|
---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20211D1001999-08-20020 August 1999 Notification of 990908 Meeting with Util to Discuss Status of Limerick & Peach Bottom Licensing Issues.Meeting Held in Rockville,Md ML20210G6161999-07-28028 July 1999 Notification of Significant Licensee Meeting 99-44 with Util on 990812 to Discuss Results of NRC Plant Performance Review of Beach Bottom Atomic Power Station Issued on 990409 ML20212H9491999-06-23023 June 1999 Forwards Draft Request for Addl Info Re PECO Request to Reduce re-insp Frequency of Certain Core Shroud Welds for Pbaps,Unit 3.RAI Transmitted by Facsimile on 990623 to J Hufnagel as follow-up to 990621 Telcon ML20207F2731999-05-25025 May 1999 Notification of 990609 Meeting with PECO Energy in Linfield, Pennsylvania to Discuss Results of Plant Performance Review of Limerick Issued on 990409 ML20206U2041999-05-19019 May 1999 Informs That Attached Request for Addl Info Transmitted by Facsimile on 990519 to T Loomis of Licensee Staff.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20205F9901999-04-0202 April 1999 Notification of 990419 Meeting with Util in Rockville,Md to Discuss Schedule for Completion of Installation of Fire Barriers at Plant ML20205J3551999-03-16016 March 1999 Forwards Request for Addl Info Re GL 95-05, Periodic Verification of Motor-Operated Valves ML20196J9851998-12-0808 December 1998 Notification of 981218 Meeting with Util in Rockville,Md to Plant Licensing Issues ML20155G7751998-11-0404 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Limerick Generating Station,Units 1 & 2 & Peach Bottom Atomic Power Station,Units 2 & 3 Ampacity Validation Analyses ML20155G5931998-11-0303 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Plant,Units 2 & 3 Design Basis for Pumps Net Positive Suction Head.Agenda Encl ML20153B9721998-09-14014 September 1998 Requests Publication in Biweekly Fr Notice for Notice of Issuance of Amend 9 to License DPR-12 ML20153E3601998-09-0303 September 1998 Forwards Certified License Application for DA Buckley as Stated in Note Section of Memo Sent 980825 ML20248H8201998-06-0404 June 1998 Requests That Attached Copy of Peach Bottom Unit 1 Updated FSAR Be Made Available for Public Review Until Jul 1998 in Lpdr.Nrc Planning to Hold Public Meeting on 980629 in Delta, Pa.W/O Encl ML20248D6351998-05-29029 May 1998 Forwards Signed Original of Fr Notice for Transmittal to Ofc of Fr for Publication ML20216C4501998-05-12012 May 1998 Notification of 980610 Meeting 98-51 W/Util in King of Prussia,Pa to Discuss Diesel Generator Failure & HPCI Exhaust Valve Failure & RHR Min Flow Valve Predecisional Enforcement Conference ML20216C4271998-04-17017 April 1998 Notification of 980521 Meeting W/Peco Energy Co in King of Prussia,Pennsylvania to Discuss Reactor Feed Pump Trip Operability & Core Spray Pump Foreign Matl Exclusion - Predecisional Enforcement Conference ML20216C4351998-04-15015 April 1998 Notification of 980527 Meeting W/Peco Energy Co in King of Prussia,Pennsylvania to Discuss Diesel Generator Failure & HPCI Exhaust Valve Failure & RHR Min Flow Valve Failure Predecisional Enforcement Conference ML20216C9251998-04-0707 April 1998 Forwards Exam Rept W/As Given Written Exam for Test Administered on 970922-26 at Facility IR 05000352/19980011998-03-0909 March 1998 Forwards NRC Operator Licensing Exam Repts 50-352/98-01 & 50-353/98-01 for Exams Administered on 980120-23 ML20236N4201998-01-30030 January 1998 Forwards NMSS Items of Interest for Wk Ending 980130.Items Include Meeting W/Ge on 980121,insp at Amersham on 980122-23,US EPA Meeting on 980122 to Discuss Groundwater C/A Program at Church Rock & Visit to Flawtech on 980122 ML20211A5361997-09-12012 September 1997 Notification of 970915 Meeting W/Util in North Bethesda,Md to Discuss Plant ECCS Pump Suction Strainer Mod Issues ML20210K3001997-08-15015 August 