Letter Sequence Draft Approval |
---|
|
|
MONTHYEARML20141L6202020-05-22022 May 2020 Request for Withholding Information from Public Disclosure in Holtec International March 19, 2020, Submittal of Thermal Topical Report on the HI-STORM 100 and HI-STORM FW Systems Project stage: Withholding Request Acceptance ML20141L6212020-05-22022 May 2020 Acceptance for Review of Holtec International Thermal Topical Report on the HI-STORM 100 and HI-STORM Systems Project stage: Acceptance Review ML20202A6582020-06-29029 June 2020, 17 July 2020 July 17, 2020 Holtec Topical Report Review Public Meeting Project stage: Request ML20244A0232020-09-0101 September 2020 September 9, 2020 - Regulatory Audit Plan for Holtec International (Holtec) Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-Storm FW Systems (EPID L-2020-TOP-0018) Ltr Project stage: Other ML20282A5252020-11-0202 November 2020, 3 November 2020 Audit Report Regarding the September 9, 2020, Regulatory Audit for Holtec International Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-StormFW Systems Project stage: Request ML20282A5262020-11-0202 November 2020 Transmittal Letter for Audit Report Regarding the September 9, 2020, Regulatory Audit for Holtec International Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-Storm FW Systems Project stage: Other ML20282A5272020-11-0303 November 2020 Audit Report Regarding the September 9, 2020, Regulatory Audit for Holtec International Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-StormFW Systems (EPID: L-2020-TOP-0018)(Non-Proprietary) Project stage: Other ML21034A5962021-02-17017 February 2021 Transmittal of Draft Safety Evaluation for Holtec International Topical Report HI220034, Topical Report for Allowance of Heat Load Patterns in HI-STORM 100 and HI-STORM FW Systems Project stage: Draft Approval PMNS20210234, Closed Meeting with Holtec International (Holtec) and the U.S. Nuclearregulatory Commission (NRC) Regarding Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-Storm FW Systems2021-02-26026 February 2021 Closed Meeting with Holtec International (Holtec) and the U.S. Nuclearregulatory Commission (NRC) Regarding Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-Storm FW Systems Project stage: Request ML21092A1652021-04-0202 April 2021 Attachment 3: Responses to NRC Staff'S Open Items Project stage: Request ML21092A1622021-04-0202 April 2021 Submittal of Holtec Proprietary Information Review and Response to Open Items on the Thermal Topical Report on the HI-STORM 100 and HI-STORM FW Systems Project stage: Request ML21082A0852021-04-0909 April 2021 Summary of Closed Meeting with Holtec International and U.S. Nuclear Regulatory Commission Regarding Topical Report for Allowance of Heat Load Patterns in Hi-Storm 100 and Hi-Storm FW Systems Project stage: Meeting ML21125A1862021-09-14014 September 2021 Final Safety Evaluation for Holtec International Topical Report HI-2200343 Revision 2, Topical Report for Allowance of Heat Load Patterns in HI-STORM 100 and Hi STORM FW Systems Project stage: Request ML21125A1912021-09-14014 September 2021 Transmittal Letter U.S. NRC Final Safety Evaluation for Holtec International Topical Report HI-2200343 Revision 2, Topical Report for Allowance of Heat Load Patterns in HI-STORM 100 and Hi STORM FW Systems Project stage: Approval ML21216A1812021-09-14014 September 2021 Non-Proprietary Enclosure 1 U.S. NRC Final Safety Evaluation for Holtec International Topical Report HI-2200343 Revision 2, Topical Report for Allowance of Heat Load Patterns in HI-STORM 100 and Hi STORM FW Systems Project stage: Approval ML21302A1482021-09-29029 September 2021 Attachment 3: Affidavit Pursuant to 10CFR2.390 Project stage: Other ML21302A1452021-09-29029 September 2021 Submittal of Topical Report HI-200343 - a Version Project stage: Other ML21302A1472021-10-29029 October 2021 Attachment 2: HI-2200343-A Topical Report for Allowance of Heat Load Patterns in HI-STORM and HI-STORM FW Systems (Non-Proprietary Version) Project stage: Other ML21336A4582021-12-16016 December 2021 NRC 896 Form for the U.S. Nuclear Regulatory Commission Staff -A Verification of the HI-2200343, Rev 2, Topical Report for Allowance of Heat Load Patterns in HI-STORM 100 and HI-STORM FW (Flood Wind) Systems Project stage: Other ML21336A4502021-12-17017 December 2021 Transmittal Email of NRC 896 Form for U.S. Nuclear Regulatory Commission Staff -A Verification of the HI-2200343, Rev 2, Topical Report for Allowance of Heat Load Patterns in HI-STORM 100 and Hi STORM FW (Flood Wind) Systems Project stage: Other 2021-12-16
