ML20265A094

From kanterella
Revision as of 04:34, 8 March 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1 Alternative Request IST-RR-8
ML20265A094
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/21/2020
From: Kimberly Green
NRC/NRR/DORL/LPL2-2
To: Wells R
Tennessee Valley Authority
References
L-2020-LLR-0161
Download: ML20265A094 (2)


Text

From: Green, Kimberly Sent: Monday, September 21, 2020 7:37 AM To: Wells, Russell Douglas Cc: Williams, Gordon Robert; Shoop, Undine

Subject:

Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1 Alternative Request IST-RR-8 (EPID L-2020-LLR-0161)

Dear Mr. Wells:

By letter dated September 1, 2020 (Agencywide Documents Access and Management System Accession No. ML20245E518), Tennessee Valley Authority (TVA) submitted an alternative request for Watts Bar Nuclear Power, Unit 1 regarding residual heat removal pump 1B-B. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of the proposed alternative request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.

The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in TVAs submittal, the NRC staff has estimated that this licensing request will take approximately 130 hours0.0015 days <br />0.0361 hours <br />2.149471e-4 weeks <br />4.9465e-5 months <br /> to complete and that the review can be completed by May 15, 2021. These estimates are based on the staffs initial review of the application. If there are emergent challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates will be communicated, during the routine interactions.

If you have any questions, please email me or contact me at (301) 415-1627.

Sincerely, Kimberly Green, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Hearing Identifier: NRR_DRMA Email Number: 796 Mail Envelope Properties (MN2PR09MB5388A3CD64F278D49E392AE58F3A0)

Subject:

Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1 Alternative Request IST-RR-8 (EPID L-2020-LLR-0161)

Sent Date: 9/21/2020 7:37:11 AM Received Date: 9/21/2020 7:37:11 AM From: Green, Kimberly Created By: Kimberly.Green@nrc.gov Recipients:

"Williams, Gordon Robert" <grwilliams1@tva.gov>

Tracking Status: None "Shoop, Undine" <Undine.Shoop@nrc.gov>

Tracking Status: None "Wells, Russell Douglas" <rdwells0@tva.gov>

Tracking Status: None Post Office: MN2PR09MB5388.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2820 9/21/2020 7:37:11 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: