Partial Response to FOIA Request for Records Generated Re Contentions &/Or Harassment & Intimidation Panel Assessment of Qa/Qc at Facilities.App A-1 & A-2 Documents Available in PDR W/Exception of 8,13,28,29,32 & 43
ML20211C341
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/06/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Garde B
GOVERNMENT ACCOUNTABILITY PROJECT
Shared Package
ML20211C348 List:
References
FOIA-85-312 NUDOCS 8606120295
Download: ML20211C341 (3)


Text

,

FOR-0/6

@ Uru A

UNITED STATES

[

Ug.

NUCLEAR REGULATORY COMMISSION I

5 l

WASHINGTON, D. C. 20555

,o JUN 6 M

Ms. Billie Pirner Garde, Director Environmental Whistleblower Clinic Government Accountability Project 1555 Connecticut Avenue, NW, Suite 202 IN RESPONSE REFER Washington, DC 20036 TO F01A-85-312

Dear Ms. Garde:

This is in partial response to your letter dated March 5,1985, in which you requested, pursuant to the Freedom of Information Act (F0IA), records generated in connection with all summary materials provided to the contentions and/or harassment and intimidation panel for their assessment of QA/QC at the Comanche Peak plant.

The documents listed on enclosed Appendix A-1 are being placed in the NRC Public Document Room (PDR), 1717 H Street, NW dashington, DC, in POR folder F01A-85-312 under your name.

The documents listed on enclosed Appendix A-2, with the exceptions of documents 8, 13, 28, 29, 32, and 43 are either in the PDR or will be addressed in our next response.

The documents for which PDR accession numbers are listed are already in the PDR. Documents 23, 24, 25, 36, 39, 44 and the attachment to document 30 are being placed in the PDR in folder F0IA 85-312 under your name. Documents 8, 13, 8, 29, 32, and 43 will be addressed in our next response.

The search for and review of additional records subject to your request have not yet been completed.

We will notify you upon completion of the review.

Sincerely, Donnie H. Grimsley, Director Division of Rules and Records Office of Administration

Enclosures:

As stated 84,06120295 860606

[ARDE 12 PDR E

/

Re: F01A-85-312 APPENDIX A-1

1. TIME-LINE
2. DEFINITION OF INTIMIDATION, HARASSMENT AND DISCRIMINATION FORMAT FOR ANALYSIS OF INTIMIDATION AND DISCRIMINATION AT COMANCHE PEAK
3. GENERAL HANDWRITTEN NOTES
4. GENERAL HANDWRITTEN NOTES
5. STEPS IN ASSESSING QUALITY OF COMANCHE PEAK (Ashok Thadani, Draft 2/12/85)
6. COMANCHE PEAK, " CIVIL / STRUCTURE AND MECHANICAL / PIPING TEAM", L. Shao
7. BACKGROUND INFORMATION ON COMANCHE PEAK, MEMORANDUM FROM T. Rehm, Assistant, OEDO, to E. Triner, Director, RM/B, dated April 28, 1983
8. PIPE STRESS "0 PEN ITEMS AND GENERIC ISSUES", Revision 0, dated 3/13/85
9. COMANCHE PEAK STEAM ELECTRIC STATION, Brown & Root, Inc., Job 35-1195
10. COMANCHE PEAK CONTENTION 5 PANEL, Meeting Summary and Agenda
11. CONTENTION 5 PANEL AGENDA, March 27, 1985
12. STAFF EVALUATION REGARDING OVERALL ADEQUACY OF DESIGN AND CONSTRUCTION AND READINESS FOR LICENSING AT COMANCHE PEAK UNITS 1 and 2, (0UTLINE) 3/19/85
13. COMANCHE PEAK TECHNICAL REVIEW TEAM CATEGORIES OF ALLEGATION REVIEW
14. FORMATION OF PANEL TO PREPARE NRC STAFF POSITION ON COMANCHE PEAK HEARING CONTENTION N0. 5, Memorandum from W. Dircks, EDO, December 24, 1984
15. FORMATION OF PANEL TO PREPARE NRC STAFF POSITION ON INTIMIDATION AT COMANCHE PEAK, Memorandum from W. Dircks, EDO, December 24, 1984
16. PANEL TO PREPARE NRC STAFF POSITION ON COMANCHE PEAK HEARING CONTENTION NO. 5, Memorandum from W. Dircks, EDO, February 28, 1985
17. HANDWRITTEN NOTES " COMANCHE PEAK PANEL MEETING 1/16", AND CPRT PRESENTATION TO CONTENTION 5 PANEL, February 7, 1985 l
18.

SUMMARY

OF PRESENTATION BY CIVIL / STRUCTURAL AND MECHANICAL / PIPING TEAM, Ashok Thadani, Draft March 29, 1985

19. CYGNA (HANDWRITTEN NOTES)
20. ROLE OF CYGNA FINDINGS (HANDWRITTEN NOTES)

/

Re: F0lA-85-312 APPENDIX A _1_

(Continued) l

21. COMANCilE PEAK STATUS AND LISTING OF ACTIONS TO COMPLETE, Memorandum from V. Noonan, Project Director, Comanche Peak Project April 18, 1985
22. COMANCliE PEAK STATUS BRIEFING, V. Noonan, Project Director, Comanche Peak Project, April 12, 1985
23. SCllEDULE OF PANEL ACTIVITIES, Memorandum from J.E. Gagliardo for Comanche Peak Intimidation Panel, January 23, 1985
24. REVISED SCllEDULE OF PANEL ACTIVITIES, Memorandum from J.E. Gagliardo for Comanche Peak Intimidation Panel, January 30, 1985
25.

SUMMARY

OF CURRENT ACTIONS IN THE COMANCHE PEAK PROCEEDING, Memorandum from V.S. Noonan for D.G. Eisenhut February 1, 1985

26. COMANCHE PEAK ACTION ITEMS - SCHEDULE DATE, Memorandum from V.S. Noonan for D.G. Eisenhut, February 4,1985
27. DEFINITION OF INTIMIDATION, liARASSMENT AND DISCRIMINATION
28. CPSES CONTENTION 5 DATA BASE INPUT SHEET - SAMPLE
29. CPSES CONTENTION 5 DATA SilEET INSTRUCTIONS
30. TECilNICAL REVIEW TEAM BRIEFING QUALITY ASSURANCE CONCERNS, January 17, 1985
31. DEFICIENCY DATA SitEET, C0ATINGSi 1/16/85 draf t
32. DISCUSSION WITil TRT CIVIL / STRUCTURAL /MECllANICAL, llandouts, January 30, 1985
33. STAFF EVALUATION REGARDING OVERALL ADEQUACY OF DESIGN AND CONSTRUCTION AND READINESS FOR LICENSING AT COMANCilE PEAK UNITS 1 and 2. Outline, March 19, 1985