. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations W. M. Alden, Ofrector, Licensing Section Doris Poulsen Secretary of Harford County Council Dane Honan Public Document Room (POR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector Commonwealth of Pennsylvania bec w/or.cis:
Region I Docket Room (with concurrencos)
J. Yrilcr, E00 T. Mu,qey, NRR F. Miraglia, NRR S. Varga, NRR B. Beger, NRR W. Gutler, NRR R. Martin, NRR V. Russell, RI B. Clayton, E00 W. Johnston, RI T. Martin, RI S. Collins, RI R. Gallo, RI K. Abraham, RI M. Miller, RI
- J. Williams, RI S
RI:0RP[(h Linv111 rh1 W nzinger 10/pl /88 10/p8 0FFICIAL RECORD COPY PB STATUS REPORT - 0002.0.0 10/21/88
ENCLOSURE PEACH BOTTOM ATOMIC POWER STATION STATUS REPORT 9 THE PERIOD October 3 - 19, 1988 1.0 Plant Status As of 8:00 a.m. on October 19, 1988, Units 2 and 3 are in a cold condition per the March 31, 1987, NRC Order with coolant temperatures less than 212 degrees Fahrenheit. The Unit 3 core is completely off loaded into the spent fuel pool.
2.0 Facility Operations Summary Unit 2 is in day 586 of its seventh refueling outage that beg, 4.ch 13, 1987. Unit 2 maintenance repair work is in progress on plant systems required for restart. Fourteen of fifty Unit 2 system windows are closed and turned over to operations. The Unit 2 reactor pressura vessel hydrostatic test is the next critical path item. Unit 3 is in day 385 of its seventh refueling outage that began October 1, 1987. Unit 3 maintenance and modification work is underway on 27 of 55 plant systems.
3.0 Items of Special Interest 3.1 IN" conducted a corporate evaluation during the period October 3 through 7, 1988. INPO provided the licensee with the results of their overall assessment at an exit meeting with the licensee on October 17, 1988, 3.2 On October 5, 1988, the NRC Commissioners held a meetir; at Rockville, Maryland, to review tha status of Peach Bott ,m.
Representatives from both the Philadelphia Electric Company and the NRC staff briefed the NRC Commissioners, i 4.0 Other Items of Interes+.
4.1 In a letter dated October 5, 1988, Philadelphia Electric Company reported that the Peach Bottom Restart Plan corrective actions are complete.
4.2 In a letter dated October 12, 1988, Pn11adelphia Electric Company -
submitted the report on their Restart Review Panel's Assessment of Readiness for Restart. The NRC is currently reviewing this .
document.
E
- ' .o
. - . s l
1 4.3 The licensee commenced additional licensed operator training on the Peach Bottom simulator in Columbia, Maryland, on October 3, 1988.
Each shift crew is receiving a week of simulator training prior to crew evaluations that will be conducted by INP0 and NRC in November 1988.
5.0 NRC Activities During the Period 5.1 Three NRC Resident Inspectors and a regional inspector were assigned to monitor plant activities between October 3 and 19, 1988. These individuals consisted of the following:
Thomas P. Johnson - Senior Resident Inspector Richard J. Urban - Resident Inspector Larry E. Myers - Resident Inspector J. H. Williams - Project Engineer Areas inspected included operational safety, shutdown order commitments, radiation protection, physical security, control room activities and demeanor, reportable events, surveillance testing, outage activities, maintenance, and outstanding items.
5.2 One NRC specialist was on site during the peri October 3 through 7, 1988, to review the fire protection program. The results of this inspection will be the subject of a future NRC inspection report.
5.3 Two specialist inspect. ion reports were received durino the period.
An inspection report (50-277/88-33; 50-278/88-33) concerning the radioactive effluent controls program was issued on October 6,1988.
, The inspection was canducted from September 6 to 9, 1988. No violations were identified.
An inspection report (50-277/88-17; 50-278/88-17) detailing the results of the specisl maintenance team inspectica w., is:Jed or, October 11, 1983. The inspection was conducted from July 11 to July l 22, 1988. Four violations of minor significance were issued, 5.4 William F. Kane, Director, Division of Reactor Projects, and James C. Linville, Chief, Reactor Projects Section 2A, were on site October 5, 1983. These NRC managcment personnel toured the cor, trol room.
3