Safety Evaluation Re Potential Hazards Associated W/ Operation of & Potential Explosion Accidents at Rockwood Stone,Inc Quarry.Hazards Considered Insignificant,Based on Util Confirmatory Analysis & Independent NRC EvaluationML20236A398 |
Person / Time |
---|
Site: |
Fermi ![DTE Energy icon.png](/w/images/5/5b/DTE_Energy_icon.png) |
---|
Issue date: |
10/15/1987 |
---|
From: |
Office of Nuclear Reactor Regulation |
---|
To: |
|
---|
Shared Package |
---|
ML20236A375 |
List: |
---|
References |
---|
NUDOCS 8710220236 |
Download: ML20236A398 (3) |
|
Similar Documents at Fermi |
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20217N4381999-10-25025 October 1999 Safety Evaluation Supporting Amend 17 to License DPR-9 ML20206J9301999-05-10010 May 1999 SER Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Powered-Operated Gate Valves ML20206G5081999-05-0505 May 1999 Safety Evaluation Approving Request for Relief PR-8,Rev 2 on Basis That Licensee Committed to Meet All Related Requirements of ASME OM-6 Std & PR-12 on Basis That Proposed Alternative Will Provide Acceptable Level of Safety ML20205Q7141999-04-15015 April 1999 Safety Evaluation Supporting Amend 16 to License DPR-9 ML20204E0371999-03-17017 March 1999 Safety Evaluation Accepting Licensee Request for NRC Approval of Alternative Rv Weld Exam,Per Provisions of 10CFR50.55a(a)(3)(i) & 10CFR50.55a(g)(6)(ii)(A)(5) for Plant,Unit 2 for 40-month Period ML20198S3341999-01-0606 January 1999 Safety Evaluation Supporting Amend 15 to License DPR-9 ML20154R2331998-10-21021 October 1998 Safety Evaluation Supporting Amend 13 to License DPR-9 ML20154L1031998-10-14014 October 1998 Safety Evaluation Accepting Licensee Response to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode ML20153B8811998-09-18018 September 1998 Safety Evaluation Accepting Request for Relief from Certain Requirements of ASME Boiler & Pressure Vessel Code,Section Xi,For Plant,Unit 2 ML20151X0651998-09-11011 September 1998 Safety Evaluation Re Inservice Testing Program Relief Request VR-63 for Plant ML20237E1171998-08-25025 August 1998 Safety Evaluation Accepting Licensee Relief Requests for First 10-yr Interval Inservice Insp Nondestructive Exam Program ML20236X8611998-08-0505 August 1998 SER Related to Revised Feedwater Nozzle Analysis to Facility Operating License NPF-43,Enrico Fermi Nuclear Power Plant, Unit 2 ML20236K3261998-07-0101 July 1998 SER Accepting Licensee Response Related to Revised Feedwater Nozzle Analysis to License NPF-43 for Enrico Fermi Nuclear Power Plant,Unit 2 ML20198L4241998-01-0808 January 1998 Safety Evaluation Accepting Proposed Rev 2 to Relief Request VR-51 Under Fermi 2 Pump & Valve Inservice Testing Program Per 10CFR50.55a(f)(6)(i) for First 10-yr Interval ML20217E9071997-10-0202 October 1997 Safety Evaluation Accepting Licensee Request for Relief from Certain ISI Requirements of ASME Boiler & Pressure Vessel Code,Section XI for Plant,Unit 2 ML20210R0501997-08-22022 August 1997 Safety Evaluation Accepting Revised Fermi-2 Control Ctr HVAC Sys Design Criteria in Design Criteria Document Submitted by Detroit Edison ML20138L7961997-02-19019 February 1997 SER Related to Inservice Testing Program Relief Request Detroit Edison Co,Fermi Unit 2 ML20133L7371997-01-0202 January 1997 Safety Evaluation Supporting Amend 11 to License DPR-9 ML20059J4591994-01-25025 January 1994 Safety Evaluation Supporting Request for Relief from ASME Code Re Inservice Testing Requirements to Measure Vibration Amplitude Displacement ML20125C8041992-12-0808 December 1992 Safety Evaluation Accepting Util 920729 Revised Feedwater Nozzle Analysis for Plant,Per Generic Ltr 81-11 ML20246B2891989-04-28028 April 1989 Safety Evaluation Supporting Amend 9 to License DPR-9 ML20244B7141989-04-0404 April 1989 SER Accepting Util Responses to Generic Ltr 83-28,Item 4.5.2, Reactor Trip Sys Reliability ML20237A7051987-12-10010 December 1987 Safety