1997 Notification of 970820 Meeting W/Util in North Bethesda,Md to Discuss Plants Project Mgt Issues Including Planned TSs Submittals & Generic Licensing Issue Status ML20217H1991997-08-0606 August 1997 Forwards Signed Original of Order Prohibiting Involvement in NRC-licensed Activities (Effective Immediately) for Transmittal to Ofc of Fr,For Publication.W/O Encl ML20151L7771997-08-0101 August 1997 Notification of Meeting W/Peco Energy Co on 970805 in Rockville,Md to Discuss Plans & Schedules for Resolving thermo-lag Fire Barrier Issues at Mentioned Plants IR 05000277/19970991997-07-21021 July 1997 Notification of Significant Licensee Meeting 97-85 W/Util on 970729 in Delta,Pa to Discuss SALP for Period Covering 951015-970606,as Documented in NRC SALP Repts 50-277/97-99 & 50-278/97-99 ML20148F7201997-05-30030 May 1997 Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs ML20148E3591997-05-28028 May 1997 Notification of Significant Licensee Meeting 97-62 W/Util on 970602 to Discuss Issues Associated W/Inaccurate Records Relating to Fire Protection & Chemistry Surveillance Results ML20138D9521997-04-25025 April 1997 Forwards Background Document Re Station Blackout Issues, Provided by Licensee,In Response to Unresolved Insp Items Noted in Insp Repts 50-277/96-06,50-278/96-06 & 50-277/96-07 & 50-278/96-07 ML20137Z8141997-04-21021 April 1997 Forwards NRC Approved Operator Licensing Exam (as-given Operating Exam) for Tests Administered on 970120-24 ML20137Z8881997-04-21021 April 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 970120-24 ML20236N0521997-04-0909 April 1997 Forwards TIA Response by NRR Re Scope of Channel Functional Testing Required by Plant TSs ML20137G7241997-03-25025 March 1997 Corrects Notification of 970414 Meeting W/Util in Bethesda, MD to Discuss Util Plans & Schedules for Resolution of Thermo-Lag Fire Barrier Issues at Plants ML20203C0741997-03-17017 March 1997 Discusses OI Rept 1-96-033 Re Alleged Falsification of Fire Protection Surveillance Test Documentation.Requests That OGC Analyze Rept & Determine If Sufficient Evidence for Action. EA-97-115 Assigned to Track Case ML20136G5821997-03-14014 March 1997 Notification of 970410 Meeting W/Util in North Bethesda,Md to Discuss Util Plan to Build Spent Fuel Dry Storage Facility at Plant,Units 1 & 2 ML20136G0391997-03-13013 March 1997 Notification of 970414 Meeting W/Util in North Bethesda,Md to Discuss PECO Plans & Schedules for Resolution of Thermo Lag Fire Barrier Issues at Peach Bottom & Limerick ML20138L8021997-02-19019 February 1997 Forwards Background Documents Re Channel Functional Test Technical Interface Agreement for Plant,Units 1 & 2 ML20236M9831997-02-18018 February 1997 Forwards TIA Response to 961030 Region I Request to Review Issue Related to Scope of Channel Functional Testing Required by Ts.Memo Supersedes Memo ML20236M9241997-01-30030 January 1997 Forwards TIA Response to 961030 Region I Request to Review Issue Re Scope of Channel Functional Testing Required by TS ML20132A8991996-12-12012 December 1996 Forwards Background Document Re Event Rept on Fire Protection Analysis Assumptions for Safety Relief Valve Operation,For Plant,Units 1 & 2 ML20236M0571996-12-0303 December 1996 Responds to 961126 Note Requesting Written Interpretation of TS for Plant,Units 2 & 3.Specifically,under What Plant Conditions,Including Reference to DG Testing Conditions,Sr 3.8.1.17 Must Be Met ML20134N0011996-11-19019 November 1996 Notification of Significant Licensee Meeting 96-106 W/Util on 961206 to Discuss Interactions That Were Introduced During Prior Modifications,Between Emergency Diesel Generators & Associated Residual Heat Removal Sys Pumps ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129H4641996-10-31031 October 1996 Notification of Significant Licensee Meeting 96-106 & 96-346 W/Util on 961211 to Discuss Interactions That Were Introduced During Prior Mods,Between Emergency DG & Associated RHR Sys Pumps ML20129H3881996-10-31031 October 1996 Notification of Significant Licensee Meeting 96-105 W/Util on 961115 to Address Maint Rule Implementation Issues at Peach Bottom as Identified in Maint Rule Team Insp 50-277/96-07 & 50-278/96-07 ML20129H9551996-10-30030 October 1996 Notification of Peach Bottom full-participation Exercise Scheduled for 961119 on Site.Forwards Lodging Arrangements, Roster Assignments & Schedule of Key Events ML20129B5541996-10-18018 October 1996 Notification of 961025 Meeting W/Util in Delta,Pa to Discuss Status of Open & Planned Licensing Actions for Pbaps,Units 2 & 3 & Limerick Generating Station,Units 1 & 2 ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag ML20134K5771995-12-0505 December 1995 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 951113-16 IR 05000227/20030301995-03-0606 March 1995 Discusses Pse&G Intent to Perform Organization Effectiveness Review During 950227-0330.Telcon of 950306 Between T Martin & L Eliason to Discuss Objectives,Scope & Depth,Methodology & Plan Also Discussed ML20149J1451994-12-22022 December 1994 Notification of Significant Licensee Meeting 94-149 W/Util on 950109 in King of Prussia,Pa to Discuss Upcoming Unit 2 Outage & Changes in Health Physics Organization 1999-08-20
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20211D1001999-08-20020 August 1999 Notification of 990908 Meeting with Util to Discuss Status of Limerick & Peach Bottom Licensing Issues.Meeting Held in Rockville,Md ML20210G6161999-07-28028 July 1999 Notification of Significant Licensee Meeting 99-44 with Util on 990812 to Discuss Results of NRC Plant Performance Review of Beach Bottom Atomic Power Station Issued on 990409 ML20212H9491999-06-23023 June 1999 Forwards Draft Request for Addl Info Re PECO Request to Reduce re-insp Frequency of Certain Core Shroud Welds for Pbaps,Unit 3.RAI Transmitted by Facsimile on 990623 to J Hufnagel as follow-up to 990621 Telcon ML20207F2731999-05-25025 May 1999 Notification of 990609 Meeting with PECO Energy in Linfield, Pennsylvania to Discuss Results of Plant Performance Review of Limerick Issued on 990409 ML20206U2041999-05-19019 May 1999 Informs That Attached Request for Addl Info Transmitted by Facsimile on 990519 to T Loomis of Licensee Staff.Review of RAI Would Allow Licensee to Determine & Agree Upon Schedule to Respond to RAI ML20205F9901999-04-0202 April 1999 Notification of 990419 Meeting with Util in Rockville,Md to Discuss Schedule for Completion of Installation of Fire Barriers at Plant ML20205J3551999-03-16016 March 1999 Forwards Request for Addl Info Re GL 95-05, Periodic Verification of Motor-Operated Valves ML20196J9851998-12-0808 December 1998 Notification of 981218 Meeting with Util in Rockville,Md to Plant Licensing Issues ML20155G7751998-11-0404 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Limerick Generating Station,Units 1 & 2 & Peach Bottom Atomic Power Station,Units 2 & 3 Ampacity Validation Analyses ML20155G5931998-11-0303 November 1998 Notification of 981118 Meeting with Util in Rockville,Md to Discuss Plant,Units 2 & 3 Design Basis for Pumps Net Positive Suction Head.Agenda Encl ML20153B9721998-09-14014 September 1998 Requests Publication in Biweekly Fr Notice for Notice of Issuance of Amend 9 to License DPR-12 ML20153E3601998-09-0303 September 1998 Forwards Certified License Application for DA Buckley as Stated in Note Section of Memo Sent 980825 ML20248H8201998-06-0404 June 1998 Requests That Attached Copy of Peach Bottom Unit 1 Updated FSAR Be Made Available for Public Review Until Jul 1998 in Lpdr.Nrc Planning to Hold Public Meeting on 980629 in Delta, Pa.W/O Encl ML20248D6351998-05-29029 May 1998 Forwards Signed Original of Fr Notice for Transmittal to Ofc of Fr for Publication ML20216C4501998-05-12012 May 1998 