SALP Repts 50-445/81-20 & 50-446/81-20 for June 1980 - Jul 1981
ML20211C579
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/29/1982
From: Crossman W, Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20211C348 List:
References
FOIA-85-312 50-445-81-20, 50-446-81-20, NUDOCS 8606120347
Download: ML20211C579 (15)


Text

. .

.. . . . - - - - -n

-

.

. i

,

.

-

~

APP 90IX U. S. NUCLEAR REGULATORY COMMISSICN

REGION IV

e SYSTEMATIC ASSESSMENT OF LICSSEI PERFORMANCE Recer.: 50 u'i/81-20 -

50- 4 6/81-20

.

Occkets: 50-u 5 1 50 u6 -

Catascry A2 -

Licansae: Texas Utilities Gt:nerating Cemeany 2001 3ryan Tcwer .

Dallas, Texas 75201

.: acility Name: Comanche Psak, Units 1 and 2 Accraisa! :ericc: July 1, 1980, :: June 30, 1981 Accraisai C:meletion Ca.a: Sec x:::er 1,1981 Licansae Meet ng: Cet:t:er 9,1981 SALP Ecard: G. L. Macsen, Chief, Reac.:r P :jec 3ranen 1 .

W. A. Cressman, Chief, Reac :r ? fec: Section 3

-

S. 3. Eurwell, NRR P : ject Manager R. G. Taylor, Senior Resicen: Ins:ec.:r R. C. 5:awar , Reac::r Inscec :r

leviewec Ey: // / [ _ _

3!37//'s W. A. Cr:ssman , CM ef, Reac::r Pr:;ect,5ec- en i Ca:a

.

Accrevec Sy: i

'

6M Yd/f

'G.* L. Nacsan , CM ef , Reac.:r ?r:;ec: Sranen . ;a:a (SALP Scar: Chair :an)

l 8606120347 B60606 i

PDR FOIA l

GARDE 85-312 PDR

.

- -

% - -. - - - - - - - , - , - - - - - - - - - - _ - . _ . , , ,

  • __

' * - -

,_

m _

_ . _ _ _ _ .

-

1 Introduction Systematic Assessment of Licensee Ftrformance (SALC) is an integrated NRC staff effort . collect available coservaticns and dan en an ' annual basis and evaluata licansee perfemanca utilizing tnese data and ocsarvatiens as a basis. Tne intagra:ad systamatic assessment is intanded to be - -

sufficiently diagnostic to provida a rational basis for allocating NRC rescur:as and to provide meaningful guidanca to licansee managemen .

II. CH:aM a Tne- assess::En: cf licansee ;:erformanca is imclementad Orcugh the use of seven evaluation critaMa. Tnese critaria are acclied t: eacn functional area tnat is acplicable :: :na facility activities (c:nstracticn, pre-cceratien or cceration) for the catacerization of licansae perfemanca in

.nese area One- or more of the follcwing evaluation cM: aria are usac = assess eacn acclicable fanc-icnal are . Management involvement in assuring cuality Apor:acn Oc resolution of taennical issues fr:m safety s anc:cin Rescensiveness t: NRC initiatives 4 Enfor: ament histcr/ Recer.ing anc analysis of recer.asle events Staffing (inclucing managemen:) ' Training effectiveness anc cualifica:icn At:Hbu as asscciatad with tne acove evaluation cri: aria fem =e guicanca fcr :ne 5AL? Ecard for catagori:2:icn of eacn func icnal area in ene of Orte catascMes. Fedomance catag: ries are definec as follcws:

Catacerr '.. A c:=inatien of at ributas whien demenstra:as acnievemen:

cf sucer cr safety pedomanca; i .e. , licansee managemen at:antion and involvement art aggressive and crientad :: war nuclear safsty; licansee rescur:ss art amole anc effec-ively usec sucn Oa: a nign levei of cerf: manca wi:n res:ect :s cperatienal safety er =ns;raction is being acnieve Recucad NRC attantion may e accrecriat Ca:accr/ 2. A c:mcination of at:Mbutas wnich cemenstra:as acnievement of sa :sfact:ry safety ;:edemanca; licenses managemen at:antien and involvement are evicen and are c::ncar ec wi n nuclear safet/; licansee rescur:as art adecuata anc are reascnacly effec-ive suca c a satisfac cr/

edermanca wi= res
ect is cceratienal safety er =nstrue:icn is beine '

acnievec. NRC a antion 'shoulc te main.sinec a: ne mai level Catsc::r! A c::=ina:icn of at ributas wnien cemens:ra:as acnievemen:

cf cnly mnimally satisfac :ry safety cedomanca; iicansee tanagemen; at:anden er invclvement is ac:ac:acie anc =nsicers nuciear safety, cu-

