3F0898-17, Provides Notification That Due Date for Commitment Re Util 980324 Response to Violations Noted in Insp Rept 50-302/97-12,is Being Extended.Commitment Made by Licensee, Encl

From kanterella
Revision as of 09:30, 25 July 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Provides Notification That Due Date for Commitment Re Util 980324 Response to Violations Noted in Insp Rept 50-302/97-12,is Being Extended.Commitment Made by Licensee, Encl
ML20237E873
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/25/1998
From: Cowan J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
3F0898-17, 3F898-17, 50-302-97-12, NUDOCS 9809010246
Download: ML20237E873 (3)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - . . _ . _ _ _ . - - _ - _ - _ - - - _

d Fl rida Power CORPORATION SENE*sYs"o"2 I gg Operating Ucense No. DPR-72

( 4 August 25,1998 3F0898-17 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001

Subject:

NRC Commitment Due Date Extension

Reference:

FPC to NRC letter, 3F0398-18, Reply to Notice of Violations, NRC Inspection Report No. 50-302/97-12, dated March 24,1998

Dear Sir:

The purpose of this letter is to provide notification that the due date for an NRC commitment is being extended. In the referenced letter, Florida Powir Corporation (FPC) made the following commitment:

Appropriate Quality Assurance Program documentation for the HPl [High Pressure Injection) pumps will be upgraded by August 31, 1998, to reflect the current mission time.

FPC has reviewed the original procurement specifications for the HPl pumps. Areas were identified where the original procurement specifications did not completely envelope or address current service conditions that would be imposed on the pumps during post-accident operation. FPC evaluated differences between the original and cuirent HPl pump post-accident operational requirements, including information contained in existing vendor documentation, and concluded that the HPi pumps are capable of long-term operation in the piggyback mode for the expected mission time.

To formalize the above conclusion, FPC advised the HPI pump vendor of the current post-accident operational requirements and requested that upgraded Quality Assurance Program documentation be provided. The documentation is to be based on the current mission tirne requirements and the most adverse post-accident operational conditions (e.g., debris in the I process fluid, pump maximum flowrate, mechanical seal temperature limits, and gear drive \

cooling water requirements),

, l j

9809010246 980825 o\

PDR ADOCK 05000302 41 G PDR / ,

I l

CRYSTAL RIVER ENERGY COMPLEX: 15760 W. Power Line Street

  • Crystal River, Florida 34428 4708 * (352)795 4486 A Florida Progress Company 4 9

o

( U. S. Nuclear Regulatory Commission l 3F0898-17 Page 2 of 3 The effort necessary by the HPl pump vendor to provide the upgraded Quality Assurance j Progra(a documentation has proven greater than originally anticipated. Also, the upgraded vendor documentation may require changes to FPC documents in order to be in full compliance. The original commitment due date did not account for difficulties encountered by the vendor or the necessity to make changes to FPC documents.

Based on discussions with the HPl pump vendor, a revised schedule for providing the upgraded Quality Assurance Program documentation to FPC is being developed. FPC will submit a revised due date for completion of the subject commitment by September 8, 1998.

If you have any questions regarding this submittal, please contact Mr. Walter Pike, Manager, Nuclear Regulatory Compliance, at (352) 563-4988.

Sincerely, 4 f John Paul Cowan i Vice President Nuclear Operations JPC/dwh Attachment xc: Regional Administrator, Region 11 Senior Resident inspector NRR Project Manager ,

l i

f l

w_________- ._ _

o U. S. Nuclear Regulatory Commission 3F0898-17 Page 3 of 3 ATTACHMENT

.e i The following table contains a listing of commitments contained in FPC's response:

LRESPONSE  ; COMMITMENT? f.DUE DATE

+ SECTION $

Cover letter Based on discussions with the HPl pump vendor, a September 8,1998 revised schedule for providing the upgraded Quality Assurance Program documentation to FPC is being developed. FPC will submit a revised due date for completion of the subject commitment by September 8,1998.

_ _ _ _ _ _