Notification of 980610 Meeting 98-51 W/Util in King of Prussia,Pa to Discuss Diesel Generator Failure & HPCI Exhaust Valve Failure & RHR Min Flow Valve Predecisional Enforcement Conference ML20216C4271998-04-17017 April 1998 Notification of 980521 Meeting W/Peco Energy Co in King of Prussia,Pennsylvania to Discuss Reactor Feed Pump Trip Operability & Core Spray Pump Foreign Matl Exclusion - Predecisional Enforcement Conference ML20216C4351998-04-15015 April 1998 Notification of 980527 Meeting W/Peco Energy Co in King of Prussia,Pennsylvania to Discuss Diesel Generator Failure & HPCI Exhaust Valve Failure & RHR Min Flow Valve Failure Predecisional Enforcement Conference ML20216C9251998-04-0707 April 1998 Forwards Exam Rept W/As Given Written Exam for Test Administered on 970922-26 at Facility IR 05000352/19980011998-03-0909 March 1998 Forwards NRC Operator Licensing Exam Repts 50-352/98-01 & 50-353/98-01 for Exams Administered on 980120-23 ML20236N4201998-01-30030 January 1998 Forwards NMSS Items of Interest for Wk Ending 980130.Items Include Meeting W/Ge on 980121,insp at Amersham on 980122-23,US EPA Meeting on 980122 to Discuss Groundwater C/A Program at Church Rock & Visit to Flawtech on 980122 ML20211A5361997-09-12012 September 1997 Notification of 970915 Meeting W/Util in North Bethesda,Md to Discuss Plant ECCS Pump Suction Strainer Mod Issues ML20210K3001997-08-15015 August 1997 Notification of 970820 Meeting W/Util in North Bethesda,Md to Discuss Plants Project Mgt Issues Including Planned TSs Submittals & Generic Licensing Issue Status ML20217H1991997-08-0606 August 1997 Forwards Signed Original of Order Prohibiting Involvement in NRC-licensed Activities (Effective Immediately) for Transmittal to Ofc of Fr,For Publication.W/O Encl ML20151L7771997-08-0101 August 1997 Notification of Meeting W/Peco Energy Co on 970805 in Rockville,Md to Discuss Plans & Schedules for Resolving thermo-lag Fire Barrier Issues at Mentioned Plants IR 05000277/19970991997-07-21021 July 1997 Notification of Significant Licensee Meeting 97-85 W/Util on 970729 in Delta,Pa to Discuss SALP for Period Covering 951015-970606,as Documented in NRC SALP Repts 50-277/97-99 & 50-278/97-99 ML20148F7201997-05-30030 May 1997 Forwards Semiannual Status Rept on Fire Protection Task Action Plan & plant-specific Thermo-Lag Correction Action Programs ML20148E3591997-05-28028 May 1997 Notification of Significant Licensee Meeting 97-62 W/Util on 970602 to Discuss Issues Associated W/Inaccurate Records Relating to Fire Protection & Chemistry Surveillance Results ML20138D9521997-04-25025 April 1997 Forwards Background Document Re Station Blackout Issues, Provided by Licensee,In Response to Unresolved Insp Items Noted in Insp Repts 50-277/96-06,50-278/96-06 & 50-277/96-07 & 50-278/96-07 ML20137Z8141997-04-21021 April 1997 Forwards NRC Approved Operator Licensing Exam (as-given Operating Exam) for Tests Administered on 970120-24 ML20137Z8881997-04-21021 April 1997 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal) for Tests Administered on 970120-24 ML20236N0521997-04-0909 April 1997 Forwards TIA Response by NRR Re Scope of Channel Functional Testing Required by Plant TSs ML20137G7241997-03-25025 March 1997 Corrects Notification of 970414 Meeting W/Util in Bethesda, MD to Discuss Util Plans & Schedules for Resolution of Thermo-Lag Fire Barrier Issues at Plants ML20203C0741997-03-17017 March 1997 Discusses OI Rept 1-96-033 Re Alleged Falsification of Fire Protection Surveillance Test Documentation.Requests That OGC Analyze Rept & Determine If Sufficient Evidence for Action. EA-97-115 Assigned to Track Case ML20136G5821997-03-14014 March 1997 Notification of 970410 Meeting W/Util in North Bethesda,Md to Discuss Util Plan to Build Spent Fuel Dry Storage Facility at Plant,Units 1 & 2 ML20136G0391997-03-13013 March 1997 Notification of 970414 Meeting W/Util in North Bethesda,Md to Discuss PECO Plans & Schedules for Resolution of Thermo Lag Fire Barrier Issues at Peach Bottom & Limerick ML20138L8021997-02-19019 February 1997 Forwards Background Documents Re Channel Functional Test Technical Interface Agreement for Plant,Units 1 & 2 ML20236M9831997-02-18018 February 1997 Forwards TIA Response to 961030 Region I Request to Review Issue Related to Scope of Channel Functional Testing Required by Ts.Memo Supersedes Memo ML20236M9241997-01-30030 January 1997 Forwards TIA Response to 961030 Region I Request to Review Issue Re Scope of Channel Functional Testing Required by TS ML20132A8991996-12-12012 December 1996 Forwards Background Document Re Event Rept on Fire Protection Analysis Assumptions for Safety Relief Valve Operation,For Plant,Units 1 & 2 ML20236M0571996-12-0303 December 1996 Responds to 961126 Note Requesting Written Interpretation of TS for Plant,Units 2 & 3.Specifically,under What Plant Conditions,Including Reference to DG Testing Conditions,Sr 3.8.1.17 Must Be Met ML20134N0011996-11-19019 November 1996 Notification of Significant Licensee Meeting 96-106 W/Util on 961206 to Discuss Interactions That Were Introduced During Prior Modifications,Between Emergency Diesel Generators & Associated Residual Heat Removal Sys Pumps ML20129K2561996-11-0505 November 1996 Notification of Significant Licensee Meeting 96-109 W/Listed Attendees on 961202-03 in Philadelphia,Pa to Provide Training,Resolve Interagency Exercise Scheduling Conflicts & Discuss Current Issues in Emergency Preparedness ML20129H3881996-10-31031 October 1996 Notification of Significant Licensee Meeting 96-105 W/Util on 961115 to Address Maint Rule Implementation Issues at Peach Bottom as Identified in Maint Rule Team Insp 50-277/96-07 & 50-278/96-07 ML20129H4641996-10-31031 October 1996 Notification of Significant Licensee Meeting 96-106 & 96-346 W/Util on 961211 to Discuss Interactions That Were Introduced During Prior Mods,Between Emergency DG & Associated RHR Sys Pumps ML20129H9551996-10-30030 October 1996 Notification of Peach Bottom full-participation Exercise Scheduled for 961119 on Site.Forwards Lodging Arrangements, Roster Assignments & Schedule of Key Events ML20129B5541996-10-18018 October 1996 Notification of 961025 Meeting W/Util in Delta,Pa to Discuss Status of Open & Planned Licensing Actions for Pbaps,Units 2 & 3 & Limerick Generating Station,Units 1 & 2 ML20135A2801996-04-10010 April 1996 Discusses Director'S Decision Re Actions Requested by Petitioners W/Regard to Use of Thermo-Lag by Reactor Licensees.Petitioners Requested Immediate Shutdown of Reactors Using Thermo-Lag ML20134K5771995-12-0505 December 1995 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 951113-16 IR 05000227/20030301995-03-0606 March 1995 Discusses Pse&G Intent to Perform Organization Effectiveness Review During 950227-0330.Telcon of 950306 Between T Martin & L Eliason to Discuss Objectives,Scope & Depth,Methodology & Plan Also Discussed ML20149J1451994-12-22022 December 1994 Notification of Significant Licensee Meeting 94-149 W/Util on 950109 in King of Prussia,Pa to Discuss Upcoming Unit 2 Outage & Changes in Health Physics Organization 1999-08-20
[Table view] |
Text
_ .. _ _ ._ ._ _ - - . _ _ . . _ _ _ _ _ . _ _ _ _ _ . _
March 25, 1997' !
REISSUED WITH CORRECT TIME MEMORANDUM TO: John F. Stolz, Director Project Directorate I-2 Division of Reactor Projects - I/II '
Office of-Nuclear Reactor Regulation FROM: Joseph W. Shea, Project Manager (original signed by)
Project Directorate I-2 Division of Reactor Projects - I/II ,
l Office of Nuclear Reactor Regulation ;
SUBJECT:
FORTHCOMIDG MEETING BETWEFN PECO ENERGY _ COMPANY (PECO) AND :
NRC, PEACU BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 AND ;
LIMERICK UENERATING STATION, UNITS 1 AND 2 l
t L DATE & TIME: Monday, April- 14, 1997 _
1:30 p.m.
