ML20129H388

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting 96-105 W/Util on 961115 to Address Maint Rule Implementation Issues at Peach Bottom as Identified in Maint Rule Team Insp 50-277/96-07 & 50-278/96-07
ML20129H388
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/31/1996
From: Pasciak W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
96-370, EA-96-370, NUDOCS 9611050212
Download: ML20129H388 (2)


See also: IR 05000277/1996007

Text

. _ _ _

.

_

__ - , _ _ _ _ _ _ _ . _ . _ _ . _ _ _ _ .

_ _ _ _ _ . .

_ _ __ _ _.

_

October 31,1996

No.96-105

EA No.96-370

7

i

U.S. NUCLEAR REGULATORY COMMISSION

l

REGION I

I

NOTICE OF SIGNIFICANT LICENSEE MEETING

Licensee:

PECO Energy

i

Facility:

Peach Bottom Atomic Power Station

l

Docket Nos.:

50-277 & 50-278

Time and Date:

9:00 a.m., Friday, November 15,1996

Location:

NRC Region 1

475 Allendale Rd.

l

King of Prussia, PA 19406

l

Public Meeting Room

l

Purpose:

Predecisional Enforcement Conference to address maintenance

'

rule implementation issues at Peach Bottom as identified in

Maintenance Rule Team inspection (Inspection Report 50-277

l

& 50-278/96-07).

j

l

NRC Attendees:

H. Miller, Regional . Administrator, NRC Region 1

J. Wiggins, Director, Division of Reactor Safety (DRS)

R. Cooper, Director, Division of Reactor Projects (DRP)

l

,

j

W. Pasciak, Chief, Projectc Branch 4, DRP

G. Meyer, Chief, Operator Licensing / Human Performance

]

Branch, DRS

W. Schmidt, Senior Resident inspector, Peach Bottom, DRP

R. Lorson, Resident inspector, Peach Bottom, DRP

i

l

J. Stolz, Director, Project Directorate 1-2, Office of Nuclear

Reactor Regulation (NRR)

'

J. Shea, Project Manager, Peach Bottom, NRR

,

S. Black, Chief, Quality Assurance / Maintenance Branch, NRR

i

R. Correia, Chief, Maintenance Section, NRR

l

Licensee Attendees:

D. Smith, President, PECO Nuclear

G. Rainey, Senior VP, Nuclear Operations, PECO Nuclear

'

T. Mitchell, Vice President, Peach Bottom, PECO Nuclear

G. Edwards, Plant Manager, Peach Bottom, PECO Nuclear

.

G. Hunger, Director, Licensing, PECO Nuclear

,

l

l

Note: This meeting is closed to the public. Attendance by additional NRC personnel,

j

including handicapped persons requiring assistance, should be

ad

nm by November

12,1996, via telephone call to Walt Pasciak at (610) 337-5

8

j

Approved By:

//

~ /uM'

' fgt/g g;

roject,J Pasciak', Chief

site'r

<

Branch 4

-

Divi l' n of Reactor Projects

9611050212 961031

P

7

PDR

ADOCK 05000277

G

PDR

!

I

-

._

-

- . .

<

_

_

Distribution:

4

D. Smith, President, PECO Nuclear

l

T. Mitchell, Vice President, Peach Bottom, PECO Nuclear

PUBLIC

,

Commonwealth of Pennsylvania

'

Regional Administrator Secretary, Rt

DRP Division Secretary, RI

DRS Division Secretary, RI

DRM Division Secretary, RI

DNMS Division Secretary, RI

Region i Recertionist

K. Gallagher, DRP

1

l

!

!

!

l