MONTHYEARML20217L8831999-10-21021 October 1999 Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 ML20206E8741999-04-29029 April 1999 SER Determined That Flaw Evaluation Meets Rules of ASME Code & Assumed Crack Growth Rate Adequate for Application ML20205K7581999-04-0707 April 1999 Safety Evaluation Supporting Alternative Proposal for Reexamination of Circumferential Welds with Detected Flaw Indications in Plant RPV ML20203H9881999-02-18018 February 1999 SER Accepting Alternative to 10CFR50.55a(g)(6)(ii)(A) Augmented Reactor Vessel Exam at Vermont Yankee Nuclear Power Station.Technical Ltr Rept Encl ML20199K7151999-01-21021 January 1999 Corrected Safety Evaluation Supporting Amend 163 Issued to FOL DPR-28.Pages 2 & 3 Required Correction & Clarification ML20199K6991999-01-20020 January 1999 Safety Evaluation Concluding That Request to Use YAEC-1339, Yankee Atomic Electric Co Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis, at Vermont Yankee Acceptable ML20199L5951999-01-14014 January 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Code Requirement,Described in Rev 2 to Pump Relief Request RR-P10 Pursuant to 10CFR50.55a(a)(3)(i) ML20195C4161998-11-0909 November 1998 SER Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirement for Class 1,Category B-J Piping Welds ML20155B6471998-10-26026 October 1998 Safety Evaluation Accepting Jet Pump Riser Insp Results & Flaw Evaluation,Conducted During 1998 Refueling Outage ML20154B6951998-10-0101 October 1998 SER Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Vermont Yankee Nuclear Power Station ML20239A1361998-09-0202 September 1998 SER Re License Request for NRC Review & Concurrence W/Changes to NRC-approved Fire Protection Program ML20216F1001998-04-15015 April 1998 Safety Evaluation Accepting 980331 Licensee Proposal to Perform Alternative Testing for Containment Pressurization Test for Vynp ML20217F3421998-03-25025 March 1998 SER Accepting Plans for 1998 & 1999 Refueling Outages Re Reactor Vessel Internals for Plant ML20212H1521998-03-0606 March 1998 Correction to Page 7 of SE Re Relief Request for Third 10-yr Interval Pump & Valve IST Program for Plant ML20217N4911998-02-27027 February 1998 SER Pertaining to Cracking of EDG Lube Oil Piping at Vermont Yankee ML20198P9941998-01-15015 January 1998 SE Authorizing Relief Requests for Third Interval Pump & Valve Inservice Testing Program ML20141A4151997-06-18018 June 1997 Revised SE Accepting Proposed Onsite Disposal of Slightly Contaminated Silt Removed from Vermont Yankee Cooling Towers ML20135E5401997-03-0303 March 1997 Safety Assessment Accepting Mod of RHR & CS Sys Containment Isolation Function Configuration ML20134N8271996-11-20020 November 1996 Safety Evaluation Accepting Licensee Scope & Insp Methods Proposed for Insp of Core Spray Internal Piping During Fall 1996 Refueling Outage at Plant ML20134F9631996-11-0505 November 1996 Safety Evaluation Re Power/Flow Exclusion Region Calculation Method Using LAPUR5 Computer Code & Implementation of Solomon Stability Monitor for Licensee Facility ML20128N3531996-10-11011 October 1996 Safety Evaluation Accepting Licensee Flaw Evaluation of Indication Found During Reactor Pressure Vessel Insp at Plant ML20129G3611996-10-0202 October 1996 Safety Evaluation Accepting Proposed Repair for Plant Core Shroud ML20057A6991993-09-0303 September 1993 Safety Evaluation of IST Program Relief Requests for Pumps & Valves for Third 10-yr Insp Interval ML20057A2791993-08-12012 August 1993 Safety Evaluation Accepting Licensee Reasons Given for Delay in Completing short-term Actions Requested in Ieb 93-003, Resolution of Issues Re to Rv Water