Evaluation Re Util Response to Generic Ltr 83-28, Item 2.1,Part 2 Requiring Confirmation That Interface Established W/Nsss or W/Vendors of Each Reactor Trip Sys Components.Response Acceptable ML20237A6971987-12-10010 December 1987 Safety Evaluation Re Util Response to Generic Ltr 83-28, Item 2.1,Part 1 Requiring Confirmation That All Reactor Trip Sys Components Identified as safety-related.Response Acceptable ML20237B4091987-12-0808 December 1987 SER Accepting Util Response to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re post-maint Testing (Reactor Trip Sys Components, All Other safety-related Components) ML20236L6551987-11-0404 November 1987 SER Re Generic Ltr 83-28,Item 2.2.1, Equipment Classification Programs for All Safety-Related Components. Util 831103 Response Acceptable ML20236A3981987-10-15015 October 1987 Safety Evaluation Re Potential Hazards Associated W/ Operation of & Potential Explosion Accidents at Rockwood Stone,Inc Quarry.Hazards Considered Insignificant,Based on Util Confirmatory Analysis & Independent NRC Evaluation ML20235S8731987-10-0606 October 1987 Safety Evaluation Re First 10-yr Interval Inservice Insp Program.Relief Granted from Exam & Testing Requirements of ASME Code & Alternate Methods Imposed Through Document ML20236D7421987-07-28028 July 1987 Safety Evaluation Re Main Steam Instrument Line Leaks. Licensee Satisfactorily Resolved Problems Re Main Steam Instrument Line Leaks Which Occurred in Jan 1987 & Recurred in Apr 1987 ML20206B5371987-04-0707 April 1987 Safety Evaluation Supporting Util Request to Amend License Condition 2.C(10), Emergency Diesel Generator Lube Oil Surveillance Program. NRC Does Not Agree Condition Should Be Revised by Substituting for Mar 1985 Ltr ML20207R8541987-03-12012 March 1987 Safety Evaluation Re Facility Mark I Containment Vacuum Breaker Structural Integrity.Licensee Restored Safety Margins of Breakers by Replacing Critical Parts W/Adequate Matl.Corrective Action Acceptable ML20212E3161987-02-27027 February 1987 Safety Evaluation Re Operation of Rockwood Stone,Inc Quarry Near Plant ML20212J8421987-02-26026 February 1987 Safety Evaluation Approving Individual to Serve as Shift Operations Advisor,Per Generic Ltr 84-16 IR 05000341/19850501987-01-16016 January 1987 Safety Evaluation Re Proposed Fire Protection Mod to Independent Alternative Safe Shutdown Capability to Satisfy Open Items in Insp 50-341/85-50 ML20215E0061986-12-12012 December 1986 Safety Evaluation Supporting Util Responses to Generic Ltr 83-28,Item 2.1 (Part 1) Re Equipment Classification of Reactor Trip Sys Components ML20203L5701986-08-19019 August 1986 Safety Evaluation Supporting Proposed Tech Specs Re Alternative Shutdown Sys.Acceptability Based,In Part,On Performance of Tests in Accordance W/Reg Guide 1.68, Initial Test Programs for Water-Cooled Nuclear Plants ML20207H5551986-07-16016 July 1986 SER Re Corrective Actions for Emergency Diesel Generators. Concurs W/Licensee Proposed Special Bearing Insp,Provided Envelope Provided by Demonstration Test Program Not Exceeded ML20154L4261985-04-18018 April 1985 Safety Evaluation Supporting 1983 ASME Code,Section XI, Paragraph IWV-3520 Requirement for Periodic Closure Verification Testing of Normally Closed Check Valves w/safety-related Functions 1999-05-05
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N4381999-10-25025 October 1999 Safety Evaluation Supporting Amend 17 to License DPR-9 ML20217P3551999-10-22022 October 1999 LER 99-S01-00:on 990922,loaded 9mm Handgun Was Discovered on Truck Cargo Area of Vehicle Inside Protected Area.Caused by Inadequate Vehicle Search.Guidance in Procedures & Security Training to Address Multiple Vehicle Searches Was Provided NRC-99-0095, Monthly Operating Rept for Sept 1999 for Fermi 2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Fermi 2.With NRC-99-0067, Monthly Operating Rept for Aug 1999 for Fermi 2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Fermi 2.With NRC-99-0065, Monthly Operating Rept for July 1999 for Fermi 2.