ML20129H464
| ML20129H464 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 10/31/1996 |
| From: | Pasciak W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| References | |
| EA-96-106, EA-96-346, NUDOCS 9611050249 | |
| Download: ML20129H464 (1) | |
Text
. _ _._ _
l t
i i
f October 31,1996 No.96-106 EA No.96-346 l
i U.S. NUCLEAR REGULATORY COMMISSION l
REGION 1
~
NOTICE OF SIGNIFICANT LICENSEE MEETING i
Licensee:
PECO Energy i
l Facility:
Peach Bottom Atomic Power Station l
l Docket Nos.:
50-277 & 50-278 l
l Time and Date:
1:00 d.m., Wednesday, December 11,1996 Location:
NRC Region 1 1
475 Allendale Rd.
I King of Prussia, PA 19406 l
l Public Meeting Room L
Purpose:
Predecisional Enforcement Conference to discuss interactions l
that were introduced during prior modifications, between emergency diesel generators and associated residual heat removal system pumps.
NRC Attendees:
H. Miller, Regional Administrator, NRC Region I i
R. Crienjak, Acting Deputy Director, Division of Reactor l
Projects (DRP)
R. Blough, Deputy Director, Division of Reactor Safety (DRS)
W. Pasciak, Chief, Projects Branch 4, DRP.
W. Ruiand, Chief, Electrical Engineering Branch, DRS W. Schmidt, Senior Resident inspector, Peach Bottom, DRP l
R. Lorson, Resident inspector, Peach Bottom, DRP P. Swetland, Project Engineer, DRP J. Stolz, Director, Project Directorate 1-2, Office of Nuclear Reactor Regulation (NRR)
J. Shea, Project Manager, Peach Bottom, NRR Licensee Attendees:
D. Smith President, PECO Nuclear I
G. Edwards, Plant Manager, Peach Bottom, PECO Nuclear G. Hunger, Director, Licensing, PECO Nuclear l
M. Warner, Director, Site Engineering, PECO Nuclear P. Davison, Site Engineering Supervisor, PECO Nuclear Note: This meeting is closed to the public. Attendance by additional NRC personnel, including handicapped persons requiring assistance, should be made known by December j
l 5,1996, via telephone call to Walt Pasciak at (610) 337-52 Approved By
[
N/ft Walter. Pa cisk, Chief i
Project B nch 4 M b-
['M10go2 g6 j77 Divisio of Reactor Projects G
,. _ ~