November 19, 1996 REVISION No.96-106 l
U.S. NUCLEAR REGULATORY COMMISSION REGION I l
l NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:
PECO Energy Facility:
Peach Bottom Atomic Power Station i
l Docket Nos.:
50-277 & 50-278 Time and Date:
10:00 a.m., Friday, December 6,1996 Location:
NRC Region i 475 Allendale Rd.
King of Prussia, PA 19406 j
Public Meeting Room
Purpose:
Predecisional Enforcement Conference to discuss interactions that were introduced during prior modifications, between emergency diesel generators and associated residual heat removal system pumps.
NRC Attendees:
H. Miller, Regional Administrator, NRC Region I R. Crienjak, Acting Deputy Director, Division of Reactor Projects (DRP)
R. Blough, Deputy Director, Division of Reactor Safety (DRS)
W. Pasciak, Chief, Projects Branch 4, ' IP W. Ruland, Chief, Electrical Engineering iJranch, DRS W. Schmidt, Senior Resident inspector, Peach Bottom, DRP R. Lorson, Resident inspector, Peach Bottom, DRP P. Swetland, Project Engineer, DRP J. Stolz, Director, Project Directorate 1-2, Office of Nuclear Reactor Regulation (NRR)
J. Shea, Project Manager, Peach Bottom, NRR Licensee Attendees: D. Smith, President, PECO Nuclear G. Edwards, Plant Manager, Peach Bottom, PECO Nuclear G. HL nger, Director, Licensing, PECO Nuclear M. W srner, Director, Site Engineering, PECO Nuclear P. Da rison, Site Engineering Supervisor, PECO Nuclear Note: This meeting is closad to the public. Attendance by additional NRC personnel, including handicapped persons requiring assistance, should be made know December 1,1996, via telephone call to Walt Pasciak at (610) 337-5258.
,b Woc Approved By
- Walter J. Pasfy, Chief Projects Branctf 4
.?G0 m Division of Reactor Projects 9611260117 961119 PDR ADOCK 05000277 l
G PDR l
4 l
2 4
1 I
Distribution:
j D. Smith, President, PECO Nuclear T. Mitchell, Vice President, Peach Bottom, PECO Nuclear j'
PUBLIC j-Commonwealth of Pennsylvania l
Regional Administrator Secretary, RI l
DRP Division Secretary, RI DRS Division Secretary, RI i
DRM Division Secretary, RI DNMS Division Secretary, RI Region i Receptionist K. Gallagher, DRP Distribution (Via E-Maill:
J. Taylor, Executive Director for Operations j
J. Milhoan, Deputy Executive Director for Nuclear Reactor Regulation, i
. Regional Operations'and Research (DEDR)
H. Thompson, Deputy Executive Director for Nuclear Material Safety, Safeguards l
and Operations Support (DEDS)
{
D. Matthews, Acting Deputy Director, Division of Reactor Program Management, NRR
' R. Spessard, Director, Division of Technical Support, NRR J. Lieberman, Director, Office of Enforcement
]
S. Lewis, Office of General Counsel (OGC) i F. Miraglia, Acting Director, Office of Nuclear Reactor Regulation A. Thadani, Associate Director for inspection and Technical Assessment, NRR R. Zimmerman, Associate Director for Projects, NRR S. Varga, Director, Division of Reactor Projects - l/ll, NRR
.W. Dean, Regional Coo dinator, OEDO N. Green, Jr., Policy Deviilopment & Technical Support Branch D. Screnci, Public Affaire Officer, RI, PAO, RI N. Sheehan, Field Public Affairs Officer, RI M. Campion, ORA D. Chawaga, ORA J. Stolz, Director, PDI-2, NRR J. Shea, PM, PDI-2, NRR DOCUMENT NAME: a:\\1 06.pb To receive a copy of this documeryt, ete in the boa: "C" = Copyhout attachment / enclosure "E" = Copy with attachment / enclosure "N* = No copy
'/.
g
)
OFFICE RI:DRP,J (// f lC Rl:DRP [@ '
C l
NAME PSwetland /*
WPasciak N DATE 11/ ff9'6 11/(t/96 OFFICIAL RECORD COPY t
) 0
/
.