Level Instrumentation in Bwrs ML20246D7731989-08-21021 August 1989 Safety Evaluation Supporting Util Response to Generic Ltr 83-28,Item 2.2.1, Required Actions Based on Generic Implications of Salem ATWS Events. Equipment Classification Program for safety-related Components Acceptable ML20244D0311989-06-0707 June 1989 Safety Evaluation Accepting Util Second 10-yr Interval Inservice Insp Program Plan ML20205T4181988-10-14014 October 1988 Errata to Safety Evaluation Concluding Util Submittal Re Spent Fuel Pool Expansion ML20204F7271988-10-14014 October 1988 Safety Evaluation Supporting Proposed Expansion of Spent Fuel Pool at Facility ML20236N6461987-08-0707 August 1987 Safety Evaluation Re Permanent Elimination of Liquid Penetrant Exam of Feedwater Nozzles at Facility.Due to Lack of Reasonable Assurance That Ultrasonic Exam Can Totally Replace Penetrant Exam,Request Unacceptable ML20214T9891987-05-28028 May 1987 Safety Evaluation Re Util 870112 Proposed Plans to Inspect Two Overlay Repaired Core Spray safe-ends in Lieu of Replacement During Upcoming 1987 Refueling Outage.Plans Acceptable,Providing That Insp Results Satisfactory ML20207S7801987-03-12012 March 1987 Safety Evaluation Granting Relief from Tech Spec 4.7.A.3 on one-time Basis to Perform RHR Pump Wear Ring Replacement ML20214T4921986-11-24024 November 1986 Safety Evaluation Accepting Licensee 830511 & 860117 Responses to Generic Ltr 83-08 Re Mod of Vaccum Breakers on Mark I Containments ML20215M5871986-10-24024 October 1986 Preliminary Evaluation of Containment Study Transmitted w/860902 Ltr.Licensee Estimates Appear Optimistic Considering Uncertainties Inherent in Failure Rate Data ML20206F3651986-06-16016 June 1986 Safety Evaluation Re Proposed Repair of Core Spray safe- Ends,During Current Refueling Outage.Plant Can Be Safely Returned to Power Operation After Satisfactory Completion of Core Spray safe-end Repairs ML20206F0681986-06-13013 June 1986 Safety Evaluation Supporting 850514,0710,860327,0411 & 0513 Requests for Approval to Use Pvrc Damping Values (ASME Code Case N-411) for Piping Sys Reanalysis ML20202J4211986-03-31031 March 1986 Safety Evaluation Accepting Util Design Mods & Tech Spec Changes Re Degraded Grid Voltage Protection for Class 1E Sys.Lll Technical Evaluation Rept Encl ML20155B8351986-03-31031 March 1986 Safety Evaluation Supporting Revised Procedure OP-3140, Providing Technically Acceptable Actions During Degraded Grid Voltage Conditions W/O LOCA to Assure Protection of Class 1E Electrical Sys & Equipment ML20140H9881986-03-25025 March 1986 Safety Evaluation Re Util 851008 Request to Install Carpet Over Vinyl Asbestos Tiled Control Room Floor Covering. Installation of Carpet Will Not Decrease Level of Fire Safety in Control Room & Deviation Acceptable ML20138E4201985-12-0202 December 1985 Safety Evaluation Supporting Util 831107 & 840320 Responses to Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1,3.2.2 & 4.5.1 Re post-maint Testing & Reactor Trip Sys Reliability ML20136F1241985-11-18018 November 1985 Safety Evaluation Re IE Bulletin 80-11, Masonry Wall Design. Issues Re Arching Action Theory Resolved ML20137S7331985-09-27027 September 1985 Safety Evaluation Approving Use of Fuel Thermal Performance Code,Frosstey,For Analysis of LOCA Conditions at Low & Moderate Burnups ML20135C8921985-09-10010 September 1985 Safety Evaluation Supporting 840824 Commitment to Convert Air Containment Atmosphere Dilution Sys to Nitrogen Sys,In Response to Generic Ltr 84-09 ML20135C9121985-09-10010 September 1985 Safety Evaluation Supporting Conclusion That Diversification of Scram Discharge Vol Level Instrumentation