September 12, 1997 MEMORANDUM 10: John F. Stolz, Director Project Directorate 1-2 Division of Reactor Projects - 1/l!
Office of Nuclear Reactor Regulation FROM:
L. Mark Padovan, Project Manager
/s/
Project Directorate I-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING NUCLEAR REGULATORY COMMISSION (NRC) MEETING WITH PECO ENERGY COMPANY (PECO ENERGY), PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, ON EMERGENCY CORE COOLING SYSTEM (ECCS) PUMP SUCTION STRAINERS (TAC NOS. M98684 AND M98685)
DATE & TlHE:
Monday, September 15, 1997 10:00 a.m. - 4:00 p.m.
r L4 CATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 3B-2 North Bethesda, Maryland 20852 PURPOSE:
To discuss Peach Bottom ECCS pump suction strainer modification issues.
PARTICIPANTS:* Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) and the Office of Nuclear Regulatory Research (RES).
MQ PECO Enerav M. Padovan, NRR J. Hufnagel R. Elliott, NRR E. Hosterman, et al.
K. Kavanagh, NRR J. Kudrick, NRR M. Marshall, RES Docket Nos. 50-277/278 i
cc:
See next page
/
O CONTACT:
L. Mark Padovan, NRR (301)_415-1423
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the-public, petitioners, intervenors, or other parties
-to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Feaister 48340,'9/20/94.
OFFICE PDI-2/PM PIIlkk PLhD NAME LPadovanb MNB didb JSth 9 lb/97 Q //)[97
& /$/97 DATE
/
0FFICIAL RECORD COPY
~
DOCUMENT NAME:
PB9-15. MIG be-) b h i b
fok [
$77 P
- o mase gk UNITED STATES y*.
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 30eeH001 September 12, 1997 MEMORANDUM TO: John f. Stolz, Director Project Directorate 1-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation FROM:
L. Mark Padovan, Project Manager kC^
Project Directorate I-2 h
Division of Reactor Projects - 1 11 Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING NUCLEAR REGULATORY COMMISSION (NRC) MEETING WITH PECO ENERGY COMPANY (PECO ENERGY), PEACH BOTTCH ATOMIC POWER STATION, UNITS 2 AND 3, ON EMERGENCY CORE COOLING SYSTEM (ECCS) PUMP SUCTION STRAINERS (TAC NOS, M98684 AND M98685)
DATE & TIME:
Monday, September 15, 1997 10:00 a.m. - 4:00 p.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike, Room 3B-2 North Bethesda, Maryland 20852 PURPOSE:
To discuss Peach Bottom ECCS pump suction strainer modification issues.
PARTICIPANTS:* Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR) and the Office of Nuclear Regulatory Research (RES).
EG PECO Enerav M. Padovan, NRR J. Hufnagel R. Elliott, NRR E. Hosterman, et al.
K. Kavanagh, NRR J. Kudrick, NRR M. Marshall, RES Docket Nos. 50-277/278 cc:
See next page CONTACT:
L. Mark Padovan, NRR (301) 415-1423
- Meet.ings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers )ursuant to ' Commission Policy Statement on Staff Meetings Open to the Pu)lic" 59 Federal Reaister 48340,9/20/94.
r PECO Energy Company Peach Botton Atomic Power Station, Units 2 and 3 l
CC!
J.W.Durh&m,Sr.lCounselEsquire Chief-Division of Nuclear Safety Sr. V.P. & Genera PA Dept. of PECO Energy Company Environmental Resources 2301 Market Street, $26-1 P.O. Box 8469 Philadelphia, PA 19101 Harrisburg, PA 17105-8469 PECO Energy Company ATTN: Pr. T. N. Mitchell, Vice President Board of Supervisors Peach Bottom Atomic Power Station Peach Botton Township 1848 Lay Road R. D. #1 Delta, PA 17314 Delta, PA 17314
-PECO Energy Company Public Service Comission of Maryland ATTN:
Regulatory Engineer, A4-55 Engineering Division Peach Bottom Atomic Power Station Ch of Engineer 1848 Lay Road 6 St. Paul Centre Delta PA 17314 Baltimore, MD 21202-6806 4
Resident inspector Mr. Richard McLean U.S. Nuclear Regulatory Comission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, PA 1/314 B-3 Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region i U.S. Nuclear Regulatory Comission Dr. Judith Johnsrud 475 Allendale Road National Energy Comittee King of Prussia, PA 19406 Sierra Club 433 Orlando Avenue Mr. Roland Fletcher State College, PA 16803 Department of Environment 201 West Preston-Street Manager-Business & Co-owner Affairs Baltimore, MD 21201 Public Service Electric and Gas Company A. F. Kirby, !!!
P.O. B M 236.
External Operations - Nuclear Hancocks Bridge, NJ 08038-0236 Delmarva Power & Light Company P.O. Box 231 Manager-Peach Bottom Licensing Wilmington, DE 19899 PECO Energy Company Nuclear Group Headquarters PECO Energy Company Correspondence Control Desk Plant Manager P.O. Box No. 195 Peach Bottom Atomic Power Station Wayne, PA 19087-0195 1848 Lay Road Delta PA 17314 Mr. George A. Hunger, Jr.
- Director-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No.-195 Wayne, PA 19087-0195-a-
,, o DISTRIBUTION E-Mail
~
SCo'11ns/FMiraglia
- RZimmerman BBoger JZwolinski JStolz LPadovan M0'Brien TMartin (e-mail to SLM3)
OPA RE11tott KKavanagh JKudrick MMarshall CHehl,-Region I CAndersen, Region I
- BMcCabe
-DScrenci, Region I PMNS-(Meeting Announcement Coordinator)
Hard Cony
. Docket lle-PUBLIC PDI-2 Reading OGC ACRS
- Receptionist (OWFN and TWFN) i N'
3 7
M