LOCATION: U.S. Nuclur Regulatory Commission .
One White Flint North l l 11555 Rockville Pike, Room 88-11 North Bethesda, MD 20872 PURPOSE: To discuss PECO's plans .and schedules for resolution of Thermo-lag fire barrier issues at Peach Bottom and Limerick.
PARTICIPANTS *: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC/NRR PICQ A. Thadani D. Fetters L. Marsh A. Cross-Dial S. West et al. ;
S. Varga l J. Stolz
! J. Shea '
l l Docket Nos. 50-277/278 ,
cc: See next page M N MIN W l CONTACT: J. Shea 415-1428
- _
- Meetings between NRC technical ~ staff and applicants or licensees are open for j interested members of the public, petitioners, intervenors, or other parties /'
- to attend-as observers pursuant to " Commission Policy Statement on Staff q i Meetings Open to the Public" 59 Federal Reaister 48340,9/20/94.
- . DOCUMENT NAME
- PB4-14 MTG , p {/0 To receive a cop f this d n , indicate in the box: "C" - Copy without i attachment /encio e "E" - Copy with attachment / enclosure "N" - No copy j OFFICE P01 2 PM //[ !, lE P012 LA fj'//M l P01'2/D N l l l I NAfE JShee:h(I I Y// N0'Brien d ,tstol3[L l DATE 03/15/97 'V 03/L*1/97 3/ M /97 03/ /97 03/ /97
- Ofhcial Record Copy 9704010485 970325 PDR ADOCK 05000277
- P PDR
, ,, jeun REISSUED WITH CORRECT TIME
[ % UNITED STATES g j t
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20016 0001 8
k ..... f March 25, 1997 ,
MEMORANDUM T0: John F. Stolz, Director Project Directorate I-2 !
Division of Reactor Projects - I/II !
Office of Nuclear Reactor Regulation 1 FROM: Joseph W. Shea, Project Manager Project Directorate I-2 I k Division of Reactor Projects - I/
Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING BETWEEN PECO ENERGY COMPANY (PECO) AND NRC, PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 AND LIMERICK GENERATING STATION, UNITS 1 AND 2 DATE & TIME: Monday, April 14, 1997 1:30 p.m.
LOCATION: U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 8B-11 North Bethesda, MD 20872 PURPOSE: To discuss PECO's plans and schedules for resolution of Thermo-lag fire barrier issues at Peach Bottom and Limerick.
PARTICIPANTS *: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).
NRC/NRR PJ,C0 C
A. Thadani D. Fetters L. Marsh A. Cross-Dial S. West et al.
S. Varga J. Stolz J. Shea Docket Nos. 50-277/278 50-352/353
- cc
- See next page CONTACT: J. Shea '
415-1428
- Meetings between NRC technical staff and applicants or licensees are open for 1
interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340, 9/20/94.
.- ~ -.
- N March 25, 1997.- I REISSUED WITH CORRECT TIME l i I f
1 DISTRIBUTION:
L' E-Mail l
SCollins (SJC1) !
FMiraglia (FJM) '
l RZimmerman (RPZ)
SVarga (SAV)
JZwolinski (JAZ)
JStolz (JFS3)
JShea (JWS1) l M0'Brien (MBO)
Dross (SAM).
OPA (0PA)
AThadani (ACT)
LMarsh (LBM)
! SWest (KSW) l > CAnderson (CJA)
WPasciak, RGN-I'.(WJP) i i
WDean (WMD)
DScrenci (DPS)
PMNS (PMNS) l RJenkins (RVJ) l LTran (LNT)
WSchmidt (WLS) l FRinaldi (FXR2) -
i l ,Hard Conv l (DocketMj]e;cp.
l PUBLIC i PDI-2 Reading '
1 l OGC l l ACRS l Receptionist (0WFN and TWFN) 2 ,
a 1 , .,
j cc: Licensee & Service List *
{
.. ., i:
, +-
g, 4,
+ , .
I l i i t.
t 4