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Fermi 2.With NRC-99-0088, Detroit Edison Co Enrico Fermi Atomic Power Plant,Unit 1 Annual Rept for Period 980701-990630. with1999-06-30030 June 1999 Detroit Edison Co Enrico Fermi Atomic Power Plant,Unit 1 Annual Rept for Period 980701-990630. with NRC-99-0064, Monthly Operating Rept for June 1999 for Fermi 2.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Fermi 2.With NRC-99-0062, Monthly Operating Rept for May 1999 for Fermi 2.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Fermi 2.With ML20206J9301999-05-10010 May 1999 SER Concluding That Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Powered-Operated Gate Valves ML20206G5081999-05-0505 May 1999 Safety Evaluation Approving Request for Relief PR-8,Rev 2 on Basis That Licensee Committed to Meet All Related Requirements of ASME OM-6 Std & PR-12 on Basis That Proposed Alternative Will Provide Acceptable Level of Safety NRC-99-0022, Monthly Operating Rept for Apr 1999 for Fermi 2.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Fermi 2.With ML20205Q7141999-04-15015 April 1999 Safety Evaluation Supporting Amend 16 to License DPR-9 ML20205P9721999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Fermi 2 ML20204E0371999-03-17017 March 1999 Safety Evaluation Accepting Licensee Request for NRC Approval of Alternative Rv Weld Exam,Per Provisions of 10CFR50.55a(a)(3)(i) & 10CFR50.55a(g)(6)(ii)(A)(5) for Plant,Unit 2 for 40-month Period ML20204D0361999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Fermi 2 ML20198S3341999-01-0606 January 1999 Safety Evaluation Supporting Amend 15 to License DPR-9 NRC-99-0005, Monthly Operating Rept for Dec 1998 for Fermi 2.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Fermi 2.With ML20207B7491998-12-31031 December 1998 1998 Annual Operating Rept for Fermi 2 ML20205Q9621998-12-31031 December 1998 Revised Monthly Operating Rept for Dec 1998 for Fermi 2 NRC-99-0021, 1998 Annual Financial Rept for Detroit Edison Co. with1998-12-31031 December 1998 1998 Annual Financial Rept for Detroit Edison Co. with NRC-98-0153, Monthly Operating Rept for Nov 1998 for Fermi 2.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Fermi 2.With NRC-98-0160, Monthly Operating Rept for Oct 1998 for Fermi 2.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Fermi 2.With ML20154R2331998-10-21021 October 1998 Safety Evaluation Supporting Amend 13 to License DPR-9 ML20154L1031998-10-14014 October 1998 Safety Evaluation Accepting Licensee Response to NRC Bulletin 95-002, Unexpected Clogging of Residual Heat Removal Pump Strainer While Operating in Suppression Pool Cooling Mode NRC-98-0139, Monthly Operating Rept for Sept 1998 for Fermi,Unit 2.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Fermi,Unit 2.With ML20154H8161998-09-30030 September 1998 Rev 0 to COLR Cycle 7 for Fermi 2 ML20153B8811998-09-18018 September 1998 Safety Evaluation Accepting Request for Relief from Certain Requirements of ASME Boiler & Pressure Vessel Code,Section Xi,For Plant,Unit 2 ML20151X0651998-09-11011 September 1998 Safety Evaluation Re Inservice Testing Program Relief Request VR-63 for Plant NRC-98-0111, Monthly Operating Rept for Aug 1998 for Fermi 2.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Fermi 2.With ML20153B7921998-08-31031 August 1998 Rev 0 to Fermi 1 Sar ML20237E1171998-08-25025 August 1998 Safety Evaluation Accepting Licensee Relief Requests for First 10-yr Interval Inservice Insp Nondestructive Exam Program ML20236X8611998-08-0505 August 1998 SER Related to Revised Feedwater Nozzle Analysis to Facility Operating License NPF-43,Enrico Fermi Nuclear Power Plant, Unit 2 NRC-98-0109, Monthly Operating Rept for July 1998 for Fermi 21998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Fermi 2 ML20236K3261998-07-0101 July 1998 SER Accepting Licensee Response Related to Revised Feedwater Nozzle Analysis to License NPF-43 for Enrico Fermi Nuclear Power Plant,Unit 2 NRC-98-0097, Monthly Operating Rept for June 1998 for Fermi,Unit 21998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Fermi,Unit 2 NRC-98-0127, Annual Rept for Period 970701-9806301998-06-30030 June 1998 Annual Rept for Period 970701-980630 NRC-98-0079, Monthly Operating Rept for May 1998 for Fermi 21998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Fermi 2 NRC-98-0076, Monthly Operating Rept for Apr 1998 for Fermi 21998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Fermi 2 NRC-98-0072, Monthly Operating Rept for Mar 1998 for Fermi 21998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Fermi 2 NRC-98-0050, Monthly Operating Rept for Feb 1998 for Fermi 21998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Fermi 2 NRC-98-0019, Monthly Operating Rept for Jan 1998 for Fermi 21998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Fermi 2 ML20198L4241998-01-0808 January 1998 Safety Evaluation Accepting Proposed Rev 2 to Relief Request VR-51 Under Fermi 2 Pump & Valve Inservice Testing Program Per 10CFR50.55a(f)(6)(i) for First 10-yr Interval NRC-98-0015, Monthly Operating Rept for Dec 1997 for Fermi 21997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Fermi 2 ML20217N3821997-12-31031 December 1997 Annual Operating Rept for 970101-1231 NRC-98-0053, 1997 Annual Financial Rept for Detroit Edison Company1997-12-31031 December 1997 1997 Annual Financial Rept for Detroit Edison Company ML20205Q9601997-12-31031 December 1997 Revised Monthly Operating Rept for Dec 1997 for Fermi 2 NRC-97-0141, Deficiency Rept Re Malfunction of EDG Number 11 Automatic Voltage Regulator (AVR) Printed Circuit Board Rev B,Due to Failure of Operational Amplifier U8 Chip.Avr Board Rev B Was Sent Offsite to Independent Engineering Facility1997-12-23023 December 1997 Deficiency Rept Re Malfunction of EDG Number 11 Automatic Voltage Regulator (AVR) Printed Circuit Board Rev B,Due to Failure of Operational Amplifier U8 Chip.Avr Board Rev B Was Sent Offsite to Independent Engineering Facility ML20197A9921997-12-15015 December 1997 Rev 0 to Efp,Unit 1 Fermi 1 Sar NRC-97-0131, Monthly Operating Rept for Nov 1997 for Fermi 21997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Fermi 2 ML20248H1151997-10-31031 October 1997 Rev 1 to Colr,Cycle 6 for Fermi 2 1999-09-30
[Table view] |
Text
. I cMtos
/ ~go UNITED STATES
.g!"S 9 g NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 j
,o
- SAFETY EVALUATION BY THE OFFICE OF NRR RELATED TO THE OPERATION OF THE ROCKWOOD STONE INC. QUARRY DETROIT EDISON COMPANY (DECO)
Fermi-2 (Docket No. 50-341)
- 1. 0 INTRODUCTION By letter dated February 27, 1987, the NRC staff issued a Safety Evaluation Report (SER) regarding the potential hazards associated with the operation of, and the potential explosion accidents at, the Rockwood Stone, Inc. (RSI) quarry. In that SER the staff had determined that the operation of the RSI quarry was not expected to adversely affect the safe operation of the Fermi-2 plant. In particular the staff found that the postulated explosions of bulk quantities of the explosives stored at the quarry site did not pose a significant hazard to the safe operation of the plant. The staff believed that the associated ground motion and the peak hydrostatic pressures might also be insignificant. However, the staff required the licensee, DECO, to provide a confirmatory analysis of the postulated explosions to demonstarte that the ground motion and the hydrostatic pressure change hazards are insignificant with respect to the safe operation of the Fermi-2 plant. Be letter dated April 20, 1987, the licensee has submitted the confirmatory analysis requested in the SER. This safety evaluation describes the results of the staff's review of the licensee's submittal.
l 2.0 EVALUATION In the SER Dated February 27, 1987, the staff considered the potential ground l motion effects due to the detonation of the maximum stored explosives of 80000 '
pounds of ammonium nitrate fuel oil (ANF0) at the RSI quarry and due to the i detonation of a shipment of 40,000 pounds at the closest approach (two miles from Fermi-2). The staff compared the information pertaining to the RSI i quarry at Fermi-2 with similar data related to another nuclear power plant '
(where a quarry had used 82000 pounds of explosives) which had been previously reviewed and found safe. The findings for the other power plant were that the free field peak ground acceleration was less than 0.02g due to l the detonation of the explosives at a distance of 8700 feet. In view of the Fermi-2 seismic design values (i.e., SSE = 0.15g and OBE = 0.08g) and the distance (minimum of two miles) from the quarry to the plant, the staff expected that the potential ground motion at the Fermi-2 plant site was acceptably low. However, the staff felt that differences in subsurface geology between the Fermi-2 site and the previously analyzed site could affect ground motion and hydrostatic pressures. Therefore, the staff requested DECO to provide a confirmatory analysis of the postulated explosions and their effects on ground motion and peak hydrostatic pressures to demonstrate that the potential hazard was insignificant. The analysis was also to include a review of Fermi-2 construction activities and list any damages to structures due to the blasting that has occurred at the RSI quarry.
gDR710220236 871015-p ADOCK 05000341 PDR
- _ _ _ _ _ _ _ - __ l
e , > \
-l 7 In its confirmatory analysis dated April 20, 1987, the licensee nas considered o the storage of explosives in the delivery trailers -at the quarry about 4 feet !
above the ground surface level to be equivalent to a transit condition.
Therefor, the licensee has used the Regulatory Guide 1,91 (Ref 1) as the basis to evaluate the blast induced overpressure effects. The licensee has used the U.S. Navy Design Manual 7.2 Foundations and Earth Structures (Ref 2) to estimate the ground motion effects due to blasting.
The detailed calculations furnished with the licensee's letter of April 20, 1987, confirm that neither the blast-induced overpressure nor the ground motion effects pose a hazard to the Fermi-2 plant. The licensee estimated the peak hydrostatic pressures due to blasting by relating accelerations and '
displacement due to blasting with displacements due to the safe shutdown earthquake (SSE). The increase in the hydrostatic pressure due to blasting was then compared to the hydrostatic pressure due to the probable maximum flood at Fermi-2 and found to be insignificant.
With reference to the question of any damages to structures (on site or off site) due to the blasting at the RSI quarry, the licensee has furnished a private Consultant's report to show that the blasting activities at RSI quarry were not responsible for the residential damages that have been reported off site. The licensee has also reported that the construction activities at Fermi-2 extended from 1970 through 1984 whereas the RSI quarry has been in operation since 1982. No evidence of structural damage due to blasting activities at the RSI Quarry to any safety-related structures at Fermi-2 site was noticed during an examination of these structures conducted after the Perry, Ohio, earthquake of January 31, 1986.
The staff performed an independent evaluations of the blast generated displacements, velocities, and accelerations of the ground using the empirical relationships given in Hendron's paper, " Engineering of Rock Blasting on Civil Projects" (Ref 3). This evaluation also indicated that the ground motions due to the blasting activities at the RSI quarry have no adverse effects on the safety of the Fermi-2 power plant structures. This evaluation was made assuming the shortest distance from the RSI quarry to the safety-related structures is about two miles. However, the licensee does not own the land between the quarry and the plant boundary, and has no control over the quarry operation. Therefore, the licenses should reevaluate the safety of the plant and inform the NRC if and when the distance from the quarry to the safety-related structures becomes shorter than two miles. Our preliminary evaluation indicated that there will be no safety hazard even if the distance from the quarry becomes one mile.
3.0 CONCLUSION
S The staff has reviewed the licensee's confirmatory analysis of the effects of postulated explosions in connection with the operation of the RSI quarry in )
the vicinity of the Fermi-2 plant. Based on this analysis and on the independent evaluation by the NRC staff the staff is satisfied that the hazards due to blast-induced overpressure, ground motion and hydrostatic pressure changes are insignificant with respect to the Fermi-2 nuclear plant. i The licensee should, however, reevaluate the safety of the plant if the distance from the RSI quarry to the safety-related structures at the plant becomes less than two miles.
{
f.
I.
?'
4.0 REFERENCES
- 1. U.S. Nuclear Regulatory Commission Regulatory Guide No.1.91. ,
- 2. U.S. Navy Design Manual No. 7.2, Foundations and Earth Structures, 1982.
- 3. Hendron, A.J. " Engineering of Rock Blasting on Civil Projects."