ML20216C427

From kanterella
Revision as of 09:51, 6 March 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of 980521 Meeting W/Peco Energy Co in King of Prussia,Pennsylvania to Discuss Reactor Feed Pump Trip Operability & Core Spray Pump Foreign Matl Exclusion - Predecisional Enforcement Conference
ML20216C427
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/17/1998
From: Anderson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
98-36, NUDOCS 9805190258
Download: ML20216C427 (2)


Text

,. .. .

April 17,1998 No. 98-36 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee: PECO Energy Company Facility: Peach Bottom Atomic Power Station Docket Nos.: 50-277;50-278 Date and Time: 10:00 a.m., Thursday, May 21,1998 Location: USNRC - Region i Public Meeting Room King of Prussia, PA

Purpose:

Discuss: Reactor Feed Pump Trip Operability; Core Spray Pump Foreign Material Exclusion - Predecisional Enforcement Conference NRC Attendees: J. Crienjak, Deputy Director (DRP)

C. Hehl, Director, Division of Reactor Projects (DRP C. Anderson, Chief, Project Branch No. 4, DRP A. McMurtray, Senior Resident inspector, Peach Bottom, DRP D. Florek, Project Engineer, Project Branch No. 4, DRP Licensee Attendees: D. Smith, President, PECO Nuclear G. Rainey, Sr. Vice President, Nuclear Operations, PECO Nuclear J. Doering, Vice President, Peach Bottom Atomic Power Station M. Warner, Plant Manager, Peach Bottom Atomic Power Station NOTE: This meeting is open to the public. Attendance by additional NRC personnel or handicapped persons requiring assistance to attend the meeting should be made known by May 17,1998, via telephone call to Cliff Anderson Region I, at (610) 337-5227.

Ori9 inai N Prepared DY!

Ciittord J Anderson, Chief Project Branch No. 4 g51Og G

80 y77 Division of Reactor Projects PDR

\u

\

tf

! l s

l

' l 2

l J

Distribution: (Via E-Mail) l l L. Callan, Executive Director for Operations, OEDO '

l H. Thompson, Deputy Executive Director for Regulatory Programs E. Jordon, Deputy Executive Director for Regulatory Effectiveness, OEDO S. Collins, Director, Office of Nuclear Reactor Regulation (NRR)

J. Lieberman, Director, Office of Enforcement T. Martin, Director, Division of Reactor Program Management, NRR D. Ross, Deputy Director, Office of Analysis and Evaluation of Operational Data, AEOD D. Matthews, Acting Deputy Director, Division of Reactor Program Management, NRR l R. Spessard, Deputy Directc Division of Reactor Controls and Human Factors, NRR R. Zimmerman, Associate Director for Projects, NRR B. Boger, Direptor, Division of Reactor Projects - 1/II, NRR l N. Green, Jr., Policy Development & Technical Support Branch i R. Capra, Director, PD l-2, NRR l B. McCabe, Regional Coordinator, OEDO M. Thadani, Project Manager, Peach Bottom, PD l-2, NRR W. Schmidt, SRI, PB  ;

D. Screnci, Public Affairs Officer, RI N. Sheehan, Field Public Affairs Officer, Rl R. Bores, ORA M. Campion, ORA Distribution:

PUBLIC i D.M. Smith, PECO Energy State of Pennsylvania l State of Maryland RA Secretary, RI l

. DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist DOCUMENT NAME: G:\ BRANCH 4\PB0521 To receive a copy of this document. Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE Rl/DRP l / l / l l l l NAME CAnderson c?p DATE 04/15/98 v/h/fr 04/ /98 04/ /98 04/ /98 04/ /98 0FFICIAL RECORD COPY