'

. . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ - _ _ 1 _ ._ _ ___ __ - _ _

. _ _

. ,

- -

_

_ _ . . . . .u.-. -

  • *

'

weaknessas art evident; if cansee resources appear to be strained or not effectively used sucn that minimally satisfactory performance with '

respect to operational safety cr construction is being achieved. Both NRC and licensee attantion shculd be increase III. Summary of Results Functional Artes Catacerv Scils and Foundaticas NA

.

. Containment and other dA Safaty-Related Structures

~ Piping Systams and Supacr:s l

. Safety-Relatad Com;cnents 1 Succcr: Systams 2 Electrical Pcwer Supply anc Distributien 1 :nstrumentation anc Control Systams 1 Licansing Activities 2 I Perfccmancs analvses l

? The SAL? Scarc actained assessment cata acclicacia to the accraisal perice

of July 1,1980, to June 30, 1981. The cata for the Ccmanene Peak Staam Electric Station (CPSES) was taculatac anc analy
sc anc a performanca analysis was cevelopec for eacn of six functional area The SALP Scare met en Sectamcer 1,1981, to review :ne ;erformanca analyses and succerting cata anc cavelen the SALP Scarc Recer Functional Area Anaivsis Sciis anc Fcuncatiens All activities ccmcleta . Containment anc Other Safety-Reiatad Strue: ares very limitad activities curing assessment peric . Picine Svstams and Succcc:s Three violaticns issuec to tne licansae in :ne tview cerice were concarned with malfuncticn in :nis general area. Two cf tarte invcivec vencor furnisnec succert/ restraint ecmcenent The firs:

.- .. . __

..

. .

_. _- -

.

.

.

was based on an allegation to the 'effect that a grouc of moment restraints could not have been properly examined in the vendor's facility by the vendor. Our examination at the sita substantiated l the allegation and the c:mponents were sent back to tne vendor j for rework and reinspectio The sec:nd was by the same vendor regarding a group of seismic restraints that did not recaive full penetration welcing as -

-- -

specifie These ccmcenhnts wars sworked onsita by the vendor to satisfy the engineering critari Both instancas, which oc:urtsc within an acproximata 2-month period, incicatad problem in tne vendor c:mponent inspection program which have been rectifie .

The thi-d itam involved a finding that due to the remcval of tamcorary succorts, cartain piping and in-line c:mconents wars in effect un-succor:ac. The licansee reconced to the nonc:melianca by installing so called 'hard succorts' of a tamcorary naturs until sucn time as the :ermanent succorts are installec. Har: succor:s art supports

at art cifficult to remove inacvertantly by ceing boltac : tne builcing, the pipe, or bot The licansee/centracter ASME Cdce basac installation anc quality c:ntrei pr: gram is relatively sinc!e, straigntforware and is generally weil inclementa The major weakness has :een, anc to a degree c:ntinues :s be, an inability to hirs/cr retain tne servicas of c:mcatant (as dirtinguisned fr:m Cece qualification) pipe welder The if cansas has essconcac :: this Or:clea :y raciogracning cartain weics in scme essential piping systams that ne is no; recuirsc to radiogracn under tne Coce or NRC regulaticn:. He also nas a relatively streng welder training pr: gram aimac at increving the c:mcetanca of ne welcers he hirt .

The licansae's management 4:!:reis have been demonstratac c be effective in this art; s'c a e assigned to Catagory Saf atv-Rel atac Cemco.is.;ta ~,clucinc Vessel s . Intarnals , and Pumes During ne accraisal pericc, ne major activity in :nis arse was :ne maintananca anc preservation of insta11ec, nonocerational c:mconent Limitac worx was also ac::mciishec on :ne Uni: i Reac :r Vessai Intarnals. The maintananca and preservation activities in all areas have been ciligently pursuec by a greuc of c:nstruction anc cuality persennel scacifically assignac :: One activity c:ntrollac y cantral cisca: ners anc easy-::-follow .:recacurss. NRC inscections in tnis area nave esvealec no su stantive pr clem No NRC inssections wers race of installation worx on :ne vessel intarnals curing :na

eriod cue :s ne limitac worx involve '

The licansae's management centrols have been cemenstratac :: te effective in nis area anc art assignac :: :ne Catagery level.

.

.

- - - -

_ - . _ _ _ _ .

^

. .._...... . - --

'

_

.

.

,

-

5. Succort Svstams includine HVAC. Radwasta and Fire Protection The licensee's accifcation of support systams, other than those involving concrete or piping systams (areas 2 and 3 above), are essentially limitad to HVAC, racwasta, and the fire protection systa During the appraisal period, NRC inspections were directed toward review of the licensee's audit program for monitoring the subcontrac:ces installing HVAC and fire protaction systems. The succontrac:ce pr: grams had been evaluated in an early appraisal period and found adequata for the work involved. The licansaa's audit program was also found to be effective in monitoring tassa'

activitie Succorts for the racwasta piping systam ars included wita tne licansee's Class 5 succor: program wnica has been evaluatad as it relatas :s sther Class efforts -anc found. :s be effectiv '

)

The licansee's management c:ntrols in this area are c=nsidered to be l at the Catagor/ 2 leve . Dec rical Pcwer Succiv anc Distribution The NRC inscoctions in this functional area have not identified any sucstantive problem The licansae procacures f:r installation anc cuality c:ntrol are relatively simcle anc straigntforwar The licansae curesn:1y has a c:mcetant for:a of adecua:aly trained and .

motiva:ad personnel to carry out the precacurai recuirement Performanca analysis in this area is datarminec to be Catag:ry 1.

l 7. Instrmentation and Centrol Svstams l

Althougn muca effort has been excenced in this area by tne licansee's lacer forca, rslatively few instrments are fully installe The licansae's program for ins allation and cuality c=ntrol .in :nis area is simcle, straign forward, anc effectiv The assignac personnel accear to have been adecuataly trained anc c:mcetant to carr/ aut their assigned responsibilitie NRC inscections have not identified any sucstantive problems in :nis functional area curing .ne aceraisal perio Assessment of tne licansas's attributas in :nis area reveniec a Catagcr/ 1 1eve S. 1.icansine Ac-ivities The acclicant's ability to rescend on senecule is slower : nan average. In :ne work leacing to the issuanca of :ne SER, :ne t

acclicant was not acle to perform at a rata necassarf :c :eet

!

scnecule demand (Grantac, taesa senedule cemancs were neavy

, cue :s ne snortanec scnecule. ) In overali cuality of wort suc-mittac, :ne acclicant has performac sligntly :etter : nan average over nis accraisal caric The acclicant is well succortac :y

~

- _ ..

_ _ . _ _

+ e . _2

. _ ... . . . . - .

_

.

Westinghouse and Gibbs & Hil The principal need for improvement _ _

_

is in an increased participation in the licensing process by the station operations staff. We expect this to improve as the station approaches fuel loadin l l

Application of evaluation critaria in this area resultad in a

'

Category 2 leve l I

Conclusion

,

I The SAL.D Soard c:ncluded' that the licansae has demonstratad an overall c:mcination of attributas exhibiting Catagory 1 performance curing the acoraisal perio This evaluation was basac upon tne three primary areas where tne c:nstruction efforts, and, therefore, the NRC inscoction effort, were directad; i.e. , piping, electrical, and ing:rumentation installations. The Scard notad that 1063 of tne 1699 inssectien-hours wers cavetad to these three basic area In regarc Oc the licansee's engoing intaractions wi-a NRR -tne c:nsansus ~

of the Scarc was tnat the licansae has :anagec nesa adiTvities in a Catagory 2 acc Scar Rec:mmencations Altacugn tne SAL 3 Scard c:ncluced that the overall licansas perf"crmance was Catagory 1, ney dic. net rec:mmene t ne regicnal offica taa: the inscaction level for c:nstruction be enanged. Programmatic changes for c:nstruction inscection nave been mace that will effectively recuce inspecticn activities .

for all c:nstruction sita Succortinc Dat.1 and Summaries

. Recor: Data LER Numcers Reviewed (Nc: acclicamle)

. Ccnstrue: ion Deficiency Recerts The licansee formally recoriac seven Significant C:nstructien Deficiencies tnat he or his agents nac icantifiac curing :ne accraisal perio These are summari:ec as felicws:

(1) Engineering failure to c:nsicer tne ini:kness f arenitac-tural c:ncreza en ficors wnan s:ecifying ne accecmen:

cec n of ancnce :cit .

-+ ..

,,

'

MAJOR CONTRACTS Sc VENDOR JOB DESCRIPTION

.

I. Pinkerton's In Plant Security 2. American Steel Building C Construct Administrative Office Building Construct Pipe Fab Shop 3. Chicago Bridge & Iron (CB&I) Containment Liners Nuclear / Field Fab Tanks S. S. Liner Systems for Concrete

.

Tanks Diesel Generator Fuel Oil Storage Cable Tray Support Fabrication Pipe Whip Restraint Supports

Moment Restraints

~

Temporary Demineralized Water Storage Tank Welding Structures 4 R. W. Hunt Lab & Testing Work for Concrete 5. Grant Air Conditioning HVAC - Construction Administrative Building 6. Marathon Metallic Building Construct Warehouses A, B & C Construct Training Center for Wel ding /Qualifica tion Grinnell Fire Protection Fire Protection for Warehouses A, -

B, & C

!

l Fire Protection Maintenance

!

-Adminstrative Buildings & 138KV l Startup Transformer Fire Protection Electrical-Instrumentation Shop l Fire Protection / Vault Areas l

,

Plant Fire Protection System

!

Halon System Modification TUGC0 NOSF p 2 -31

..- ..

.

VENDOR JOB DESCRIPTION S. L. McAlester Construction Security Fencing Security Fencing

, Sabine Steel Demin. Water Storage Tanks 10. Gunn & Briggs Roofing / Insulation Maintenance & ,

Administrative Buildings Roofing / Main Plant 11. Bahnson HVAC/ Main Plant Startup HVAC Test Engineers 12. J. Wallis Storage Maintenance Building Lockers &

Benches 13. Southwestern Materials & Supply Metal Siding for Chlorine, Turbine & Safeguard Building / Main Plant 14 Natkin Service Company HVAC/ ARMS Conputer Room

.

15. Lone Star Fence Parking Lot Fencing Switchyard & Plant Fencing 16. Hartford Steam Boiler Authorized Nuclear Inspectors 17. Dover Elevator Hydraulic Elevators / Turbine, Auxil f ary-Reactor Buildings 18. Jess Brooks Furring, Lathing & Plaster Spray on Fireproofing l 19. GAPC0 Welding Services & Equipment 20. Bob Chastain Asphalt Paving /TUGC0 Parking Lot 21. Diamond Electronics Security System 22. Southwest Fabricating & Welding Nuclear / Nan-Nuclear Fabrication Piping 23. Protective Material s Bullet & Penetration Doors 24 Albert S. Komatsu & Asso Construct Nuclear Operations Support Facility Offsite (NOSF)

A/E Services - Sorting & Storage Building

)

.

I

_ ..

,

,- ..

.

VENDOR JOB DESCRIPTION 25. Overly Door Corporation Rolling Steel Door - SWI 26. L & W Paving Paving /TUGC0 Parking Lot &

-

Project Entrance Gate (Post 8)

.

Operations Parking Lot

.

27. Brand Industrial (BISCO) Penetration Seals 28. JBM Builders, In Construct Nuclear Operations Support Facility Offsite (N0SF)

29. Cyclone Fence Company Main Plant Security Fencing 30. Wiss, Janney, Elstner & Structural Integrity &

Associates, Inc. , Integrated Leak Test 31. Tyson Building Corporation TUGC0 Operations Administrative Building Annex 32. Charles F. Williams C Rolling Steel Doors Fuel Building Rolling Steel Doors / Turbine, Safeguard & Control Buildings 33. Jordan Construction C Parking Lot /TUGC0 Operations Administrative Building Annex 34. Best Fire Protection Systems Fire Protection System (Temporarily suspended.)

