IR 05000277/1997099
| ML20196J758 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 07/21/1997 |
| From: | Swetland P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| 50-277-97-99, 50-278-97-99, NUDOCS 9708050045 | |
| Download: ML20196J758 (2) | |
Text
.
..
..
.
-
- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
, s s
.
July 21,1997 U. S. NUCLEAR REGULATORY COMMISSION No. 97-85
REGION I
REVISION 1 NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:
PECO Nuclear Facility.
Peach Bottom Atomic Power Station Docket Nos:
50-277; 50-278 Time and Date:
7:00 p.m., Tuesday, July 29,1997 Location:
Peach Bottom Atomic Power Station Training Center, Classrooms A & B Delta, PA Purpose:
To discuss the Systematic Assessment of Licensee Performanca (SALP) for the period covering October 15,1995 through June 6,1997, as documented in NRC Systemamtic Assessment of Licensee Performance Report No. 50-277/50-278/97-99 NRC Attendees:
H. Miller, Regional Administrator, RI J. Wiggins, Director, Division of Reactor Safety, (DRS)
P. Swetland, Acting Chief, Reactor Project Branch 4, Division of Reactor Projects (DRP)
W. Schmidt, Senior Resident inspector, Peach Bottom, DRP J. Stolz, Director, Project Directorate 1-2, Office of Nuclear Reactor Regulation M. Padovan, Project Manager, Peach Bottom, NRR Licensee Attendees:
D. Smith, President PECO Nuclear G. Rainey, Vice President, Nuclear Operations T. Mitchell, Vice President, Peach Bottom G. Edwards, Plant Manger, Peach Bottom M. Gallagher, Director, Outage Planning, Peach Bottom M. Warnner, Director, Site Engineering, Peach Bottom f
B. Allshouse, Director Maintenance, Peach Bottom h
NOTE:
This meeting is open to the public observation. Attendance by additional NRC personnel or handicapped persons requiring assistance to attend the meeting should be made known by July 25,1997, via telephone call to Paul Swetland, Region I, at (610) 337-5356.
ORIGINAL SIGNED BY Prepared by:
Paul D. Swetland, Acting Chief Projects Branch 4 lilllllilHIMilllli yf
.
9700050045 970721
/
- **
PDR ADOCK 05000277
/
,
.
.. -. _ - -. _
. - -. _ _.. -. -.. - -.
- _ - _ -. -.. _ -
.
... -
. s s
,
Distribution: (Via E-Mail)
i L. Callan, Executive Director for Operations, OEDO H. Thompson, Deputy Executive Director for Regulatory Programs E. Jordon, Deputy Executive Director for Regulatory Effectiveness, OEDO S. Collins, Director, Office of Nuclear Reactor Regulation (NRR)
J. Lieberman, Director, Office of Enforcement T. Martin, Director, Division of Reactor Program Management, NRR i
D. Ross, Deputy Director, Office of Analysis and Evaluation of Operational Data, AEOD D. Matthews, Acting Deputy Director, Division of Reactor Program Management, NRR R. Spessard, Deputy Director, Division of Reactor Controls and Human Factors, NRR R. Zimmerman, Associate Director for Projects, NRR B. Boger, Director, Division of Reactor Projects - 1/11, NRR N. Green, Jr., Policy Development & Technical Support Branch J. Stolz, Director, PD l-2, NRR W. Dean, Regional Coordinator, OEDO L.Padovan,r reject Manager, Peach Bottom, PD l-2, NRR W. Schmid'., SRI, PB D. Screnn, Public Affairs Officer, RI N. Sher',an, Field Public Affairs Officer, RI
!
I D. Ch'.vaga, SLs l
M. ' ampion, ORA Distribution:
PUBLIC D.M. Smith, PECO Energy l
State of Pennsylvania State of Maryland l
RA Secretary, RI DRP Division Secretary, R1 DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region i Receptionist DOCUMENT NAME:a:\\a:\\07-29.pb To receive a copy of this document, indicate in the boa:
"C" = Copy without attachment / enclosure
"E" = Copy with attachment /enclosu,e
"N" = No copy i
OFFICE Rl:DRP f
Rl:DRP l
,
_
NAME Schmidt /[,ffR SwetlandL,,[ /
l DATE 7fjl97,]j%Y ]
7bl97 jf/QQ)
OFFICIAL RECORD COPY
J d
i a