Not Necessary & Tech Specs,As Modified in Amend 76,resolve Staff Concerns Re Need for Instrumentation Diversity ML20134K7351985-08-19019 August 1985 Safety Evaluation Accepting 831107 Response to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re post-maint Testing ML20136G3611985-08-12012 August 1985 Safety Evaluation Accepting Seismic Design Criteria Utilized for Evaluation of Modified Recirculation Sys ML20132D8971985-07-22022 July 1985 Safety Evaluation Supporting Use of Pvrc Damping Values (ASME Code Case N-411) for Response Spectrum Seismic Piping Analyses ML20127D8991985-05-0606 May 1985 Safety Evaluation Re 840925 & 1002 Responses to Generic Ltr 83-28,Item 1.1 Concerning post-trip Review Program & Procedures.Program & Procedures Acceptable 1999-09-17
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L8831999-10-21021 October 1999 Safety Evaluation Supporting Proposed Alternatives to Code Requirements Described in RR-V17 & RR-V18 ML20217G2041999-10-13013 October 1999 Safety Evaluation Supporting Amend 179 to License DPR-28 BVY-99-127, Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Vermont Yankee Nuclear Power Station.With ML20212C2551999-09-17017 September 1999 Safety Evaluation Supporting Amend 175 to License DPR-28 BVY-99-112, Monthly Operating Rept for Aug 1999 for Vermont Yankee.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Vermont Yankee.With BVY-99-109, Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 9908311999-08-19019 August 1999 Ro:On 990812,stack Ng Effluent Instrumentation for PAM Was Declared Oos.Caused by Instrument Drift Due to Electronic Components Based on Insps by Instrumentation & Controls Dept.Detector & Preamplifier Will Be Replaced on 990831 BVY-99-102, Monthly Operating Rept for July 1999 for Vermont Yankee. with1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Vermont Yankee. with ML20209J0081999-07-14014 July 1999 Special Rept:On 990615,diesel Driven Fire Pump Failed to Achieve Rated Flow of 2500 Gallons Per Minute.Pump Was Inoperable for Greater than 7 Days.Corrective Maint Was Performed to Reset Pump Lift Setting BVY-99-090, Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Vermont Yankee Nuclear Power Station.With ML20196G5071999-06-23023 June 1999 Vynp Assessment of On-Site Disposal of Contaminated Soil by Land Spreading BVY-99-077, Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Vermont Yankee Nuclear Power Station.With BVY-99-068, Monthly Operating Rept for Apr 1999 for Vynp.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Vynp.With ML20206E8741999-04-29029 April 1999 SER Determined That Flaw Evaluation Meets Rules of ASME Code & Assumed Crack Growth Rate Adequate for Application ML20206D9301999-04-27027 April 1999 1999 Emergency Preparedness Exercise 990427 Exercise Manual (Plume Portion) ML20205S4211999-04-16016 April 1999 Non-proprietary Version of Revised Page 4-3 of HI-981932 Technical Rept for Vermont Yankee Spent Fuel Pool Storage Expansion ML20205K7581999-04-0707 April 1999 Safety Evaluation Supporting Alternative Proposal for Reexamination of Circumferential Welds with Detected Flaw Indications in Plant RPV BVY-99-046, Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Vermont Yankee Nuclear Power Station.With ML20205F6631999-03-0404 March 1999 Jet Pump Riser Weld Leakage Evaluation BVY-99-035, Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Vermont Yankee Nuclear Station.With ML20205P8241999-02-28028 February 1999 Rev 2 to Vermont Yankee Cycle 20 Colr ML20203H9881999-02-18018 February 1999 SER Accepting Alternative to 10CFR50.55a(g)(6)(ii)(A) Augmented Reactor Vessel Exam at Vermont Yankee Nuclear