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24276A1492024-09-23023 September 2024 Acceptance Review of Request for Amendment No. 19 to Certificate of Compliance No. 1014 for the HI-STORM 100 Multipurpose Canister Storage System NRC-2024-0085, Response from State of MD Regarding Review of EA for Calvert Cliffs Exemption Request2024-05-0909 May 2024 Response from State of MD Regarding Review of EA for Calvert Cliffs Exemption Request ML24052A2062024-03-0101 March 2024 Email NRC Forms 897 and NRC 896 for the U.S. Nuclear Regulatory Commission Staff Verification and Prop Withholding for Holtec International Administrative Change to HI-2200343-A ML24009A2302024-01-25025 January 2024 Transmittal Email for Verification of - a Version Shielding Topical Report ML23363A1482023-12-20020 December 2023 Approval of Holtec International Request for Withholding Information from Public Disclosure-Certificate of Compliance No. 1014, Hi-Storm 100 Cask System, Amendment No. 16 ML23342A2162023-12-0505 December 2023 SUNSI-Proprietary Determination Email - Holtec Submittal of Supplement to RAI (Round 2) Responses on HI-STORM 100 Amendment 18 ML23320A2282023-11-0606 November 2023 NRC Follow Up from EA-23-044 Holtec Pec E-mail to Holtec ML23257A0402023-09-12012 September 2023 SUNSI and Proprietary Review Determination Email Regarding: Holtec HI-STORM 100 Amd. 18 - Supplemental RAI Responses ML22276A1642022-09-29029 September 2022 New York State Revised Draft EA Response E-Mail ML22271A8492022-09-28028 September 2022 E-Mail Transmitting Revised Indian Point Exemption Draft EA ML22263A4632022-09-15015 September 2022 SUNSI and Proprietary Review Determination Email Regarding: Holtec HI-STORM 100 Amd. 18 - Rsi Responses ML22215A0432022-08-0101 August 2022 E-Mail Transmitting NYS NSA Exemption Comments & Draft EA Review Completion ML22054A1112022-02-23023 February 2022 Email to Holtec: Revised Schedule for Amendment 7 to Certificate of Compliance No. 1032 for HI-STORM Flood/Wind Multipurpose Canister Storage System ML22006A3472022-01-0606 January 2022 1-6-2022 Email to K. Manzione Re Revised Schedule for HI-STORM 100 CoC Renewal ML21336A4502021-12-17017 December 2021 Transmittal Email of NRC 896 Form for U.S. Nuclear Regulatory Commission Staff -A Verification of the HI-2200343, Rev 2, Topical Report for Allowance of Heat Load Patterns in HI-STORM 100 and Hi STORM FW (Flood Wind) Systems ML21193A1422021-07-12012 July 2021 Approval of Holtec International Request for Withholding Information from Public Disclosure - Final Safety Analysis Report Revision 9 for the FW MPC Storage System ML21034A5962021-02-17017 February 2021 Transmittal of Draft Safety Evaluation for Holtec International Topical Report HI220034, Topical Report for Allowance of Heat Load Patterns in HI-STORM 100 and HI-STORM FW Systems ML21039A3902021-02-0505 February 2021 SUNSI and Proprietary Review Determination Email Regarding: Holtec Draft Moe Topical Report ML20112F5232020-04-20020 April 2020 Maryland Department of the Environment Draft EA Review Response for the Exemption Request for the Calvert Cliffs Nuclear Power Plant ML20086L4932020-03-25025 March 2020 Email: Acknowledgement--Holtec Withdraw HI-STORM FW Amendment No. 7 ML20086F4792020-03-23023 March 2020 Email: HI-STORM 100 Amendment No. 15, Proposed CoC Condition 3 ML20077J5502020-03-16016 March 2020 Draft EA Transmittal E-Mail ML19200A0412019-07-18018 July 2019 E-Mail from Y. Chen/Nrc to J. Tomlinson/Holtec Response: HI-STORM 100 Amd. 15 Date for Rsi Response Submittal NL-19-062, Registration of Spent Fuel Cask Use2019-07-0202 July 2019 Registration of Spent Fuel Cask Use ML19011A0832019-01-10010 January 2019 E-Mail from M. Burgess to C. Vanderniet Holtec Presentation ML18095A1412018-04-0505 April 2018 E-Mail from Y. Chen/Nmss/Dsfm to R. Ngwayah/Holtec HI-STORM FW Amendment 4 Due Date Extension ML18067A2242018-03-0808 March 2018 E-Mail from Y. Chen to N. Royston Question on Irradiated Dummy Rods Analysis ML17353A0092017-12-18018 December 2017 E-Mail from William Irwin, Vermont Department of Health to Y. Chen/Dsfm Response: Draft Environmental Assessment: Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation ML17289A4222017-10-16016 October 2017 E-Mail from Y. J. Chen to W. Irwin Draft Environmental Assessment Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation ML17257A0022017-09-14014 September 2017 Email to VY Shpo W Ltr Re VYNPS Exemption Load Campaign - Sept 2017 ML17219A0472017-08-0303 August 2017 8/03/2017, E-Mail from Y. J. Chen/Nmss to T. B. Silko/Vermont Yankee Regarding Need for Additional Information Entergy'S Exemption Request for Vermont Yankee ISFSI, Dated May 16, 2017 (ML17142A358) ML17144A0452017-05-23023 May 2017 5/23/2017, E-Mail to I. William/Vermont Dept. of Health from Y. Chen/Nrc Response: Draft Environment Assessment: Exemption Request for Vermont Yankee Independent Spent Fuel Storage Installation (W/Attachment Ltr to Address Comments on EA) ML17080A4752017-03-16016 March 2017 3/16/2017, E-Mail from I. William/Vermont Department of Health to Yen-Ju Chen/Dsfm/Sflb, Providing Comments on Draft Environmental Assessment for Entergy/Vermont Yankee'S Exemption from Requirement of 10 CFR 72.7 for CoC No. 72-1014, Amendm ML17040A3372017-02-0909 February 2017 Email and Letter to Vermont Shpo ISFSI Exemption No Effects Determination ML17038A4682017-02-0707 February 2017 2/07/2017, E-mail from Yen-Ju Chen/NRC-DSFM to W. Irwin/Vermont Dept. of Health Draft Environment Assessment for Entergy/Vermont Yankee'S Exemption from Requirement of 10 CFR 72.7 for Certificate of Compliance No. 72-1014, Amendment 10 ML16349A2492016-12-13013 December 2016 E-Mail to T. B. Silko/Entergy from Yen-Ju Chen/Dsfm Regarding Need for Supplemental Information for Entergy'S Exemption Request for Vermont Yankee ISFSI, Dated November 9, 2016 (ML16319A102) ML14328A2872014-11-21021 November 2014 E-Mail from B. Bevill to W. C. Allen Arkansas Department of Health'S Review - Ano'S Exemption Request and the NRC Environmental Assessment, November 21, 2014 ML0929604262009-10-23023 October 2009 Email on ISFSI Control of Heavy Loads ML0901505272009-01-0909 January 2009 E-mail from Kara Stacy (Harris Licensing) Providing Clarifications to Questions Regarding the Amendment to Change to the Metamic Neutron Absorber in the Spent Fuel Pools 2024-09-23
[Table view] |
Text
From: Perkins, Leslie To: Debu Majumdar Cc: Bajwa, Chris; Piotter, Jason
Subject:
DRAFT SAFETY EVALUATION FOR HOLTEC INTERNATIONLTOPICAL REPORT HI-2200343, TOPICAL REPORT FOR ALLOWANCE OF HEAT LOAD PATTERNS IN HI-STORM 100 AND HI-STORM FW SYSTEMS Date: Wednesday, February 17, 2021 1:32:00 PM
Dear Dr. Mitra-Majumdar,
By letter dated March 19, 2020 (Agencywide Documents Access and Management System (ADAMS) Package Accession No. ML20101N174), Holtec International (Holtec) submitted for U.S. Nuclear Regulatory Commission (NRC) staff review the Topical Report (TR) HI-2200343 Revision 0, Topical Report for Allowance of Heat Load Patterns in HI-STORM 100 and HISTORM FW Systems.
A copy of the draft safety evaluation (SE) with open items has been placed in the box.com folder. Holtec has been given access to the folder. The draft SE is being provided for proprietary information review and for Holtec to provide responses to the NRC staffs open items. If Holtec provides comments on other areas, the NRC staff will exercise its discretion on whether to address those comments.
Pursuant to Section 2.390 of Title 10 of the Code of Federal Regulations (10 CFR), we have determined that the draft SE may contain proprietary information. If you believe that any information in the draft SE is proprietary, please identify such information line-by-line and define the basis pursuant to the criteria of 10 CFR 2.390. Use double brackets and yellow highlight to identify any ((proprietary information)). After 10 working days, the draft SE will be made publicly available, if appropriate.
Your response must be via a letter from an authorized individual. In addition, please provide an electronic redline/strikeout Word version of the SE either via email or the box.com folder. It helps expedite the NRC staff response to comments if Holtec provides in the formal transmittal and in a separate Word file, a table with the following columns; Comment No., Page No., and Line No., Comment Type (if comments other than proprietary information are provided (i.e., clarity, accuracy)), Suggested Revision, and a blank column NRC Disposition. However, Holtec may provide its comments in any format it chooses.
The final SE will be issued after making any necessary changes.
Note that at this stage of the process, the NRC staff has completed its review of the submitted information and will only entertain technical discussions regarding the open items identified in the draft SE. The staff conclusions and conditions will not change unless new information is provided that was not available during our review. If Holtec would like to discuss the draft SE in detail, we can do that in a noticed meeting that can be closed if proprietary information will be discussed.
Both this email and the draft SE have been placed in ADAMS and made Official Agency Records. The draft SE is declared as nonpublic because it may contain proprietary information. This email is declared public.
If you have any questions, please feel free to contact me at 301-415-2375 or by email at Leslie.Perkins@nrc.gov.
Sincerely, Leslie Perkins Project Manager, Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation e-mail: Leslie.Perkins@nrc.gov Phone: 301-415-2375 Docket Nos.: 72-1014 & 72-1032