35. Component Construction Maintenance Annex Building I

36. T. R. Osborne, In Dallas Issued / Clearing & Grubbing Microwave Tower Site i Site Preparation at Mt. Creek Power Plant for Microwave Tower I Site (Dallas Issued)

l 37. Big State Waterproofing Special Roofing Main Plant Buildings 38. Ebasco Services, In Unit 2 Damage Study

.

Independent Bounding Study To l Assess The Quantity Of Paint Inside Containment That Could Be Declassified l Provide Onsite Piping Stress Analysis & Piping Support Restraints Design & As-Built Verification, Limited Design,

. _ - - . - - _ .

. - - ___ _- -_

..- ..

.

VENDOR JOB DESCRIPTION 38. Ebasco Services, Inc. (cont.) Drafting & Calculations For Electrical Conduits & Cable Tray

-

Supports, Complete As-Built Review

.

Environmental Analysis High Energy Line Breaks ,

Development Of Criteria For Class 5 Pipe / Train C Conduit Seismic Interaction Study Damage Study Unit 1, Radiation Monitoring Study, Review of

-

Layout for Extraction Steam,

,

Heater Drain & Feedwater System 3 Science Applications, In Test Determination of Particulate Deposition in Sample Lines of Radiation Monitors 4 Sargent & Lundy Engineering Construction Project Evaluation Program (INPO Audit)

.

41. Corporate Consulting & Development Conceptual Design, Final Company Analysis & Seismic Qualification Report Technical Services of Dr. Roland Yow to Provide Input to CPPE Concerning Welding on Embed Channels Mounting Plates

'

4 G. R. P. Consul ting, In Software to Modify IBM PDQ-7 Program to Provide Pin Power Edit Capabilities 'for a Rod by Rod Core Power Distribution Readout 43. Freese & Nichols, In Periodic Inspections of Squaw Creek Dam and Safe Shutdown Inpoundment Dam Design Engineering for Squaw Creek Dam, Rafiroad, Safe Shutdown Impoundment, Pung Station & Pipeline j 44 Gilson Stanely Floors PVC Flooring l 45. Richardson Paint Jobsite Painting l

46. Carter-Stephens, In Instrumentation & Control Shops /

! Low Volume Waste Control Building

- - . - - . - - .

, . .

.- ,.

.

VENDOR JOB DESCRIPTION 4 Brown & Root, In Labor Services (Outside scope of original contract).

-

TESCO Switchyard Foundations Waste Water Management System

.

4 Southwest Research Institute Service for Penetration Seal Takeoff & Design Verification Technical Services for Penetration Seal Evaluation Services for Preliminary Design

.

Engineering Services & Procedure Writing for Fire Endurance Test to Qualify a Protective Envelope for Class 1E Electrical Circuits Model & Conduct Fire Tests on Typical 3-Hour Rated Curtain Fire Damper Installations Perform Concrete Strength Test .

Using Schmidt Hammer 4 Westinghouse Electric Design to Limit Runout Flow of RHR Pumps Scoping Study Installation of CE HJ TC Probe Study for Compliance With Regulatory Guide 1.97 Rev. 2 Steam Generator Blowdown Flange Analysis Interface to Support ERF Setpoint Methodology to M2et Regulatory Guide 1.105 Rev. 2 Additional ERF Signal Changes

.

Evaluation of Transmitter Error During Loss of Containment Ventila tion Provide Valve Restraint Locations Analysis of RV Head & Reactor Internals Lifting Devices (NUREG-0612)

_ . . _ -

-

.. .

.

VENDOR JOB DESCRIPTION 49. Westinghouse (cont.) Eddy Current Inspection for 100%

Preservice on Steam Generators

.

(Unit 1)

. Eddy Current Inspection for 100% -

Preservice on Steam Generators (Unit 2) .-

Determine Cause of reactor Cavity Over-Temperature Condition Determine Failures in Inverters Licensing Support to Demonstrate

.

Leak Before Break

'

Technical Assistance to Complete UV Coil Performance Testing NSSS System Cost for Analysis of RCP Rear Tie Rods

.

Vibration Baseline for Piping Stress Analysis of Piping Systems 480V Switchgear Seismic Analysis Replace RHR Motor Main Lead Boxes

& Seismically Qualify

,

'

Design & Furnish Changes in Alternate Shutdown System Engineering & Hardware for Boron Dilution Protection System to Meet Regulatory Guide 1.70 Revision 3 P-4 Interlock Testing Capability Charging. Pump Miniflow (Response to IEB-70-06A)

Design to Accomodate C-E Haated Junction Thermocouple System l Qualified ' Instrumentation Sensing

'

Core Exit Temperature & Determine Core Cooling Adequacy l

._. . . _ _ _ _ _ _ - , _ . _ _ _ _ . _ , _ - - . _ _ - - - . _ - - - _ . -

.. ..

.

VENDOR JOB DESCRIPTION 49. Westinghouse (cont.) Modification of Over Pressurization System

,

-

Cable for Core Exit Thermocouple

, Upgrade for NUREG-0737 II. Analysis Transient Scenarios ..

Shim Installation Report WEB Program Analysis for Thermal Expansion During Plant Heatup

.

Qualification Analysis for NSSS Auxiliary Relay Racks Dense Packed Spent Fuel Racks Steamline Break Mass / Energy Release Analysis Technical Services to Generate -

Startup Procedure Piping System Consul tant Control Rod Drive Mechanism Welding Services Technical Services for Calibration / Instrumentation Analysis for Spent Fuel Pool #1, SAMU-Trailer, Nozzle Load Analysis, Analysis for RV Head Vent System P2500/CCM Interface Preop Testing of P-2500 Software Verification Test Safeguar'd Foreign Object Search &

Retrieval Search & Retrieval of Debris from R. V. Annuls Preservice Inspection, Examination of Welds on HPSI System, Feedwater, Auxiliary

. _- - _ _ _ _ _ - _ _

s ,

,_O , O VENDOR JOB DESCRIPTION 49. Westinghouse (cont.) i Feedwater, Regulatory Guide 1.150 Upgrade Unit 2 Preservice

-

Inspection, Investigate Lower RV

Head Indication

'

Evaluations to Determine Overtenp During Hot Functional Testing .

(Reactor Cavity)

Analysis for DP Indicating Switches Finite Analysis of Pipe U-Bolt Restraints

.

U-Bolt Friction Test Review & Evaluate Mechanical

, Equipment in Potentially Harsh Environments 5 Brand Industrial (BISCO) Develop Fire Testing Program for Thresded Conduit Sleeves Utilizing ASTM E-119 & ANI -

PIA /MAERP Test Standard Requirements 5 Gibbs & Hill, In Instructure Response Spectra Seismic Analysis to Support Repacking of Spent Fuel Pool A/E Design 5 Quadrex SAS/ERF Computer System (NUREG-0696)

5 Singer Layne Excavation & Construction of Wa ter Well s Water Well 54 Southwestern Battery Supply Pkteorological UPS 5 Weather Measure Cor Lightning Protection 5 Brown & Blakney Plant Entrance Access Road

,

5 W. A. Smith Construction Railroad Rail & Accessortes 5 Texas Power & Light 138 & 345 K SY Installation 5 Texas Electric Service C & 345 K SY Installation

!

k

_ _

,s ..~

.

.

VENDOR JOB DESCRIPTION 60 Yandell & Miller VAC Design

. 61. Combustion Engineering K]TC Proposal

-

62. United Engineers & Const Engineering Services 63. C. T. Main Engineering Services 64. Tera Corporation Engineering Services 65. Tenera Corporation Engineering Services 66. Southwest Laboratories On-Site Welding Inspections

,

,

Conformitory Testing 67. National Soil Services Engineering Services 68. Black & Veatch Engineering Services 69. Butler Services Engineering Services 70. Piping Design Service Engineering Services 71. Energx In Engineering Services 72. Delian Corporation Engineering Services 73. Evaluation Research Engineering Services 74. J. R. Benjamin Asso Engineering Services 75. Wise and Associates Engineering Services 76. Reedy Associates Engineering Services 77. Inpell Corporation Engineering Services 78. Project Assistance Cor Engineering Services 79. ITT Grinnell Engineering Services