Power Station.Technical Ltr Rept Encl ML20203A6951999-02-0404 February 1999 Revised Rev 2,App B to Vermont Yankee Operational QA Manual (Voqam) ML20199K7151999-01-21021 January 1999 Corrected Safety Evaluation Supporting Amend 163 Issued to FOL DPR-28.Pages 2 & 3 Required Correction & Clarification ML20199K6991999-01-20020 January 1999 Safety Evaluation Concluding That Request to Use YAEC-1339, Yankee Atomic Electric Co Application of FIBWR2 Core Hydraulics Code to BWR Reload Analysis, at Vermont Yankee Acceptable ML20199L5951999-01-14014 January 1999 Safety Evaluation Accepting Licensee Proposed Alternative to Code Requirement,Described in Rev 2 to Pump Relief Request RR-P10 Pursuant to 10CFR50.55a(a)(3)(i) BVY-99-071, Corp 1998 Annual Rept. with1998-12-31031 December 1998 Corp 1998 Annual Rept. with BVY-99-001, Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Vermont Yankee Nuclear Power Station ML20198H5481998-12-23023 December 1998 Rev 2 to Vermont Operational QA Manual,Voqam ML20196H8641998-12-0101 December 1998 Cycle 19 Operating Rept BVY-98-163, Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Vermont Yankee Nuclear Power Station.With ML20195C4161998-11-0909 November 1998 SER Accepting Request That NRC Approve ASME Code Case N-560, Alternative Exam Requirement for Class 1,Category B-J Piping Welds BVY-98-154, Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Vermont Yankee Nuclear Power Station.With ML20155B6471998-10-26026 October 1998 Safety Evaluation Accepting Jet Pump Riser Insp Results & Flaw Evaluation,Conducted During 1998 Refueling Outage ML20154N0891998-10-16016 October 1998 Rev 1 to Vermont Operational QA Program Manual (Voqam) ML20154B6951998-10-0101 October 1998 SER Re Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Vermont Yankee Nuclear Power Station BVY-98-149, Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Vermont Yankee Nuclear Power Station.With ML20239A1361998-09-0202 September 1998 SER Re License Request for NRC Review & Concurrence W/Changes to NRC-approved Fire Protection Program BVY-98-135, Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Vermont Yankee Nuclear Power Station.With ML20151U0361998-08-28028 August 1998 Non-proprietary Rev 1 to Holtec Rept HI-981932, Vermont Yankee Nuclear Power Station Spent Storage Expansion Project ML20237E9221998-08-20020 August 1998 Vynp 1998 Form NIS-1 Owners Summary Rept for ISI, 961103-980603 BVY-98-122, Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Vermont Yankee Nuclear Power Station ML20205F6491998-07-31031 July 1998 Rev 1 to GE-NE-B13-01935-02, Jet Pump Assembly Welds Flaw Evaluation Handbook for Vermont Yankee ML20236G0011998-06-30030 June 1998 Individual Plant Exam External Events BVY-98-098, Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station1998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Vermont Yankee Nuclear Power Station ML20248C5081998-05-31031 May 1998 Rev 2 to 24A5416, Supplemental Reload Licensing Rept for Vermont Yankee Nuclear Power Station Reload 19 Cycle 20 ML20248C4951998-05-31031 May 1998 Rev 1 to Vermont Yankee Nuclear Power Station Cycle 20 Colr BVY-98-081, Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station1998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Vermont Yankee Nuclear Power Station ML20247J8341998-05-31031 May 1998 Peak Suppression Pool Temp Analyses for Large Break LOCA Scenarios, for May 1998 ML20247G4001998-05-12012 May 1998 Interview Rept of Ej Massey ML20247E6351998-04-30030 April 1998 Rev 1 to GE-NE-B13-01935-LTR, Jet Pump Riser Welds Allowable Flaw Sizes Ltr Rept for Vermont Yankee 1999-09-30
[Table view] |
Text
i .
l'e =
put:
p % UNITED STATES j
l i g NUCLEAR REGULATORY COMMISSION
(
o WASHP* CON, D.C. 30666 0001
(*****.$
I SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO ALTERNATIVE CONTAINMENT PRESSURIZATION TEST VERMONT YANKEE NUCLEAR POWER CORPORATION VERMONT YANKEE NUCLEAR POWER STATION DOCKET NO. 50-271 1
1.0 INTRODUCTION
The Technical Specifications (TS) for Vermont Yankee Nuclear Power Station (VY) states that the inservice inspection of the American Society of Mechanical Engineers (ASME) Code Class 1,2 and 3 components shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel (B&PV) Code and applicable addenda as required by 10 CFR 50.55a(g), except where specific written relief has been granted by the Commission pursuant to 10 CFR 50.55a(g)(6)(i). The 10 CFR 50.55a(a)(3) states that attematives to the requirements of paragraph (g) may be used, when authorized by the Nuclear Regulatory ;
Commission (NRC), if (i) the proposed attematives would provide an acceptable level of quality I and safety or (ii) compliance with the specified requirements would result in hardship or unusual i difficulties without a compensating increase in the level of quality and safety. I Pursuant to 10 CFR 50.55Mg)(4), ASME Code Class 1,2 and 3 components (including supports) shall meet the requirements, except the design and access provisions and the pre-service examination requirements, set forth in the ASME Code,Section XI, " Rules for Inservice inspection of Nuclear Power Plant Components," to the extent practical within the limitations of design, geometry, and materials of construction of the components. The regulations require that inservice examination of components and system pressure tests conducted during the first 10-year interval and subsequent inte vals comply with the requirements in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and l modifications listed therein. Pursuant to 10 CFR 50.55a(g)(5), if the licensee determines that l conformance with an examination requirement of Section XI of the ASME Code is not practical for its facility, information shall be submitted to the Commission in support of that determination and a request made for relief from the ASME Code requirement. After evaluation of the determination, pursuant to 10 CFR 50.55a(g)(6)(i), the Commission may grant relief and may impose attemative requirements that are determined to be authorized by law, will not endanger life, property, or the common defense and security, and are otherwise in the public interest, giving due consideration to the burden upon the licensee that could result if the requirements were imposed. In a letter dated March 31,1998, Vermont Yankee Nuclear Power Corporation (the licensee), requested that the NRC staff approves an attemative to the requirements of the ASME Code,Section XI pertaining to testing of its VY containment.
9804160418 980415 PDR ADOCK 05000271 P PDR l
.; u l ' 2.0 EVALUATION j The licensee submitted the subject request to use an attemative to the requirements of ASME Code,Section X!. The Code of record for the third intervalis the ASME Code,Section XI,1986 Edition. The ir. formation provided by the licensee !n support of the request has been evaluated and the bases for disposition are documented below.
2.1 Code Reauirement: Section XI, paragraph IWE-5221 states: "Except as noted in IWE-5222, repairs or modifications to the pressure retaining boundary or replacement of Class MC
, or Class CC components shell be subjected to a pneumatic leakage test in accordance with the provisions of Title 10, Part 50 of the Code.of Federal Regulations, Appendix J
requested relief from the requirement to perform post repair testing of its VY containment as '
required by IWE-5221. '
2.3 Licensee's Basis for Rannastino Relief (as stated):
"The intent of 10 CFR [Part) 50, Appendix J is to ensure that the escape of containment air to the atmosphere fotowing c :ksign basis accident is maintained below established limits by the L performance of r. pneumatic leakage test. This testing requires extensive pressure stabilization er d ter@rature eaualization for the test. The actual performance of the test requires soproximately 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of stabilization, temperature equalization, leakage testing and 1 verification. In addition, the Type A test requires extensive system line-up and extensive l
l supplementalinstrumentation requirements. None of these issues apply to the concem of l structural integrit*/ or water leak tightness of the repair area. Since the repair being made to the l.
torus is entirely located below the normal and post accident water level of the torus, the repair !
area is completely water-sealed against any potential air leakage. l The propesed attemative test is to pressurize the containment air volume to a minimum of 44 psig and hold for a minimum of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This test exceeds the maximum suppression chamber
. pressure postulated during worst case accident conditions and will subject the repaired area of the torus shell to both the containment air volume pressure and the static pressure of the standing head of water. !
This proposed altamative testing is also justified due to the extensive non-destructive testing i that will be conducted. The shell repair will a"empt to reuse the existing plate through the use
!- of thin cutting tools and techniques. New plate :nsterial, curved to match the contour of the torus, will be available if regi:! red. The shell repair will be accomplished under 1977 edition summer addenda of ASME Secton ill, class MC, subsections NE. In conformance to ASME NE requirements, full radiographic test (RT) will be performed on the final weld joint. In addition to the requirements of ASME, VY will be performing the following; liquid penetrant inspection of the weld props, visual inspection of the root pass of the weld, magnetic particle inspection and liquid penetrant inspection of the completed welds, and the use of charpy qualifed weld materials and weld procedures. This wili assure that the integrity of the repair meets or exceeds the quality requirements of the existing torus shell. Industry experience has proven that current state of the art non-destructive testing techniques provide an accurate assessment 3 of the acceptability of structural welds."
e s,%
2.4 Licensee's Pronomed Altamative Examination (as stated):
"The proposed alternative test is to pressurize the containment air volume to a minimum of 44
_ psig and hold for a minimum of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This test exceeds the m=ximum suppression chamber pressure postulated during worm case accident conditions arm . vill ubject the repaired area of the torus shell to both the containment air volume pressure and the static pressure of the standing head of water."
Evaluation: The licensee has requested relief from the Code requirements to perform leakage test following repair as required by IWE-6221 of ASME Code,Section XI. The licensee is
[ '
proposing to perform an altemative testing of the W torus. The need for the testing occurred
! because during the current refue!;ng outage, W will be replacing the core spray and residual heat removal system suction strainers which are located v#hin the torus. Because of the physical dimensions of tho new strainers, installation of the strainers cannot be accomplished by use of the existing hatches in the torus space. Consequently, W has opted to cut a
! temporary hatch into the torus rather than constructing the strainers inside the torus. The location for this new hatch was selected based can freedom from obstructions, ease of access, l and ability to facilitate traffic flow and rigging of the strainer sections. The temporary hatch will be made by cutting and removing a section of torus shell. The location of this entire hatch will be below the normal and post accident water line in tie torus.
Pursuant to 10 CFR 55a(a)(3)(i)W is proposing to perform attemative testing to that specified by IWE-5221. The proposed attemative testing to verify structuraland water leak tightness would be to perform a pressurization test of the entire containment (drywell and suppression chamber) including the affected torus area with the torus water volume at that specified by Technical l Specifications. This pressurizationtest will consist of pneumatically pressuri::ing the containment air volume to a minimum of 44 psig and holding the pressure for a minimum of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. During the performance of this test, a visualinspection of the torus shellin the area of the repair will be made
[. to verify that there is no visible leakage and/or structural deformation. In addition, the shell repair l '
will be accomplished underthe rules of 1977 edition summer addanda of ASME Section ill, class MC, subsections NE. In conformance to ASIVE NE requirements full RT will be performed on the final weld joint. In addition to the requiremeras of ASME, W will be performing the following; liqub p penetrantinspectionof the weld prepara r' 4.:rfaces,visualinspectionof the root pass of the weld, l
magnetic particle inspection and liquid penetrant inspection of the completed welds, and the use of charpy V-notch qualified weld materials and weld procedures. This will ensure that the integ-ity of the repair meets or exceeds the quality requirements of the existing torus shell.
3.0 CONCLUSION
The NRC staff concludes that the licensee has provided an acceptable attemative to the requirementsstatedin paragraphlWE-5221 of the ASME Code,Section XI. The staff, therefore, concludes that authorization of the licensee's alternative program would provide an ecceptable level of quality and safety, is authorized by law and will not endanger life or property o" cc inmon defense and security, and is otherwise in the public interest, giving due consideration to the butden upon the licensee and facility that could restift if the Code requirements were imposed on the facility.
Pursuant to 10 CFR 50.55a(a)(3)(i) the attemative is authorized.
Principal Contributor: G. Georgiev Date: